  1. Slide 1: Joe Pollard, Director, Long Term Marketing

    Joe Pollard Director, Long Term Marketing May 5, 2016

  2. Slide 2: Acquisition of Columbia Pipeline Group – Strategic Rationale

    Acquisition of Columbia Pipeline Group – Strategic Rationale • Premium natural gas pipeline and storage assets • Extensive position in the Marcellus and Utica shale regions • FERC regulated assets generate stable and predictable earnings and cash flow • US$7.3 billion portfolio of growth initiatives

  3. Slide 3: Columbia Pipeline Group Asset Overview

    Columbia Pipeline Group Asset Overview • Columbia Gas Transmission • 11,272 mile (18,141 km) FERC pipeline with average throughput of 3.9 Bcf/d • 286 Bcf of working gas storage capacity • Strong base business undergoing significant expansion to connect growing Marcellus/Utica supply • Columbia Gulf

  4. Slide 4: Combined Natural Gas Pipeline Footprint

    Combined Natural Gas Pipeline Footprint • One of North America’s largest regulated natural gas transmission businesses • 91,000 km (56,900 miles) of gas pipeline • 664 Bcf of storage capacity • Complements our existing regulated natural gas pipeline and storage assets • Long-term, fee-based contract

  5. Slide 5: Acquisition Key Takeaways

    Acquisition Key Takeaways • Acquisition creates one of North America’s largest regulated natural gas transmission businesses • Complements our existing assets • Adds to basin diversification and access to large markets • Provides another platform for continued organic growth • Agencies affirmed ‘A’

  6. Slide 6: Marketing Fundamentals and Supply Update

    Marketing Fundamentals and Supply Update May 5, 2016 Colin Strom Manager, Short Term Marketing & Optimization

  7. Slide 7: Disclaimer: Forward Looking Information

    Disclaimer : Forward Looking Information This presentation includes certain forward looking information to help current and potential investors understand management’s assessment of our future plans and financial outlook, and our future prospects overall. Statements that are forward-looking are base

  8. Slide 8: Marketing Fundamentals & Supply Update

    Marketing Fundamentals & Supply Update • GTN Overview • North American Supply & Demand • Supply Fundamentals • Market Fundamentals • Value Overview • Opportunities & Impacts to GTN Value 8

  9. Slide 9: GTN Overview

    GTN Overview ¢ TransCanada In business to deliver

  10. Slide 10: Operating Parameters

    Operating Parameters • Positioned to serve markets in California, Nevada, and the Pacific Northwest • Consists of 1,350 miles of pipeline • Capacity of 2.81 Bcfd at the U.S. border and 2.23 Bcfd at the California border • Long-term contracts extending out to 2023 • Volume throughput has been strong

  11. Slide 11: North American Supply & Demand

    North American Supply & Demand

  12. Slide 12: North American Supply

    North American Supply 2016 TransCanada Outlook 12

  13. Slide 13: North American Demand

    North American Demand 2016 TransCanada Outlook 140 120 LNG Exports Transport 100 Power Generation 80 Bcfd Industrial 60 Other 40 Residential 20 Commercial 0 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 13

  14. Slide 14: Supply Fundamentals

    Supply Fundamentals ¢ TransCanada In business to deliver w

  15. Slide 15: Marcellus & Utica Production Forecast

    Marcellus & Utica Production Forecast 60.0 50.0 40.0 Bcfd 30.0 41.7 43.1 43.4 20.0 38.5 39.6 40.6 36.0 19.1 33.1 15.9 29.0 23.4 10.0 11.7 8.3 5.3 3.0 0.0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ACTUALS FORECAST MARCELLUS/UTICA FORECAST FORECAST 1 FORECAST 2 FO

  16. Slide 16: San Juan & Permian Production Forecast

    San Juan & Permian Production Forecast SAN JUAN PRODUCTION & FORECAST 3.5 3.0 3.2 3.1 3.0 2.5 2.7 2.6 2.5 2.0 Bcfd 1.5 1.0 2.2 2.0 1.9 1.8 1.7 1.6 1.6 1.5 1.5 1.4 0.5 0.0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 SAN JUAN FORECAST FORECAST 1 FORECAST 2 FORECAST

