  1. Slide 1: ACG Electric Metals

    Slide 1: ACG Electric Metals

    ACG Electric Metals Creation of a focused supplier of green metals into the western OEM value chain & a platform to grow and consolidate June 2023

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer IMPORTANT: Please read the following before continuing. The following applies to this document, which has been prepared and issued by, and is the sole responsibility of, ACG Acquisition Company Limited (the “Company”) solely for discussion and feedback purposes in relation to the Company,

  3. Slide 3: Transaction overview

    Slide 3: Transaction overview

    Transaction overview ▪ ACG to acquire the Santa Rita nickel sulphide and Serrote copper mines from Appian Capital for US$1.0 billion plus US$65m associated with Appian Valuation Capital’s contemplated gold royalty on Serrote, for a total enterprise value of US$1.065 billion1 ▪ US$600m+ equity fundin

  4. Slide 4: Key global trends in mining

    Slide 4: Key global trends in mining

    Key global trends in mining Clean energy revolution Supply chain polarisation Responsible mining Consumer & manufacturer push for strong 28 29 27 Ni Cu Co ESG standards Nickel Copper Cobalt 3 25 Rare Earth Li Mn Metals Lithium Manganese Increased demand for metals critical to Securing critical suppl

  5. Slide 5: ACG Electric Metals' vision and strategy are shared by our blue-chip Partners

    Slide 5: ACG Electric Metals' vision and strategy are shared by our blue-chip Partners

    ACG Electric Metals’ vision and strategy are shared by our blue-chip Partners… 1 2 3 4 5 6 28 29 Ni Nickel Cu Copper $ Critical Minimal carbon Producing, Safe Stellar Attractive value minerals footprint & best- low cost, jurisdiction management in-class ESG & long life team 5

  6. Slide 6: To create a Tier 1 critical minerals business

    Slide 6: To create a Tier 1 critical minerals business

    …To create a Tier 1 critical minerals business ACG Electric Metals (“ACG”) will initially comprise the Serrote and Santa Rita Asset location mining complex 28 Ni 29 Cu • Nickel sulphide and copper concentrates • Lowest 10% of the global carbon emissions curve Brazil Serrote • Commitment to IRMA stan

  7. Slide 7: Brazil – an excellent mining jurisdiction

    Slide 7: Brazil – an excellent mining jurisdiction

    Brazil – an excellent mining jurisdiction Established legal framework & Established mining jurisdiction Strategic Minerals policy Presence of leading mining companies Favourable tax system Supportive local community & skilled workforce Renewables-based power supply Attractive supply source for weste

  8. Slide 8: Integration into western OEM supply chain

    Slide 8: Integration into western OEM supply chain

    Integration into western OEM supply chain ACG Electric Metals will be the cornerstone of a reliably and ethically sourced battery metals supply chain to power a de-carbonized future Serrote Brazil Santa Rita Mining Processing End users Battery grade nickel sulphide and copper Final product to be inc

  9. Slide 9: Battery-grade nickel sulphide and copper produced in the lowest 10% of the global carbon emissions curve

    Slide 9: Battery-grade nickel sulphide and copper produced in the lowest 10% of the global carbon emissions curve

    Battery-grade nickel sulphide and copper produced in the lowest 10% of the global carbon emissions curve Atlantic Nickel (Santa Rita) first decile carbon emissions1 Cumulative Production Percentile (%) Scope 1 Scope 2 0% 25% 50% 75% 100% CO2e Intensity (tCO2e/t NiEq) 300 Freight & Port Downstream Pr

  10. Slide 10: Excellent growth platform and an ideal fit with ACG's strategy

    Slide 10: Excellent growth platform and an ideal fit with ACG's strategy

    Excellent growth platform and an ideal fit with ACG’s strategy Highly attractive market fundamentals with strong demand for critical metals expected over the next 30 years with the 1 backdrop of declining supply Newly-built, operating nickel and copper business with high cash flow generation capabil

