Archer Materials Limited · ASX:AXE
Archer Materials — Archer Exploration — Investor Presentation (March 2010)
27 slides from Archer Materials's investor presentation, Mar 22, 2010
Slide 1: Outlook 2010 Investor Presentation March 2010
For personal use only OUTLOOK 2010 INVESTOR PRESENTATION MARCH 2010
Slide 2: Disclaimer
For personal use only Disclaimer Competent C t t persons statement t t t The exploration results reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr. Wade Bollenhagen, Exploration Manager of Archer Exploration Limited. Mr. Bollenhagen is a Member of the
Slide 3: Management
Management For personal use only Board • Greg English LLB, BE (Mining) Executive Chairman • Tom Phillips AM MBA FAICD Director (non‐executive) • Gerard Anderson MSc Grad Dip Bus Director (non‐executive) • Alice McCleary BEc FCA FTIA FAICD Director (non‐executive) Management Team Mr. Michael Hatcher
Slide 4: Archer (AXE)
Archer (AXE) For personal use only Listed Australian Stock Exchange 14th August 2007 64.42m Shares Market Cap (18th March) $8.7m 52 week Range $0.05-0.21 Cash 31st Dec.09 - $4.522m Top Five Shareholders Shares 1. Raffles Equities Ltd 11,721,249 18.19% Jan 28th 2010 2 2. GDE Exploration (SA) Pty Ltd
Slide 5: Exploration Projects
Exploration Projects For personal use only Manganese Uranium Nickel Pipeline Eyre Peninsula Gold Apollo 100% Pindari 100% Jamieson Tank Burra Nth 100% North Cowell 100% Riverton ELA 100% Wild Horse Plains TARGET Mn/Fe TARGET TARGET disseminated D Deposits it unconformity U3O8 Nickel sulphides Adelai
Slide 6: Manganese Tenements
Manganese Tenements For personal use only Stone Hut Mn ELA 100% Kanyaka Mn ELA 100% Jamieson Tank Fe/Mn / OMM Farmin Ketchowla Mn 100% Wild Horse Plains Fe/Mn USA Farmin Nth Cowell Fe/Mn 100% Neales Flat Mn ELA 100%
Slide 7: Manganese Background
Manganese Background For personal use only 4th Most consumed Metal after Fe, Al, Cu Increases steel hardness, toughness, stiffness, wear resistance Mantle for Cone Crusher Bearings, pins bushes Wear Plates – Lithium Manganese Battery Grader Blades Wear resistant steels have up to 14% Mn
Slide 8: Manganese Eyre Peninsula
Manganese Eyre Peninsula For personal use only Eyre Peninsula Project, 4 Els ,1042 sqr Kms
Slide 9: Jamieson Tank OMM Farmin
Jamieson Tank OMM Farmin For personal use only Carappee Hill EL 3711 Monax – OMM Mn Farmin Agreement JV Opportunity Jamieson Tank Archer (2008) CHRC014 9m @ 16.1% Mn from 41m 24m @ 12% Mn from 61m WMC (1993) SJPC41 11m @ 13% Mn from 12m. 5m @ 19.6% Mn from 41m. SJPC42 4m @ 18.9% Mn from 7m. 4m @ 17.