  17. Slide 17: Rockies Production Forecast

    Rockies Production Forecast 12.0 10.0 10.3 10.1 10.0 9.4 9.3 9.4 8.0 Bcfd 6.0 8.6 8.2 4.0 8.0 7.8 7.8 7.7 7.7 7.8 7.8 7.9 2.0 0.0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ROCKIES FORECAST FORECAST 1 FORECAST 2 FORECAST 3 ACTUALS 17

  18. Slide 18: Western Canadian Production Outlook

    Western Canadian Production Outlook 20.0 18.0 16.0 14.0 14.3 13.6 13.7 13.4 13.5 13.5 12.0 Bcfd 10.0 8.0 16.0 16.4 15.0 15.5 14.0 14.2 14.7 13.6 13.6 13.8 6.0 4.0 2.0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ACTUALS FORECAST WCSB FORECAST FORECAST 1 FORECAST 2

  19. Slide 19: NGTL Supply Debottleneck

    NGTL Supply Debottleneck • Rapid changes in WCSB supply created the need to address the system’s export capability • Successful open season will increase the firm subscription for export capability at the ABC gate (Coleman, AB) by ~150 MMcfd in Q3 2016 Source: TransCanada Presentation; May 5, 2016 1

  20. Slide 20: Market Fundamentals

    Market Fundamentals ¢ TransCanada In business to deliver

  21. Slide 21: Demand Projections: Pacific Northwest & California

    MMcF/D MMcF/D - - 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 1,000 1,500 2,000 2,500 3,000 500 S 13 4,761 S 13 1,811 W 13/14 4,688 W 13/14 2,675 S 14 5,079 S 14 1,669 ACTUALS ACTUALS W 14/15 4,901 W 14/15 1,970 S 15 4,800 S 15 1,613 W 15/16 5,212 W 15/16 2,122 S 16 4,769 S 16 1,557 W 16/17 5,15

  22. Slide 22: California Storage

    California Storage PG&E HISTORICAL STORAGE BALANCE 250,000 200,000 150,000 MMcfd 100,000 50,000 199,617 189,944 194,317 199,460 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 5 YR - RANGE 2016 5 YR - AVERAGE 2015 SoCAL HISTORICAL STORAGE BALANCE 160,000 140,000 120,000 100,000 MMcfd 80,000 60,000

  23. Slide 23: Hydro Outlook

    Hydro Outlook Pacific Northwest & California • Stronger hydro conditions than 2015, but unseasonably warm temperatures are causing a quick runoff • Water supply forecasts continue to rapidly deteriorate with early runoffs depleting mountain snowpack • Early Q2 snowpack levels are falling to 25-50% o

  24. Slide 24: Washington Snow Water Equivalent

    Washington Snow Water Equivalent 24

  25. Slide 25: Oregon Snow Water Equivalent

    Oregon Snow Water Equivalent 25

  26. Slide 26: Peak Summer Weather Forecast

    Peak Summer Weather Forecast NOAA – June to August MDA Weather Services – June to August Source: NOAA and MDA Weather Services 26

  27. Slide 27: Redwood Path Maintenance

    Redwood Path Maintenance Redwood Path Maintenance Capacity Dates % of Max Maintenance Notes (MMcf/d) 20-Apr 2148 98% Delevan Station Maintenance 28-Apr 2091 96% Tionesta Station Maintenance 3-May 2073 96% Delevan Station Maintenance 4-May 2007 93% Gerber Station Maintenance 5-May 2088 97% Gerber Sta

  28. Slide 28: New Market Demand Projections

    New Market Demand Projections • Carty Lateral • New lateral to serve NW power generation • 175 MMcfd of lateral capacity and 75 MMcfd of GTN mainline capacity • 440 MW expected in-service for Q3 2016 • Jordan Cove & Pacific Connector • Just signed a 20yr agreement with Itochu Corp. (Japanese firm) •