  11. Slide 11: ACG leadership team

    Slide 11: ACG leadership team

    ACG leadership team Executive team Chairman Artem Volynets Carole Whittall Peter Whelan Chief Executive Officer and Executive Director Chief Financial Officer Independent Chairman • 25+ years experience in mergers and • Executive Director and CFO of Yellow • Significant experience in executing acqui

  12. Slide 12: Operating team

    Slide 12: Operating team

    Operating team Accomplished operating team Paulo Castellari Porchia Milson Mundim Tony Lima Chief Executive Officer Chief Financial Officer Chief Operations Officer • 30+ years in the mining and • 25+ years in the mining and • 18+ years of experience in industrial sectors, including 13 finance secto

  13. Slide 13: The case for investing in critical metals

    Slide 13: The case for investing in critical metals

    The case for investing in critical metals Scaled production of key commodities… …to fuel the global energy transition Combined payable production forecast1 (kt NiEq2) Spending on green infrastructure3 (US$ billion) % battery metals2 ✓ Annual investment in clean technologies expected to nearly triple

  14. Slide 14: Supportive price outlook for ACG's key commodities

    Slide 14: Supportive price outlook for ACG's key commodities

    Supportive price outlook for ACG’s key commodities Global supply demand gap1,2 Commodity price forecast2,3 (US$/lb) Commentary (kt) $15.00 29 ✓ Infrastructure pledges requiring more steel 3 globally $12.00 ✓ Supply and demand imbalance into late Nickel (18) (13) $9.00 2020s supporting nickel prices

  15. Slide 15: Two high-quality operations on the Brazilian coast

    Slide 15: Two high-quality operations on the Brazilian coast

    Two high-quality operations on the Brazilian coast Overview and location of the target business Atlantic Nickel (Santa Rita) Mineraçao Vale Verde (Serrote) ◼ Long-life, low-cost nickel sulphide deposit in a mining-friendly Brazil ◼ Well-defined, scalable shallow copper deposit in a mining-friendly B

  16. Slide 16: An example of the highly efficient approach to mining under Appian Brazil management

    Slide 16: An example of the highly efficient approach to mining under Appian Brazil management

    An example of the highly efficient approach to mining under Appian Brazil management 2015 2019 2021 Mirabela Nickel, previous operator of the Following a complete plant overhaul and new Operations at Santa Rita and construction Santa Rita mine, brought into voluntary operating model, Santa Rita re-s

  17. Slide 17: Solid health and safety performance indicators

    Slide 17: Solid health and safety performance indicators

    Solid health and safety performance indicators HPI1 LTIFR2 TRIFR3 VFLs4 ATN # of events pa ATN Per 1m man-hours ATN Per 1m man-hours ATN Per ‘000 interactions pa 0.60 4.4 6 2.21 2.22 5 5 3.9 1.79 1.46 2.9 1.31 3 2 0.21 0.18 0.19 1.0 2019 2020 2021 2022 YTD 2019 2020 2021 2022 YTD 2019 2020 2021 2022

  18. Slide 18: Comprehensive approach to sustainability and stakeholder engagement

    Slide 18: Comprehensive approach to sustainability and stakeholder engagement

    Comprehensive approach to sustainability and stakeholder engagement The target business is acutely focused on sustainability, utilising a differentiated approach that is highlighted by strong ESG governance Taxes and royalties1 Water consumption Agreed >US$2.8 billion ~70% - 90% of achieved or targe

  19. Slide 19: A proven operating model has delivered tangible results

    Slide 19: A proven operating model has delivered tangible results

    A proven operating model has delivered tangible results Atlantic Nickel – restart MVV – ramp-up Plant feed (% of nominal capacity @ 542ktpm) Plant feed (% of nominal capacity @ 342ktpm) Nominal capacity Nominal capacity 120% 101% 100% 109% 103%120% 105% 108% 99% 100% 100% 81% 2021 (Actual) 80% Plant