Slide 10: Eyre Peninsula Manganese Strategy
Eyre Peninsula Manganese Strategy For personal use only Mt Desperate Mt Shannan Sh
Slide 11: Manganese - Adelaidean
Manganese - Adelaidean For personal use only T Target t high hi h grade d Manganese M DSO •Tenements Near Transport Infrastructure • In remote locations, locations reduced land use conflict • 100% equity Targets • Ketchowla – Shallow drilling g Feb 2010 • Australia Plains– Neales Flat Mn Mine • ELA
Slide 12: Ketchowla Manganese
Ketchowla Manganese For personal use only K2 K1 Nth K9 Regional Rock Chip Sampling
Slide 13: Ketchowla Manganese
Ketchowla Manganese For personal use only K9 E-W cross section showing Manganese grades %
Slide 14: Ketchowla Manganese Ni/Co/Cu
Ketchowla Manganese Ni/Co/Cu For personal use only
Slide 15: West Roxby Apollo Project 100%
West Roxby Apollo Project 100% URANIUM For personal use only Project Status Apollo Unconformity Uranium Target Drill Test May-June 2010 Apollo Gravity Image
Slide 16: Olympic Dam Province
Olympic Dam Province For personal use only Apollo Target Apollo p Topography p g p y Apollo p magnetics g Apollo Gravity Anomaly 7—8mgal Low 20-30m topographic Low Deposit style : Rabbit Lake Uranium Mine Nth Saskatchewan Canada Discovered 1965 First Production 1975 2008 Production CAMENCO 3.6m poun
Slide 17: Olympic Dam Province
Olympic Dam Province For personal use only Apollo Target Unconformity Uranium Athabasca Style Pandura redbeds lithologies Unconformity Reduced crystalline basement intruded by A type granites. (Olympic Dam) Magnetic and Gravity Lows Surface Depression – Rabbit Lake
Slide 18: Uranium Model
For personal use only URANIUM MODEL
Slide 19: Uranium Model
For personal use only URANIUM MODEL
Slide 20: Pindari Project Nickel 100%
Pindari Project Nickel 100% For personal use only Project Status • Stockdale Drilling 1987 • 3kms Magnetic Anomaly • EM Survey • Aircore Geochemistry • Targets Defined • Drill test Q2 Q2-Q3 Q3 2010
Slide 21: Pindari Ni Project
Pindari Ni Project. For personal use only •Nickel Ni k l sulphides l hid identified by Stockdale •1Km 1Km X 300m Ni/Cr Anomaly •Peak values 0.37% Ni, 0 34% Cr 0.34% Magnetics. E.M. •Anomaly open west EM Conductivity Magnetic g •Closely associated with magnetic & EM •Anomalous REE Cr Geochemistry. Ni
Slide 22: Pipeline Watervale Gold
Pipeline Watervale GOLD For personal use only Nth Burra EL 4266
Slide 23: Pipeline Watervale Gold
Pipeline Watervale GOLD For personal use only ELA* 015/10 Riverton Watervale Diggings 1869 Alluvial gold discovered 1896 quartz t reefs f mined i d reported surface samples 3-23 g/t Au 20 metre shaft 14 g/t Au ELA 015/10 * Riverton is an Exploration Lease Application made in January 2010. If success
Slide 24: Pipeline – Termination Hill Magnesite
Pipeline – Termination Hill Magnesite ELA* For personal use only • High quality > 42% MgO • Low impurity magnesite • Large outcropping Deposits • Fast Acid Leach times • Adjacent to existing rail link Magnesite bands Termination Hill Region Historic “Resources” Area Measured Indicated Inferred MgO P
Slide 25: Jan-July 2010 Program
Jan-- July 2010 Program Jan For personal use only Jan Feb March April May June July Ketchowla RC Drill Met Test ced Jamieson Tank Auger Drill RC Drill Advanc Apollo U3O8 Stage 1 RC/DDH Drill Pindari Ni Aircore Drill Stage 1 RC/DDH Drill Wild Horse Plains Stage 1.Mapping & Rock Chip sampling North Co
Slide 26: Exploration Budget
Exploration Budget For personal use only 31st December D b 2009 – Cash C h $4$4.52m 52 2010 Exploration Budget $1.9m ADVANCED PROJECTS DRILL TEST by Q3 2010 Ketchowla Manganese Manganese Jamieson Tank Manganese (OMM JV) Urani m Uranium A ll Uranium Apollo U i Project P j t Nickel Pindari Nickel Proj
Slide 27: Outlook 2010
For personal use only OUTLOOK 2010 INVESTOR PRESENTATION MARCH 2010
Archer Exploration — Investor Presentation (March 2010) on 6ix