Slide 1: Côté Gold – Analyst Site Visit
Côté Gold – Analyst Site Visit September 15, 2018 l TSX: IMG l NYSE: IAG l
Slide 2: Cautionary Statement
Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than s
Slide 3: Côté Gold Development Project
Côté Gold Development Project 2021 – 2038 2020 Production 2019 Construction Potential to 2018 Investment extend LOM 2017 Feasibility study decision Begin pre-strip through exploration Construction Pre-Feasibility Study confirms low operating costs and ADVANCING ONE OF attractive returns CANADA’S LAR
Slide 4: Côté Gold – Ontario (64.75%)
Côté Gold Ontario (64.75%) Key accomplishments since acquisition in 2012 Attributable 64.75% Tonnes Grade Contained Ounces Completed Prefeasibility Study and initiated Feasibility Study (000) (g/t) (000 Au) Converted 5.9 Moz (100%) from resources to reserves Probable Reserves1 126,961 0.9 3,837 Po
Slide 5: Grade and Production
Grade and Production Au payable (koz) 500 450 Au payable (koz) 400 Au production (koz) 350 300 250 200 150 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Year Au Mill Feed grade (g/t) 1.4 Au Mill Feed grade (g/t) 1.2 Au Mill Feed Grade (g/t) 1.0 0.8 0.6 0.4 0.2 0.0 1 2 3 4 5 6 7 8 9 10 11 12 13
Slide 6: Feasibility Study
Feasibility Study Key Changes from PFS Mill throughput increase of about 10%, 36 ktpd Automated truck haulage & production drilling as the Base Case Camp location modified Zero based design and cost estimates Various savings or capital deferment initiatives underway Study Engineer Wood G
Slide 7: Feasibility Drill Program (Completed March 2018)
Feasibility Drill Program (Completed March 2018) Objectives Infill drilling- resource/reserve upgrade Grade distribution in starter-pit area Condemnation drilling for planned infrastructure Provide Geological information – Updated Geology Model Supply additional geochemical analyses for De
Slide 8: Geology / Alteration Model
Geology / Alteration Model 713 core holes totalling over 300,000 m assay database contains over 295,000 samples 8
Slide 9: Exploration
Exploration IAMGOLD
Slide 10: Technology Strategy
Technology Strategy Objectives Apply proven technologies to reduce risk to personnel and enhance project economics Develop core competencies around technology deployment and operations, sustain through continuous improvement Leverage advanced skills and competencies to build valuable capacity
Slide 11: Plant Power Infrastructure
Plant Increased plant capacity following optimization to 36ktpd Decreased footprint and volume by approximately 25% from PFS Optimized plant configuration and applied zero based design Power Supplied from HONI T2R line Shining Tree – 44km connection – aligned with HONI Sustaining Projects
Slide 12: Côté Gold Development Timeline - Permitting
Côté Gold Development Timeline - Permitting Yr 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Yr Qtr Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Qtr Draft EA EA to Ont. Prov. Process MoE EA Agreed Decision with Ont. Ammen
Slide 13: Côté Gold Development Timeline - Technical
Côté Gold Development Timeline - Technical Yr 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Yr Qtr Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Qtr 3rd IMG Last 1st IMG Resource Trelawney Resource Update Feasibility Study
Slide 14: Investor Relations contacts
Ken Chernin Laura Young Martin Dumont VP, Investor Relations Director, Investor Relations Senior Analyst, Investor Relations T: 416-360-4743 T: 416-933-4952 T: 416-933-5783 l TSX: IMG l NYSE: IAG l