  20. Slide 20: A stable and capable system is the ultimate goal

    Slide 20: A stable and capable system is the ultimate goal

    A stable and capable system is the ultimate goal Atlantic Nickel – Metallurgical recovery (%) Met recovery 2019 2020 2021 2022 20231 Variability (σ/µ) % 15.8 7.7 3.1 3.9 3.7 Capability (%) 95.2 95.5 98.0 98.0 98.0 ✓ Well established process ✓ Excellent results achieved and fit-for-purpose tools to i

  21. Slide 21: Strong operating and financial performance in recent years

    Slide 21: Strong operating and financial performance in recent years

    Strong operating and financial performance in recent years Atlantic Nickel (Santa Rita) Mineraçao Vale Verde (Serrote) Payable NiEq production (kt) and C1 cash cost1,2 (US$/lb) Payable CuEq production (kt) and C1 cash cost1,2 (US$/lb) 14.8 19.7 13.6 $3.84 7.7 $1.73 $4.22 $3.40 1.5 $2.75 2020A 2021A

  22. Slide 22: Scaled, low-cost production over multiple decades

    Slide 22: Scaled, low-cost production over multiple decades

    Scaled, low-cost production over multiple decades Payable production (kt NiEq) and C1 cash cost1,2 (US$/lb NiEq real) EBITDA profile1,2,3 (US$ millions) Santa Rita NiEq production (OP) Santa Rita NiEq production (UG) Serrote NiEq production Consolidated C1 cash costs (NiEq) Santa Rita May YTD nickel

  23. Slide 23: On-site resource potential from resource conversion

    Slide 23: On-site resource potential from resource conversion

    On-site resource potential from resource conversion Atlantic Nickel (Santa Rita) Mineraçao Vale Verde (Serrote) ✓Significant ✓84 Mt M&I and 4.5 Mt mineralization Inferred sulphide intersected by resources outside of ongoing drilling at OP the current pit design and UG targets ✓Potential to define ✓P

  24. Slide 24: Large, unexplored land packages for further growth

    Slide 24: Large, unexplored land packages for further growth

    Large, unexplored land packages for further growth Atlantic Nickel (Santa Rita) Mineraçao Vale Verde (Serrote) ✓Expansive land ✓Expansive land package with 32 package with 10 tenements covering tenements covering c.36k ha c.14k ha ✓Preliminary Economic ✓Identified Palestina Assessment currently depo

  25. Slide 25: Rare opportunity to acquire a London-listed nickel producer of scale

    Slide 25: Rare opportunity to acquire a London-listed nickel producer of scale

    Rare opportunity to acquire a London-listed nickel producer of scale with pure play electric metals exposure Exceptional opportunity to acquire a top-10 nickel sulphide mine1 Scarce, attractive production mix across both target assets Santa Rita LoM production3 vs. comparable nickel sulphide mines A

  26. Slide 26: EBITDA sensitivity to commodity prices and operating costs

    Slide 26: EBITDA sensitivity to commodity prices and operating costs

    EBITDA sensitivity to commodity prices and operating costs1,2,3 LoM average EBITDA1 – Forward prices5 (US$m real) LoM average EBITDA1 – Consensus prices4 (US$m real) Implied LT commodity prices (US$/lb) Implied LT commodity prices (US$/lb real) Nickel: 14.51 13.35 12.19 11.61 11.03 9.87 8.71 Nickel:

  27. Slide 27: Illustrative trading EV/EBITDA multiples

    Slide 27: Illustrative trading EV/EBITDA multiples

    Illustrative trading EV/EBITDA multiples ACG Electric Metals illustrative peer EV/EBITDA 2024E trading multiples1,2 ACG Electric Metals3,4 Clean Metal Miners Base Metals Diversified Majors 12.7x Recent Indonesian nickel business IPO 8.3x Average: 7.3x 6.6x 6.2x 6.0x 6.0x 5.7x Average: 4.9x 5.7x 4.9x

