  1. Slide 1: Regional Resource Stewardship Council

    Slide 1: Regional Resource Stewardship Council

    Regional Resource Stewardship Council November 14 - 15, 2017 Guntersville, Alabama

  2. Slide 2: Welcome

    Slide 2: Welcome

  3. Slide 3: Safety First

    Slide 3: Safety First

    Safety First Building Emergency Plan Regional Resource Stewardship Council | 3

  4. Slide 4: Introductions

    Slide 4: Introductions

    Introductions • Name • Organization • Favorite Recreational Activity Regional Resource Stewardship Council | 4

  5. Slide 5: Today's Meeting

    Slide 5: Today's Meeting

    MA Today's Meeting

  6. Slide 6: Agenda – Nov 14, 2017

    Slide 6: Agenda – Nov 14, 2017

    Agenda – Nov 14, 2017 8:30 TVA Welcome Joe Hoagland, VP, Enterprise Relations and Innovation and Designated Federal Officer RRSC Welcome Avis Kennedy, Council Chair Introductions and Agenda Review Liz Upchurch, Facilitator 8:50 FACA Briefing Kendra Mansur, Office of the General Counsel 9:00 DFO Brie

  7. Slide 7: Agenda – Nov 15, 2017

    Slide 7: Agenda – Nov 15, 2017

    Agenda – Nov 15, 2017 8:30 Welcome and Recap Liz Upchurch, Facilitator 8:45 Preliminary Water Use Report Amanda Bowen 9:15 Prepare for Public Comment Period 9:30 Public Comment Period Upchurch, Facilitator 10:30 Council Discussion / Form Upchurch, Facilitator and Council Advice 12:00 Wrap Up and Adj

  8. Slide 8: RRSC Meeting Facilitation

    Slide 8: RRSC Meeting Facilitation

    RRSC Meeting Facilitation  DFO (or his designee) will facilitate and ensure good order during all open discussions  Only one speaker or attendee is permitted to comment at a time  To be recognized by the Chair (or meeting facilitator) in order to provide comment, please turn your name card on its

  9. Slide 9: The Federal Advisory Committee Act and the RRSC

    Slide 9: The Federal Advisory Committee Act and the RRSC

    The Federal Advisory Committee Act and The Regional Resource Stewardship Council Kendra Mansur, Office of the General Counsel FACA Briefing—Ninth Term Third Meeting

  10. Slide 10: RRSC Meeting Protocols

    Slide 10: RRSC Meeting Protocols

    RRSC Meeting Protocols Agenda - Joe Hoagland, Vice President, Enterprise Relations and Innovation, is the Designated Federal Officer (DFO) - Agenda prepared and approved by the DFO in consultation with Council Chair, Avis Kennedy - Agenda distributed to Council and an outline is published in the Fed

  11. Slide 11: Thank you for your participation and advice

    Slide 11: Thank you for your participation and advice

    Thank you for your participation and advice.

  12. Slide 12: DFO Briefing

    Slide 12: DFO Briefing

    DFO Briefing Joe Hoagland, Vice President, Enterprise Relations and Innovation Designated Federal Officer

  13. Slide 13: June 2017 Meeting Recap

    Slide 13: June 2017 Meeting Recap

    June 2017 Meeting Recap • Meeting held June 6-7, 2017, in Knoxville, TN • Welcomed new members to the RRSC • Informational Presentations on TVA’s Land and River Management including Dam Safety, Natural Resource Management, and TVA’s Comprehensive Land Plan. • Primary meeting topic was on the ecotour

  14. Slide 14: Today's Meeting Goals

    Slide 14: Today's Meeting Goals

    Today’s Meeting Goals • Welcome new Members to the 9th Term of the RRSC and provide a brief orientation • Provide an update to the RRSC on TVA Natural Resource Stewardship and River Operations. • Provide an overview of the preliminary 2015 Water Use Report , changes to this version, and how TVA uses

  15. Slide 15: River Management Update

    Slide 15: River Management Update

    River Management Update James H. Everett, PE

  16. Slide 16: River Management Focus Areas

    Slide 16: River Management Focus Areas

    River Management Focus Areas River Management is responsible for scheduling the day-to-day, integrated operation of the Tennessee River system and balancing the competing demands on the system and the overall value to the public. Our integrated operations provide multiple benefits to the people of t

