  1. Slide 1: Interim results for the 6 months ended 31 December 2010

    Alternative energy products for global markets Interim results for the 6 months ended 31 December 2010 30th March 2011

  2. Slide 2: Disclaimer

    Disclaimer This presentation is directed at institutional investors in Ceres Power Holdings plc (the “Company”). The presentation does not constitute a recommendation regarding the shares or other securities of the Company or any of its subsidiaries nor a representation that any dealing in those sha

  3. Slide 3: Introduction

    Introduction Brian Count Chairman, Ceres Power © Ceres Power 2011 3

  4. Slide 4: Business Update

    Business Update Peter Bance Chief Executive Officer, Ceres Power © Ceres Power 2011 4

  5. Slide 5: Business Overview

    Business Overview • Key achievements: - CHP product demonstrated - CE mark safety approval received - CHP field trial products installed and operated in occupied family homes • CHP market opportunity: - Regulatory environment increasingly valuing low carbon technologies - Working with British Gas to

  6. Slide 6: Operational Update

    Operational Update • Start of field trials in 5 family homes following receipt of CE mark - Field trial products deliver central heating, hot water and power in homes - System reliability and product durability issues identified and being addressed ahead of the next wave of field trials and initial

  7. Slide 7: CHP Product Demonstration

    CHP Product Demonstration Actual data captured from live CHP Product demonstration held at Ceres Power’s Horsham manufacturing facility on 29-9-2010 Net AC CHP Power Output (Watts) 1000 Kettle Grid Export 800 • Natural gas fed • Grid connected 600 Lights x2 400 TV 200 0 0 5 10 15 20 25 30 Time (minu

  8. Slide 8: CE Marking – Safety Approval

    CE Marking – Safety Approval • CE safety approval received from Kiwa in Dec 2010 with certificate itself formally issued 6th Jan 2011 • Batch approval for initial wave of field trial CHP products • Key regulatory enabler for deployment into occupied consumer’s homes • Ceres Power conducted own compr

  9. Slide 9: CHP Field Trials in Family Homes

    CHP Field Trials in Family Homes 5 CHP units installed in a range of family homes in South East England • Fully integrated, wall-mounted, CE marked CHP products • CHP products replaced homes’ existing boilers in the same location • CHP products operating automatically, responding real- time to the h

  10. Slide 10: Wave 1 Field Trial Sites & Installations

    Wave 1 Field Trial Sites & Installations © Ceres Power 2011 10

  11. Slide 11: Collaboration with British Gas

    Collaboration with British Gas • Field trials support - British Gas service engineer seconded to work with Ceres Power on field trial sites - CHP product design refinement using input from installation & service engineers - CHP installer demo units at each of British Gas’ engineering training academ

  12. Slide 12: Technology Update

    Technology Update Phil Whalen Technology Director, Ceres Power © Ceres Power 2011 12

  13. Slide 13: Technology Performance Review

    Technology Performance Review • Improved FCM heat-to-power ratio achieved - FCM heat-to-power ratio of 1.1:1 (improved from 1.27:1) - Reduced electronic leakage at cell level by optimising fuel cell manufacturing process conditions - Better FCM thermal management and systems integration, expected to

  14. Slide 14: Field Trial Learnings to Date

    Field Trial Learnings to Date • CHP products to continue operating in the field with FCMs to be be removed and analysed at different stages throughout the trial - Good CHP product availability demonstrated in early units, for example, one unit demonstrated in its first month: • ~94% FCM up-time: dow

  15. Slide 15: Key Areas of Focus in Beta Phase

    Key Areas of Focus in Beta Phase Challenge Risk reduction actions System Reliability  Improved water management efficiency - Unplanned shutdowns  Optimised CHP boiler control  Mapping of stable product operating space Product Durability  Cell interconnect design and coatings - Performance stabil

  16. Slide 16: Financial Results

    Financial Results Rex Vevers Finance Director, Ceres Power © Ceres Power 2011 16

  17. Slide 17: Financial Highlights - Summary

    Financial Highlights - Summary £m H1 ’11 H1 ’10 ∆ ’10 Revenue from customers 0.4 0.3 0.1 Other operating income 0.1 0.1 - Operating costs (7.9) (6.4) (1.5) Loss for the financial year (5.9) (5.9) - Capex (net of grants) 0.9 1.0 (0.1) Equity-free cash outflow1 (6.7) (7.0) 0.3 Net cash & financial ass

  18. Slide 18: Summary

    Summary • CHP field trials underway in a range of occupied family homes following successful CE certification • Working together with our key channel partner British Gas on the installation, service and maintenance of CHP units in the field • Regulatory environment increasingly valuing low carbon te

  19. Slide 19: Registered Office and Technology Centre

    Registered Office and Technology Centre Headquarters Ceres Power Limited Ceres Power Limited Unit 18, Denvale Trade Park Viking House Haslett Avenue East Foundry Lane Crawley Horsham RH10 1SS RH13 5PX United Kingdom United Kingdom Phone: +44 (0) 1293 400 404 Phone: +44 (0) 1403 273 463 Fax: +44 (0)