  29. Slide 29: Mexican Natural Gas Demand

    Mexican Natural Gas Demand Gasoducto Rosarita North U.S. Southwest “pre-growth” export capacity 350 MMcfd Baja ~1.7 Bcfd being expanded to 5 Bcfd Costa Azul Olgilby El Paso 614 MMcfd Into NW Mexico El Paso 360 MMcfd Juarez, Samalayuca & Norte Crossing 900 MMcfd Waha to San Elizario 1.135 Bcfd CFE Pr

  30. Slide 30: Current Volumetric Flow

    Current Volumetric Flow Pacific NW Deliveries 1.400 1.200 1.000 0.800 MDthd KINGSGATE 0.600 0.930 3.000 0.804 0.775 0.400 0.600 0.200 2.500 - - - - - - - - - JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2.000 5-YEAR RANGE 2016 2015 MDthd 1.500 Malin Deliveries 1.997 1.990 1.946 1.942 1.000 2.500

  31. Slide 31: Value Overview

    Value Overview ¢ TransCanada In business to deliver

  32. Slide 32: Daily Transportation Values to Malin

    Daily Transportation Values to Malin 32

  33. Slide 33: Forward Pricing

    Forward Pricing AECO – Malin Value MALIN FORWARD VALUE $0.90 $0.80 $0.70 ($$$) PER DtH $0.60 $0.50 $0.40 $0.30 $0.20 $0.62 $0.67 $0.70 $0.78 $0.71 $0.63 $0.50 $0.50 $0.61 $0.60 $0.59 $0.58 $0.32 $0.34 $0.39 $0.50 $0.46 $0.45 $0.10 $- VALUE MAX RATE MALIN FORWARD VALUE $0.70 $0.60 $0.50 ($$$) PER DtH

  34. Slide 34: Forward Pricing to Malin

    Forward Pricing to Malin AECO (vs) Rockies $1.20 $1.14 $1.14 $1.14 $1.14 $1.14 $1.14 $1.14 $1.14 $1.00 $0.80 ($$$) PER DtH $0.60 $0.40 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.20 $0.66 $0.57 $0.40 $0.03 $0.48 $0.03 $0.32 $0.03 $0.37 $0.00 $0.21 $0.01 $0.34 $- $(0.01) $(0.01) $(0.01) $(0.20

  35. Slide 35: Dollars Above/Below Max Rate

    Dollars ($$$) Above/Below Max Rate $- $0.50 $1.00 $1.50 $2.00 $(2.00) $(1.50) $(1.00) $(0.50) $0.27 $0.10 $0.18 $0.02 $0.07 $(0.09) $0.09 $(0.04) $0.15 $(0.12) Forward Pricing $(0.12) $(0.23) $0.38 W 16/17 $0.15 Canadian Dispatch Economics $0.35 $0.08 $0.30 S 17 $0.01 $0.20 $0.11 $0.13 W 17/18 $0.02

  36. Slide 36: Opportunities & Factors Impacting GTN Value

    Opportunities & Factors Impacting GTN Value

  37. Slide 37: Opportunities & Impacts to GTN Value

    Opportunities & Impacts to GTN Value • Supply fundamentals • Alberta eastern gate exports to NBPL and TCPL Mainline • NGTL export enhancements for Q3 2016 and potential 2018/2019 • Northwest loads • Flow displacements around Marcellus/Utica basins • Competition for supplies in the southwest and Mexi

  38. Slide 38: GTN Annual Customer Meeting - NGTL Update

    GTN Annual Customer Meeting - NGTL Update May 5, 2016 Jawad Masud – Director of Commercial West Markets for NGTL/Foothills

  39. Slide 39: Forward Looking Information and Non-GAAP Measures

    Forward Looking Information and Non-GAAP Measures This presentation includes certain forward looking information to help current and potential investors understand management’s assessment of our future plans and financial outlook, and our future prospects overall. Statements that are forward-looking