  17. Slide 17: Tennessee River System and Watershed

    Slide 17: Tennessee River System and Watershed

    HLeEINOTS Mississipel Fiver ARKANSAS lame Wratten W3ACE) Tombigbee Weterway | ALABAMA KENTUCKY CAROLINA 7 Y SOUTH CAROLINA Tennessee River System and Watershed ms Dam @ Metropolitan Area

  18. Slide 18: Flood Control & Navigation

    Slide 18: Flood Control & Navigation

    Flood Control & Navigation • Store water during flood to reduce crest • Issue flood forecasts for regulated system • Release water at non-flood rate after crest • Annual average flood damages averted • Cost-effective transportation are $260 million ($6.8 billion to date) • Raw Materials, Coal, Grain

  19. Slide 19: Hydropower

    Slide 19: Hydropower

    Hydropower • 3,538 MW Conv. generating capacity (109 Units) • 1,653 MW Pump-storage capacity (4 units) • Peaking power demand • Rapid Dispatch and Flexibility • ~ 10% of TVA’s energy portfolio • Low O&M Costs • Used to displace more expensive fuels • Water temperature support at thermal generating p

  20. Slide 20: Water Supply and Quality

    Slide 20: Water Supply and Quality

    Water Supply and Quality • Over 700 Surface Water Intakes • Process water for industry, thermal- electric cooling, municipal, irrigation • Drinking water for nearly 5 million people • Temperature and Dissolved • Provide minimum depths for intakes Oxygen monitoring • Manage inter-basin transfers • Ad

  21. Slide 21: Recreation

    Slide 21: Recreation

    Recreation • 230 Commercial Marinas • 260 Campgrounds • Drawdown restricted June 1 – Labor to provide higher summer lake levels • Numerous tailwater releases to support trout fishing, whitewater rafting and drift-boating • Stakeholder Involvement • Special flows and elevations to support community e

  22. Slide 22: 2017 Rainfall/Runoff

    Slide 22: 2017 Rainfall/Runoff

    2017 Rainfall/Runoff • 118% or normal rainfall and 95% of normal runoff | 22

  23. Slide 23: 2017 Hurricane Season

    Slide 23: 2017 Hurricane Season

    2017 Hurricane Season Record Breaking Season • 10 consecutive storms reached hurricane status (hasn’t happened since 1893) • 3 Different Category 4 hurricanes made U.S. landfall (first time in history) • September 2017 was most active month for Atlantic hurricanes on record (about 3.5 times the norm

  24. Slide 24: 2017 River Management Highlights

    Slide 24: 2017 River Management Highlights

    2017 River Management Highlights • Averted over $2.5 million in flood damages in April 2017 through reservoir system operations • Managed operations resulting from challenging weather conditions, including extreme drought, heavy spring rains, and remnants from 2 major hurricanes • Maintained over 3,

  25. Slide 25: Other Outreach

    Slide 25: Other Outreach

    Other Outreach • Tennessee Valley Water Partnership • Direct stakeholder outreach to Trout Unlimited during long term hydro unit outages • Dozens of educational tours of the River Forecast Center • Participation in community outreach programs, STEM, Robotics, Bike/Boat/Bark/Brew event, etc • Coordin

  26. Slide 26: TVA Dam Safety Program

    Slide 26: TVA Dam Safety Program

    TVA Dam Safety Program Protect lives and property by ensuring that TVA-owned dams are designed, constructed, operated, and maintained as safely and as reliably as is practicable. • 121 TVA dams and impoundments (87 river dams) • Avg. age of river dams is 67 years • Established multi-year Dam Safety

  27. Slide 27: Boone Dam Seepage Rehabilitation Project

    Slide 27: Boone Dam Seepage Rehabilitation Project

    Boone Dam Seepage Rehabilitation Project • Seepage identified in October 2014 • Degraded foundation threatens safety of dam • Interim measures taken to reduce risks • Safety of workers and community remain overriding priority • Cost estimate – up to $450 million • Schedule commitment – 5 to 7 years

  28. Slide 28: Additional Dam Safety Challenges

    Slide 28: Additional Dam Safety Challenges

    Additional Dam Safety Challenges | 28

  29. Slide 29: Questions?

    Slide 29: Questions?

