Boral Ltd.

Boral — Corporate Update (November 2017)

21 slides from Boral's corporate update, November 2017

  1. Slide 1: Maldon Works Community Liaison Committee meeting

    MALDON WORKS Community Liaison Committee meeting November 2017

  2. Slide 2: Maldon is strategically located

    Maldon is strategically located Close to the motorway into Sydney, on a rail line with a siding and close to a port Boral Terminal / Quarry Enfield & Clyde St Peters Rail & road connections Maldon Berrima Port Kembla Dunmore Peppertree Marulan 50 km 2

  3. Slide 3: Maldon is an integral operation in Boral's network

    Maldon is an integral operation in Boral’s network Maldon produces bulk cement products and is Boral’s only cement and dry mix packaging operation Packaged products 3

  4. Slide 4: Safety performance

    Safety performance Our goal is to achieve ZERO HARM TODAY for all employees and contractors Maldon’s Employee & Contractor Injury Count Lost time injuries (LTI) and medical treatment injuries (MTI) 10 LTI MTI 9 8 7 6 5 10 3 4 5 7 3 5 5 2 4 3 1 1 1 1 1 0 0 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17

  5. Slide 5: Safety performance

    Safety performance We are increasingly monitoring leading indicators of safety, including hazard reporting and corrective action management Maldon’s Hazard Report Count • A 145% increase in hazards reported in 4 years? Second chart with lead indicators • An 82% increase in safety conversations • A 6

  6. Slide 6: Safety: learning from recent incidents

    Safety: learning from recent incidents Through toolbox discussions and induction processes we use recent incidents to raise awareness and improve performance CHANGE MANAGEMENT ISOLATION During completion of a task, Develop our people and hazards may change. systems to verify isolation We need robust

  7. Slide 7: Boral Cement – Other Sites

    BORAL CEMENT – OTHER SITES - Berrima: Starting construction of the new Solid Waste Derived Fuels (SWDF) plant and equipment. - Marulan: Planning applications being developed to secure approval to continue the mining of limestone for the next 30 years. - Geelong: Planning approval is pending for a ne

  8. Slide 8: Use of Waste-Derived Fuels at Berrima – Approved

    Build something great™ Use of Waste-Derived Fuels at Berrima – APPROVED! Boral Berrima Cement Community Meeting 10 November 2016  After almost three years of work, during October approval was received by the Cement Works for use of fuels derived from waste as part of production.  Current approvals

  9. Slide 9: Waste-Derived Fuels at Berrima

    Build something great™ Waste-Derived Fuels at Berrima Boral Berrima Cement Community Meeting 10 November 2016  There are now three Waste Derived Fuels which can be used at Berrima.  The first, tyre ‘chips’, has been approved for use for many years. We do not, however, propose to use tyre chips for

  10. Slide 10: Marulan Quarry

    BORAL Marulan Quarry

  11. Slide 11: Boral Cement Geelong - Victoria

    Boral Cement Geelong -Victoria 11

  12. Slide 12: Water Usage

    Water Usage River Water Usage in Kilolitres 99098 79104 54,541 32,854 35775 27834 4990 0 Jul09-Jun 10 Jul 10-Jun 11° Jul14-Jun 12 Jul12-Jun13 Jul13-Jun14 Jul14-Jun-15 Jul 15-Jun-16 Jul 16-Jun-17 12

  13. Slide 13: Annual EPA Dust Emissions

    Annual EPA Dust Emissions Average Licence Date Test 1 Test 2 EPA Location Description Condition Parameter Units Detected limit Tested values 1 No 2 Cement Mill Baghouse mg/m3 100 26-Jul-17 36 29 32 Normal 2 No 3 Cement Mill Precipitator mg/m3 100 26-Jul-17 29 26 28 Total solid particles Aggregate mg

  14. Slide 14: Road intersection

    BORAL Road intersection

  15. Slide 15: Upgrade to Blending Plant

    Upgrade to Blending Plant 15

  16. Slide 16: Installation of new bulk bag machine

    Installation of new bulk bag machine 16

  17. Slide 17: Existing CM2 Circuit

    ® Existing CM2 Circuit Existing Cement Mill 2 Installation: Two 1st generation Hyde Separators installed in parallel. Over sized product goes back to the mill inlet. Finished product goes to the process bag filters for collection, before passing to the cement coolers.

  18. Slide 18: Self Supply to South Australia

    Self Supply to South Australia • Isotainer loaded at cement plant, taken to Sydney and railed to South Australia

  19. Slide 19: Kiln Stack demolition

    Kiln Stack demolition 19

  20. Slide 20: IlluminARTE 2017 (May)

    IlluminARTE 2017 (May) 20

  21. Slide 21: Wollondilly Anglican Country Fair 2017 (Sep)

    Wollondilly Anglican Country Fair 2017 (Sep). 21