  40. Slide 40: NGTL System

    NGTL System • 32,000+ km of pipe – combined assets of NGTL and ATCO Pipelines • Over 1100 receipt and 1000 delivery points on system • Transports approximately 75% of WCSB production • Over 1000 Tcf of WCSB resource • 400+ Bcf of WCSB gas storage • > 50 Bcf/d of NIT trading liquidity • System Annual

  41. Slide 41: WCSB Gas Supply

    WCSB Gas Supply Historical Forecast

  42. Slide 42: WCSB Wells Drilled and Remaining Resource Estimates

    WCSB Wells Drilled and Remaining Resource Estimates WCSB Remaining Resource Estimates 1018 Montney Deep Basin Year Drilled 172

  43. Slide 43: WCSB Supply/Demand & Export Flows

    WCSB Supply/Demand & Export Flows Bcf/d WCSB Supply History Forecast Other WC Demand No LNG World? WC Oil Sands Demand Delayed LNG BC Coast ? LNG Exports WCSB Exports

  44. Slide 44: NGTL System Receipt Flows

    NGTL System Receipt Flows ? ? ? 2014/15 2015/16 Forecast Excluding Storage

  45. Slide 45: NGTL System Intra Basin Flows

    NGTL System Intra Basin Flows • Steady increase in intra-basin demand Daily Delivery • Predictable seasonal variations Annual Average • Further stimulus for oil related demand growth Forecast

  46. Slide 46: East Gate – Historic and Current Flows

    East Gate – Historic and Current Flows Bcf/d Bcf/d 2015 2016 2015 2016

  47. Slide 47: EGAT – Firm Contracts and Capability

    EGAT – Firm Contracts and Capability

  48. Slide 48: WGAT - Flows

    Becf/d WGAT - Flows 3.0 ABC + AB MONT 2.5 2.0 5 15 1.0 0.5 0.0 T T T T T Nov-10 Nov-11 Nov-12 Nov-13 Nov-14 Nov-15 . . T Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ¢. TransCanada

  49. Slide 49: West Path – Firm Contracts and Capability

    West Path – Firm Contracts and Capability Capability Capability April 2016 (Bcf/d) Nov 2018 (Bcf/d) GTN 2.8 2.8 Foothills -BC 3.0 3.0 A/BC Border 2.3 2.8 Note: Values are estimated.

  50. Slide 50: Working Gas in Storage Connected to NGTL System

    Working Gas in Storage Connected to NGTL System Historic Maximum Inventory 69 Bcf Storage Locations If we continue to inject at the average rate of injection April 1-10 (856 mmcf/d), storage will reach the historic maximum before the end of June 2016.

  51. Slide 51: Monthly Outage Forecast - April

    Monthly Outage Forecast - April

  52. Slide 52: Monthly Outage Forecast - April

    Monthly Outage Forecast - April

  53. Slide 53: NGTL System Settlements

    NGTL System Settlements OM&A Sharing Mechanism • 2015 Settlement: 100% NGTL • 10.1% return on equity and 40% equity thickness • 3.17% composite depreciation rate + $5 MM • OM&A sharing mechanism with collars allocating risks/rewards 75/25 Sharing NGTL and Shippers • $220 million fixed OM&A threshold

  54. Slide 54: NGTL Revenue Requirement and System Tolls

    NGTL Revenue Requirement and System Tolls $mm +/- 2 ₵ * *2016 Interim Tolls

  55. Slide 55: NGTL System Growth Through 2018

    NGTL System Growth Through 2018 2015 Expansion Facilities 2016-2018 Expansion Facilities • ~$300 million capital additions • ~$5.3 billion capital additions • 28 km NPS 24 pipelines • Over 900 km NPS 20-48 pipelines • 3.5 MW compression • ~ 240 MW compression • 15 meter stations • Over 50 meter stat