    Questions? | 29

  30. Slide 30: Break

    Slide 30: Break

  31. Slide 31: TVA Natural Resources Update

    Slide 31: TVA Natural Resources Update

    TVA Natural Resources Update Bucky Edmondson, Director Natural Resources

  32. Slide 32: Agenda

    Slide 32: Agenda

    Agenda • FY17 Natural Resources highlights • Floating cabins update • FY18 efforts TVA Natural Resources Update | 32

  33. Slide 33: TVA exists to make our region the best place to live, work and play

    Slide 33: TVA exists to make our region the best place to live, work and play

    TVA exists to make our region the best place in the country to live, work and play Energy Manage the river and the lands along it for multiple benefits Environment Economic Protect and enhance Development cultural and natural resources Invest in communities to create and sustain the valley as a dest

  34. Slide 34: TVA Natural Resources Focus Areas

    Slide 34: TVA Natural Resources Focus Areas

    TVA Natural Resources Focus Areas Land, Wildlife, Public Commercial Water Public Land & Habitat Outreach & & Public Resources Protection Management Information Recreation Stewardship Section 26a Nuisance & Cultural Reservoir Permitting & Invasive Resources Lands Ecotourism Land Use Species Stewardsh

  35. Slide 35: Land, Wildlife and Habitat Management

    Slide 35: Land, Wildlife and Habitat Management

    Land, Wildlife and Habitat Management Collaborate to enhance wildlife habitat and resources conditions of public lands and waters 293,000 acres of reservoir lands to manage − Managed thousands of acres of forests and natural grasslands for wildlife habitat including non-game and games species − Enha

  36. Slide 36: Public Outreach and Information

    Slide 36: Public Outreach and Information

    Public Outreach and Information Collaborate to increase awareness and appreciation of resources, and create opportunities for community involvement in resource stewardship Support partnerships throughout the Power Service Area and the watershed – Provided environmental education programs to more tha

  37. Slide 37: Commercial and Public Recreation

    Slide 37: Commercial and Public Recreation

    Commercial and Public Recreation Collaborate to enhance recreational opportunities and accessibility on public lands Manage 6 TVA campgrounds, over 80 public recreation areas, 80 stream access sites and approximately 160 miles of trails across the Valley − Enhanced TVA Dam Reservations and reservoir

  38. Slide 38: Water Resources Stewardship

    Slide 38: Water Resources Stewardship

    Water Resources Stewardship Collaborate to protect and improve aquatic habitat in the Tennessee River watershed Tennessee River watershed ~ 41,000 square miles, high in aquatic biodiversity − Implemented Shade Your Stream in western North Carolina (Little TN River watershed) with over 900 participan

  39. Slide 39: Cultural Resources Stewardship

    Slide 39: Cultural Resources Stewardship

    Cultural Resources Stewardship Collaborate to protect cultural resources and increase awareness of protection needs Over 11,500 identified cultural resource sites across the Valley − Collaborated with representatives from federally recognized tribes to conduct limited excavations at Hiwassee Island

  40. Slide 40: Eco-Tourism

    Slide 40: Eco-Tourism

    Eco-Tourism Collaborate to promote and enhance recreational opportunities to support tourism and local economies – Supported regional planning efforts and tourism studies – Partnered with communities to enhance recreation and tourism opportunities including the Ocoee whitewater agreement – Expanded

  41. Slide 41: Whitewater Recreation on the Ocoee River

    Slide 41: Whitewater Recreation on the Ocoee River

    Whitewater Recreation on the Ocoee River − Partnership between the Ocoee River Outfitter Association, State of Tennessee, U.S. Forest Service and the Tennessee Valley Authority − TVA conducting an Environmental Assessment − State of TN created Recreation Trust Fund in 2017 and allotted $11.8M for 15

  42. Slide 42: Section 26a Permitting & Land Use Agreements

    Slide 42: Section 26a Permitting & Land Use Agreements

    Section 26a Permitting & Land Use Agreements Facilitate and support reservoir community development and partnerships through Section 26a permitting and land use agreements − Supported public and commercial recreation through over 1,400 permits and land use agreements − Enhanced municipal recreationa

  43. Slide 43: Floating Cabins – Next Steps

    Slide 43: Floating Cabins – Next Steps

    Floating Cabins – Next Steps On December 16, 2016, the Water Infrastructure Improvements for the Nation Act 2016 (WIN) was enacted, which amends Section 9 of the TVA Act of 1933. The Board is authorized to allow the use of floating cabins indefinitely if maintained by the owner to reasonable health,