  28. Slide 28: Illustrative trading P/NAV multiples

    Slide 28: Illustrative trading P/NAV multiples

    Illustrative trading P/NAV multiples ACG Electric Metals illustrative peer P/NAV trading multiples1,2 ACG Electric Metals3 Clean Metal Miners Base Metals Diversified Majors 1.2x 1.2x 1.0x Average: 1.0x 1.0x 0.9x 0.9x Average: 0.9x 1.0x 0.9x 0.8x 0.8x 0.8x 0.8x 0.8x Average: 0.7x 4 0.7x 0.6x 0.6x 0.6

  29. Slide 29: Timeline to closing

    Slide 29: Timeline to closing

    Timeline to closing Key dates Publication of Competent Person’s 12th June Reports Acquisition agreement and public 12th June announcement Publication of analyst research and 16th June – 29th June investor education Publication of prospectus and 30th June circular Management roadshow 30th June – 14th

  30. Slide 30: High-quality critical metals business integrating into the western OEM supply chain

    Slide 30: High-quality critical metals business integrating into the western OEM supply chain

    High-quality critical metals business integrating into the western OEM supply chain 28 29 Ni Nickel Cu Copper $ Critical Minimal carbon Producing, Safe Stellar Attractive value minerals footprint & best- low cost, jurisdiction management in-class ESG & long life team 30

  31. Slide 31: Santa Rita: Overview

    Slide 31: Santa Rita: Overview

    Santa Rita: Overview 31

  32. Slide 32: Overview of Santa Rita

    Slide 32: Overview of Santa Rita

    Overview of Santa Rita A safe, sustainable, low-cost operation with the ability to deliver key battery metals over multiple decades Summary A view from site ◼ Rare nickel sulphide resource, a key input in class 1 products used in EVs ◼ Significant scale with LoM average NiEq production of 31ktpa und

  33. Slide 33: Santa Rita's high safety standard for tailings management

    Slide 33: Santa Rita's high safety standard for tailings management

    Santa Rita’s high safety standard for tailings management Robust downstream constructed tailings storage facility designed by top international firm in accordance with international guidelines and operated with best practices Atlantic Nickel tailings storage facility (TSF) standards 1 Atlantic Nicke

  34. Slide 34: Efficient operations with a favourable cost position

    Slide 34: Efficient operations with a favourable cost position

    Efficient operations with a favourable cost position Focus on maintaining a defensive cost position on the back of high plant throughput and a more selective mining method, improved recoveries with focus on sulphide nickel, higher grades underground, and attractive offtake terms Key cost position dr

  35. Slide 35: Operational performance update

    Slide 35: Operational performance update

    Operational performance update Operations have continued to improve throughout 2021 and 2022 Key takeaways Total material mined3 (Mt) Plant feed3 (kt) 2020 Total material 2021 Total material Total material ◼ Strong operational performance in 2022: mined: ~17.6 Mt mined: ~23.5 Mt mined: ~37.2 Mt 2020

  36. Slide 36: A stable and capable system and proven operating model

    Slide 36: A stable and capable system and proven operating model

    A stable and capable system and proven operating model Metallurgical recovery (%) Restart Plant feed (% of nominal capacity @ 542ktpm) Nominal capacity 100% 109% 103%120% 99% 100% 81% 80% 84% 50% 60% 49% 40% 20% 0% O D F A J A O D F A J A O D F A J A O D F A 2019 2020 2021 2022 2023 Day Met recovery

  37. Slide 37: Financial performance update

    Slide 37: Financial performance update

    Financial performance update Record operational and financial performance achieved in 2021 and 2022. In addition, Atlantic Nickel delivered an upgraded underground resource Reserves and resources1 Payable NiEq production2 (kt) and C1 cash cost2 (US$/lb) Open Pit Tonnes (kt) NiS (%) Cu (%) Co (%) 202

  38. Slide 38: Significant value optimisation and expansion opportunities

    Slide 38: Significant value optimisation and expansion opportunities

    Significant value optimisation and expansion opportunities Atlantic Nickel is advancing various value optimisation and growth initiatives Underground development Palestina and regional exploration Owner mining ■ Post-tax NPV8% of US$942m1 ■ Regional exploration portfolio of 38 tenements ■ Multi-year