  56. Slide 56: Pipeline Integrity Program: Progressing as Planned

    Pipeline Integrity Program: Progressing as Planned By end 2016: • ~ 9850 km assessed • 39% NGTL assessed (increase from 27% at the start of AAP) • $303 million in 2015 • Similar spend in 2016 ILI and Tether • Met all Commitments to date, on schedule for future commitments • Organizational realignmen

  57. Slide 57: 2015 and 2016 Pipeline Integrity Program Overview

    2015 and 2016 Pipeline Integrity Program Overview 2015 2016 17 Launcher/Receiver Pairs 16 Launcher/Receiver Pairs 66 Inline Inspections 65 Inline Inspections 500 Post ILI Digs/Repairs 400-600 Post ILI Digs/Repairs Launcher/Receiver/Mods Local or no impact Potential area/border impact Probable area/b

  58. Slide 58: THANK YOU !

    THANK YOU ! (@) TransCanada

  59. Slide 59: Operational Highlights

    Operational Highlights Paul Oliver USPL – Operations Control 59

  60. Slide 60: Recap of Operations

    Recap of Operations • GTN experienced its Peak Day on August 25th, 2015, with total physical deliveries of 2.2-MMDth. • There have been no unplanned outages resulting in nomination cuts on either GTN or Tuscarora since June 2010. 60

  61. Slide 61: GTN Average Day System Throughput

    GTN Average Day System Throughput 61

  62. Slide 62: Tuscarora Average Day System Throughput

    Tuscarora Average Day System Throughput 62

  63. Slide 63: North Baja Average Day System Throughput

    North Baja Average Day System Throughput 63

  64. Slide 64: GTN Power Loads

    —/ bo dale, Re MI R ie . _

  65. Slide 65: GTN Power Plant Connections

    GTN Power Plant Connections Carty Generating 6 5 (Proposed) 4 3 CS8 Carty Lateral (Proposed) Stanfield Coyote Springs Lateral CS9 Power Plants 1. Lancaster LLC 2. Rathdrum CT 3. Calpine HPP 4. Hermiston Generating 5. Coyote Springs I 6. Coyote Springs II 7. Klamath Cogen 8. Klamath Expansion Legend

  66. Slide 66: Tuscarora Power Load

    Tuscarora Power Load 66

  67. Slide 67: 2016 GTN Maintenance Schedule

    2016 GTN Maintenance Schedule Pipeline Integrity Digs A-Line EXT.02 MLV 8.4 September TBD 200 – MMcf/d (leaving 2,530-MMcf/d available) Pipeline Inline Inspection (EMAT) A-Line CS03 to CS06 July 11-15 800-MMcf/d (leaving 1,930 available) Compressor Station 14 MCC Upgrade MCC Replacement October (TBD

  68. Slide 68: 2016 Maintenance Schedule Tuscarora & North Baja

    2016 Maintenance Schedule Tuscarora & North Baja • No Maintenance Scheduled that will impact capacity 68

  69. Slide 69: Questions

    Questions Var ¢ TransCanada 69

  70. Slide 70: Guest Speaker Mr Dennis Gartman

    Guest Speaker Mr Dennis Gartman Editor/Publisher The Gartman Letter 70

  71. Slide 71: GTN Shipper Meeting Business Development

    GTN Shipper Meeting Business Development May 5, 2016

  72. Slide 72: Trail West Pipeline

    Trail West Pipeline Sumas • 106 mile, 30” pipe Victoria Northwest Pipeline • Supply receipt from GTN Sandpoint WAS HINGTON mainline near Madras Spokane Seattle • Delivery points into NW ID AHO Natural and Northwest Yakima Pipeline at Molalla Lewiston • Industrial developments Pasco Walla Walla Portl

  73. Slide 73: The Integrated Project Concept

    The Integrated Project Concept Sumas Kingsgate Transportation Segments 1 NWP Gorge Capacity 1 Stanfield 4 2 2 GTN Capacity Molalla 3 Trail Madras 3 Trail West Pipeline Capacity West 4 NWP Expansion Capacity: I-5 Corridor Malin Opal Ruby REX 73