  44. Slide 44: Nuisance & Invasive Species Management

    Slide 44: Nuisance & Invasive Species Management

    Nuisance & Invasive Species Management Identify and manage nuisance plants in TVA reservoirs and on TVA lands, manage nuisance animal species on TVA lands 650,000 acres of reservoir surface area and 293,000 acres of TVA public lands − Treated 1,216 acres of reservoir surface aquatic plants in develo

  45. Slide 45: Power of Partnerships

    Slide 45: Power of Partnerships

    Power of Partnerships External Partnership Project Input ~ $5.3M $9.5M Valleywide Positive Impacts NR’s Partnership Project Input $4.2M NATURAL RESOURCES FY18 | 45

  46. Slide 46: Natural Resources Stewardship Projects FY15 – FY17

    Slide 46: Natural Resources Stewardship Projects FY15 – FY17

    Natural Resources Stewardship Projects FY15 – FY17 NATURAL RESOURCES FY18 | 46

  47. Slide 47: Natural Resources Stewardship Projects FY18 – FY20

    Slide 47: Natural Resources Stewardship Projects FY18 – FY20

    Natural Resources Stewardship Projects FY18 – FY 20 NATURAL RESOURCES FY18 | 47

  48. Slide 48: FY18 Stewardship Efforts

    Slide 48: FY18 Stewardship Efforts

    FY18 Stewardship Efforts − NRP update − Public Land Policy − Lands Planning for Tellico and parts of Watts Bar − Partnership projects in recreation and wildlife habitat − Enhancements to Dam Reservation facilities − Increase efforts to build partnerships and expand stewardship work across Valley TVA

  49. Slide 49: Break

    Slide 49: Break

  50. Slide 50: TVA Natural Resource Plan

    Slide 50: TVA Natural Resource Plan

    TVA Natural Resource Plan Russell Smith, Natural Resources

  51. Slide 51: TVA Natural Resource Plan

    Slide 51: TVA Natural Resource Plan

    TVA Natural Resource Plan TVA Mission NR Stewardship Strategy Natural Resource Plan & 3-5 Year Action Plans NR Projects 51

  52. Slide 52: TVA's Mission of Service

    Slide 52: TVA's Mission of Service

    TVA’s Mission of Service TVA exists to make our region the best place in the country to live, work and play. 52

  53. Slide 53: Natural Resources – Stewardship Strategy

    Slide 53: Natural Resources – Stewardship Strategy

    Natural Resources – Stewardship Strategy To fulfill TVA’s mission, NR serves the people of the TVA region by remaining agile, balancing competing demands, and being a catalyst for collaboration in order to: • Create and sustain destinations for recreation and opportunities for learning and research

  54. Slide 54: NR Focus Areas

    Slide 54: NR Focus Areas

    NR Focus Areas Land, Wildlife, Public Commercial Water Public Land & Habitat Outreach & & Public Resources Protection Management Information Recreation Stewardship Section 26a Nuisance & Cultural Reservoir Permitting & Invasive Resources Lands Ecotourism Land Use Species Stewardship Planning Agreeme

  55. Slide 55: Natural Resource Plan 2018 Update

    Slide 55: Natural Resource Plan 2018 Update

    Natural Resource Plan 2018 Update 55

  56. Slide 56: Natural Resource Plan

    Slide 56: Natural Resource Plan

    Natural Resource Plan T E N N E S S E E VA L L E Y A U T H O R I T Y Natural Resource Plan Managing the River comes with the responsibility, along with the TVA mandated mission on Stewardship, to do a first class job of managing the water, shoreline, and natural resources. – RRSC Guiding Principles,

  57. Slide 57: Natural Resource Plan

    Slide 57: Natural Resource Plan

    Natural Resource Plan Published in 2011 as a 20-year guidance document 6 Resource Areas Biological, Cultural, Water, Recreation, Lands Planning and Public Engagement Programs Goals or Activities 57

  58. Slide 58: Natural Resource Plan

    Slide 58: Natural Resource Plan

    Natural Resource Plan TVA considered 4 levels of implementation in the Environmental Impact Statement • No Action • Custodial • Blended (selected level) • Flagship 58