  39. Slide 39: Near-term resource growth targets at Santa Rita

    Slide 39: Near-term resource growth targets at Santa Rita

    Near-term resource growth targets at Santa Rita Significant opportunity to increase resources and extend the mine life of both open pit and underground operations Santa Rita underground and pit extension targets1 Near-mine target opportunities 1 Southern strike extensions: – Definition of drill targ

  40. Slide 40: Development path forward for underground operations

    Slide 40: Development path forward for underground operations

    Development path forward for underground operations Atlantic Nickel has significant flexibility as to the timing of the transition to underground (7-11 years) due to satellite deposits and possibility to extend open pit Santa Rita underground highlights Underground sublevel cave mine design ■ Transi

  41. Slide 41: Palestina discovery – Santa Rita look-alike at pre-resource stage

    Slide 41: Palestina discovery – Santa Rita look-alike at pre-resource stage

    Palestina discovery – Santa Rita “look-alike” at pre-resource stage New zone discovered at Palestina with the potential to add additional open pit resources that can be trucked to the Santa Rita processing plant; currently being progressed through the Atlantic Nickel development process Palestina ov

  42. Slide 42: Geotechnical standard controls and operational stability

    Slide 42: Geotechnical standard controls and operational stability

    Geotechnical standard controls and operational stability The geotechnical monitoring system of the Santa Rita open pit is composed of different types of equipment that complement the understanding of the rock mass movements / deformation 100% Controlled events 32 Controlled events (Since 2020) (Acti

  43. Slide 43: Serrote: Overview

    Slide 43: Serrote: Overview

    Serrote: Overview 43

  44. Slide 44: High quality operating copper mine in a mining-friendly jurisdiction

    Slide 44: High quality operating copper mine in a mining-friendly jurisdiction

    High quality operating copper mine in a mining-friendly jurisdiction Summary A view from site ■ Conventional open pit mine and processing operation producing high quality copper-gold concentrate ■ Ideally located with access to existing infrastructure and multiple nearby ports ■ Scalable deposit and

  45. Slide 45: Well-defined, scalable shallow copper deposit

    Slide 45: Well-defined, scalable shallow copper deposit

    Well-defined, scalable shallow copper deposit Mineralogy Drilling ■ The Serrote deposit is hosted in a layered complex of mafic to ultramafic rocks ■ As of 31 December 2022, the drill hole database consists of 9,631 drill holes made up of layers of ilmenite-magnetite, ortho-pyroxenite and norite (20

  46. Slide 46: Serrote's high safety standard tailings management

    Slide 46: Serrote's high safety standard tailings management

    Serrote’s high safety standard tailings management Tailings facility and dam design Aerial view of tailing storage facility ■ The construction of the dam started in 2020; in 2021, tailings began to be deposited using the conventional method (spigot) ■ The TSF is designed to accommodate 54 Mt of ore

  47. Slide 47: Defensive cost position driving strong operating margins

    Slide 47: Defensive cost position driving strong operating margins

    Defensive cost position driving strong operating margins Cost profile summary 2022 copper mines cost curve – by-product C1 cash cost (US$/lb)1 ■ Serrote’s LoM C1 cash costs are expected to be approximately US$1.37/lb $6.00 ■ There is a significant decrease in forecasted unit mining costs $5.00 from

  48. Slide 48: Ramp-up of Serrote

    Slide 48: Ramp-up of Serrote

    Ramp-up of Serrote Key takeaways Total material mined (Mt)1 Plant feed (kt) 1 2021 total material mined: 4,865 kt 2022 total material mined: 11,042 kt 2021 total feed: 1,155 kt 2022 total feed: 3,500 kt ■ Strong operating performance in 2022: 2021 avg. material mined: 2022 avg. material mined: 2021