  59. Slide 59: Natural Resource Plan – Update

    Slide 59: Natural Resource Plan – Update

    Natural Resource Plan – Update Goals: • Use lessons-learned to create updates programs and activities • Update text to align with TVA Mission and NR Strategy • Enhance strategic guidance and alignment of NR work • Be better equipped to answer your question of 'where do I spend the last dollar’ 59

  60. Slide 60: Natural Resource Plan – Structure

    Slide 60: Natural Resource Plan – Structure

    Natural Resource Plan – Structure 2011 NRP Format 2018 NRP Format of Success Measures of Success 6 Resource Areas 10 Focus Areas Measures 3-5 yr. Action Plans Programs Programs Goals & Activities Activities Projects Projects 60

  61. Slide 61: NR Focus Areas in the NRP

    Slide 61: NR Focus Areas in the NRP

    NR Focus Areas in the NRP Land, Wildlife, Public Commercial Water Public Land & Habitat Outreach & & Public Resources Protection Management Information Recreation Stewardship Section 26a Nuisance & Cultural Reservoir Permitting & Invasive Resources Lands Ecotourism Land Use Species Stewardship Plann

  62. Slide 62: Schedule

    Slide 62: Schedule

    Schedule Natural Resource Plan Update Complete an annual review Capture lessons learned and knowledge gained since 2011 FY17 Evaluate stewardship needs and wants Assess programs, activities and measures of success Capture NR efforts omitted from 2011 NRP 62

  63. Slide 63: Schedule

    Slide 63: Schedule

    Schedule Natural Resource Plan Update NEPA – Environmental Assessment FY18 Engage Stakeholders, including the RRSC and the Public Prepare NRP Update for public and release to Public 63

  64. Slide 64: Break

    Slide 64: Break

  65. Slide 65: Introduce Advice Topic and Questions

    Slide 65: Introduce Advice Topic and Questions

    Introduce Advice Topic and Questions

  66. Slide 66: Advice Questions

    Slide 66: Advice Questions

    Advice Questions 1. If TVA pursues the sale of public land to resolve legacy house encroachments with flexibility, how can TVA discourage future house encroachments? 2. What role should TVA play in protecting the public land it has in its custody and control? In what ways should the public be inform

  67. Slide 67: Public Land Protection

    Slide 67: Public Land Protection

    Public Land Protection Milli Warren

  68. Slide 68: Purpose

    Slide 68: Purpose

    Purpose • Discuss differences between private land and TVA public land • Summarize TVA’s implementation of prior RRSC advice • Receive advice on TVA’s public land protection efforts PUBLIC LAND PROTECTION | 68

  69. Slide 69: TVA Land Acquisition and Utilization

    Slide 69: TVA Land Acquisition and Utilization

    TVA Land Acquisition and Utilization ~1.3 million acres acquired since 1933 Focus for today PUBLIC LAND PROTECTION | 69

  70. Slide 70: Reservoir Land Planning Zones

    Slide 70: Reservoir Land Planning Zones

    Reservoir Land Planning Zones Project Operations Residential Shoreline Access ~25,500 acres Industrial ~15,000 acres ~5,000 acres To help protect y our priv acy , PowerPoint has block ed automatic download of this picture. Developed Recreation ~24,600 acres Natural Resource Conservation ~175,800 acr

  71. Slide 71: Private Land versus TVA Public Land

    Slide 71: Private Land versus TVA Public Land

    Private Land versus TVA Public Land • Resolution of disputes • Court jurisdiction • How and why property is acquired • Public involvement PUBLIC LAND PROTECTION | 71

  72. Slide 72: Private vs. Public: Resolution of Disputes

    Slide 72: Private vs. Public: Resolution of Disputes

    Private vs. Public: Resolution of Disputes Encroachment Resolution Options • Private Land - Easement, Disposal, Removal/Litigation, Adverse Possession • TVA Public Land - TVA Policy and Congressional Disposal Authorities, Sufferance Agreement, Removal/Litigation PUBLIC LAND PROTECTION | 72

  73. Slide 73: Private vs. Public: Court Jurisdiction

    Slide 73: Private vs. Public: Court Jurisdiction

    Private vs. Public: Court Jurisdiction • Private Land - State Court Levels: Depends on state law, typically Circuit or Chancery Court • TVA Public Land - Federal Court Level: U.S. District Court PUBLIC LAND PROTECTION | 73

  74. Slide 74: Private vs. Public: How and Why Land was Acquired

    Slide 74: Private vs. Public: How and Why Land was Acquired

    Private vs. Public: How and Why TVA Public Land was Acquired • Congressional authority to acquire land in the name of the United States of America and entrusted to TVA as an agent of the United States to accomplish the purposes of the TVA Act • Land was acquired for construction of dams, reservoirs,

  75. Slide 75: Private vs. Public: How and Why Land was Acquired

    Slide 75: Private vs. Public: How and Why Land was Acquired

    Private vs. Public: How and Why TVA Public Land was Acquired Boundary Types - Acquisition vs. Sale - Straight Line vs. Contour - Sale with Retained Rights PUBLIC LAND PROTECTION | 75

  76. Slide 76: Private vs. Public: Public Involvement

    Slide 76: Private vs. Public: Public Involvement

    Private vs. Public: Public Involvement • The public has historically been very involved in TVA’s land and shoreline management policy development - In the 1990s for TVA’s Shoreline Management Initiative (which later became the Shoreline Management Policy), a total of 29 public meetings were held and

  77. Slide 77: TVA's Public Land Stewardship

    Slide 77: TVA's Public Land Stewardship

    TVA’s Public Land Stewardship • TVA has been entrusted to manage and protect approximately 293,000 acres of public land along its reservoir system and must balance land uses in order to achieve the greatest public benefit for the people of the Tennessee Valley. • TVA has a prominent history of resou

  78. Slide 78: Violations and Encroachments

    Slide 78: Violations and Encroachments

    Violations and Encroachments • Despite these focused efforts, TVA continues to experience abuse of TVA public land and has challenges resolving unauthorized uses. • TVA has documented approximately 15,000 violations and encroachments (V&Es) on reservoir property, and many more undocumented cases lik

  79. Slide 79: Violations and Encroachments

    Slide 79: Violations and Encroachments

    Violations and Encroachments V&Es encompass all unauthorized uses of TVA public land, including: • Trash dumping • Permanent or temporary structures, such as houses and boat docks, built without permission or in non-compliance with TVA policies, regulations, permits, or contracts • Damage from motor

  80. Slide 80: Prior RRSC Advice

    Slide 80: Prior RRSC Advice

    Prior RRSC Advice • TVA discussed encroachment resolution with a focus on legacy house encroachments with the RRSC in September 2015. Meeting minutes can be found at https://www.tva.gov/About-TVA/Our-Public-Advisory- Councils/Regional-Resource-Stewardship-Council. • The Council provided advice and a

  81. Slide 81: Prior RRSC Advice

    Slide 81: Prior RRSC Advice

    Prior RRSC Advice Consensus Advice Statement Public lands continue to be valuable to the citizens that TVA serves. The Council believes there should be no net loss of public lands under TVA’s policies. Address existing dwelling encroachments with a blend of existing regulations and flexibility. Pend

  82. Slide 82: TVA's Implementation of Prior RRSC Advice

    Slide 82: TVA's Implementation of Prior RRSC Advice

    TVA’s Implementation of Prior RRSC Advice Does the Council have additional ideas or guidance on how to prevent encroachments on TVA property? • In FY16 and FY17, TVA marked approximately 235 miles of public land boundary, with a more focused effort on land bordering private residential land in FY17

  83. Slide 83: TVA's Implementation of Prior RRSC Advice

    Slide 83: TVA's Implementation of Prior RRSC Advice

    TVA’s Implementation of Prior RRSC Advice For permanent structures, should TVA develop more flexible resolution options? As part of an overall Public Land Protection Program, TVA is considering a Public Land Protection Policy for review by the Board of Directors. The Policy could potentially address

  84. Slide 84: Public Land Protection Program

    Slide 84: Public Land Protection Program

    Public Land Protection Program In an attempt to resolve existing and discourage future V&Es, TVA is developing a Public Land Protection Program which encompasses efforts in four areas: • Education and outreach • Policies and regulations (including citation authority) • Prevention • Enforcement and r

  85. Slide 85: Legacy House Encroachments

    Slide 85: Legacy House Encroachments

    Legacy House Encroachments • One of the challenges in public land protection work is addressing encroachments that have been in existence for many years. TVA refers to these as “legacy” issues. • Approximately 110 suspected legacy house encroachments are documented on TVA public land. There are pote