  49. Slide 49: A stable and capable system and proven operating model

    Slide 49: A stable and capable system and proven operating model

    A stable and capable system and proven operating model Metallurgical recovery (%) Ramp-up progress Plant feed (% of nominal capacity @ 342ktpm) Nominal capacity 120% 105% 108% 101% 100% 2021 (Actual) Plant throughput: 105% 80% 82% 1,156 kt 51% 85% 60% 56% 49% 40% 19% 2022 (Actual) 2023 (Plan) Plant

  50. Slide 50: Strong financial performance post ramp-up

    Slide 50: Strong financial performance post ramp-up

    Strong financial performance post ramp-up Reserves and resources1 Payable CuEq production (Mlbs) and C1 cash cost2 (US$/lb) 2021 total payable CuEq: 3.4 Mlbs 2022 payable CuEq: 43.4 Mlbs Reserves Tonnes (Mt) Cu (%) Au (g/t) Cu (kt) Au (koz) 2021 C1 costs: $3.84/lb Cu 2022 C1 costs: $1.73/lb Cu $6.00

  51. Slide 51: Attractive near-term upside opportunities identified

    Slide 51: Attractive near-term upside opportunities identified

    Attractive near-term upside opportunities identified Pit expansion Oxide processing ■ Significant mineralization outside of the base case mine plan provides opportunity for ■ The Serrote deposit contains both sulphide ore and oxide ore organic expansion ̶ The existing operation only processes sulphi

  52. Slide 52: Regional exploration has the potential to unlock significant upside

    Slide 52: Regional exploration has the potential to unlock significant upside

    Regional exploration has the potential to unlock significant upside Summary of prospects Overview of exploration licenses Significant upside potential through several exploration licenses on which two Caboclo – Rogério E-W Section - 20 projects (Caboclo and Queimada Bonita) are already being advance

  53. Slide 53: Appendix

    Slide 53: Appendix

    Appendix 53

  54. Slide 54: Transaction structure

    Slide 54: Transaction structure

    Transaction structure ◼ ACG Electric Metals is acquiring Atlantic Nickel and MVV for consideration based on: – US$1.0 billion in enterprise value for Atlantic Nickel and MVV and the shareholder loans – US$65m in enterprise value associated with the contemplated Appian gold royalty on MVV1 – Issuance

  55. Slide 55: Sources & uses of ACG's acquisition of MVV and ATN

    Slide 55: Sources & uses of ACG's acquisition of MVV and ATN

    Sources & uses of ACG’s acquisition of MVV and ATN Cash uses (US$m) Cash sources (US$m) Uses Sources Redemption % 20% 80% Enterprise value as at 1/1/2023 1,000 Senior debt finance 225 225 Enterprise value to equity value adjustments (100) Royalty finance 250 250 Estimated locked box & SPA adjustment

  56. Slide 56: ACG securities in issue before and at closing

    Slide 56: ACG securities in issue before and at closing

    ACG securities in issue before and at closing Illustrative example for 80% redemption1 Notes Number of Securities 1 Issue price of US$10/share with option to redeem ahead of closing SHARES IN ISSUE BEFORE ACQUISITION ◼ Shares in issue post acquisition will vary between 12.5m (if 0% redemption ahead

  57. Slide 57: Debt, royalty and prepayment funding terms

    Slide 57: Debt, royalty and prepayment funding terms

    Debt, royalty and prepayment funding terms Senior Debt Royalty Agreement with Royal Gold Prepayment from PowerCo Senior Debt Terms Royalty Terms Prepayment Terms US$225m senior secured term facility + US$250m US$100m US$75m senior secured RCF ➢ US$215m precious metals royalties on gold from Serrote

  58. Slide 58: Offtake Agreement with Glencore

    Slide 58: Offtake Agreement with Glencore

    Offtake Agreement with Glencore ◼ Anchor equity investment of the lower of (i) US$100m; and (ii) 19.95% of the issued ordinary share capital of ACG ◼ Glencore to receive a growing portion of the nickel concentrate from Atlantic Nickel, up to 100% by 2027, on market terms Customers: ◼ Nickel concentr