  86. Slide 86: Legacy House Encroachment Resolution

    Slide 86: Legacy House Encroachment Resolution

    Legacy House Encroachment Resolution • Natural Resources seeks flexibility to resolve legacy house encroachments in a permanent, efficient, and effective manner. • TVA is considering small disposals to resolve legacy house encroachments. This would be in addition to our other resolution tools (i.e.,

  87. Slide 87: Questions for the RRSC

    Slide 87: Questions for the RRSC

    Questions for the RRSC 1. If TVA pursues the sale of public land to resolve legacy house encroachments with flexibility, how can TVA discourage future house encroachments? 2. What role should TVA play in protecting the public land it has in its custody and control? In what ways should the public be

  88. Slide 88: Break

    Slide 88: Break

  89. Slide 89: Lunch Break

    Slide 89: Lunch Break

    Lunch Break Meeting Adjourned for Today Meeting will reconvene tomorrow, 11/15, at 8:30 AM

  90. Slide 90: Aquatic Plant Management Program

    Slide 90: Aquatic Plant Management Program

    Aquatic Plant Management Program Dr. Brett Hartis Program Manager TVA Aquatic Plant Management Program

  91. Slide 91

    Slide 91

  92. Slide 92

    Slide 92

  93. Slide 93: Types of aquatic plants

    Slide 93: Types of aquatic plants

    \ -leaved plants free-floating plants oo emersed plants submersed plants ——— Littoral Zone >

  94. Slide 94: Why Aquatic Plants?

    Slide 94: Why Aquatic Plants?

    Why Aquatic Plants? • Habitat for fish and food/ habitat for wildlife • Stabilization • Oxygenation of water • Aesthetics

  95. Slide 95: How do aquatic plants spread?

    Slide 95: How do aquatic plants spread?

    How do aquatic plants spread? • Fragmentation • Water movement, wind • Animals (wading birds, aquatic mammals) • Human activities

  96. Slide 96: Invasive vs. Native

    Slide 96: Invasive vs. Native

    Invasive vs. Native • Non-indigenous • Endemic • Adversely affects habitats • Occurs naturally • No natural enemies • Part of ecosystem • Threaten biological diversity • Natural enemies • “Geographically Relative”

  97. Slide 97

    Slide 97

  98. Slide 98: Pond Plants & Products

    Slide 98: Pond Plants & Products

    Pond Plants & Products Teeten * "S Se CHAMIMEL , ROCK POQAD ev

  99. Slide 99

    Slide 99

  100. Slide 100: What's the Big Deal?

    Slide 100: What's the Big Deal?

    What’s the Big Deal? o Outcompetes Native/ Beneficial o Reduce water storage capacity Species o Reduces/ Halts Use o Fluctuations in Water Quality o *Impact Local Economy o Changes Habitat and Food Web

  101. Slide 101: Biodiversity: Balanced, Diverse Habitat

    Slide 101: Biodiversity: Balanced, Diverse Habitat

    BIODIVERSITY • Balanced, Diverse Habitat

  102. Slide 102: Biodiversity: Reduced Habitat Complexity

    Slide 102: Biodiversity: Reduced Habitat Complexity

    BIODIVERSITY • Reduced Habitat Complexity/ Unbalanced Diversity

  103. Slide 103: Why are some invasive and noxious in reservoirs?

    Slide 103: Why are some invasive and noxious in reservoirs?

    Why are some invasive and noxious in reservoirs? • Clear, Shallow water • High levels of nutrients • No Enemies • Competitive Advantage

  104. Slide 104: Biodiversity: Typical Reservoir Habitat

    Slide 104: Biodiversity: Typical Reservoir Habitat

    BIODIVERSITY • Typical Reservoir Habitat

  105. Slide 105: Biodiversity: Increased Reservoir Habitat

    Slide 105: Biodiversity: Increased Reservoir Habitat

    BIODIVERSITY • Increased Reservoir Habitat

  106. Slide 106: Why Manage Aquatic Plants?

    Slide 106: Why Manage Aquatic Plants?

    Why Manage Aquatic Plants? • Irrigation • Aesthetics • Drainage • Aquaculture • Flood control • Transportation • Water supply • Mosquito control • Power Operations • Fishing/Recreation

  107. Slide 107: Recreational Use

    Slide 107: Recreational Use

    Recreational Use

  108. Slide 108: Recreational Use

    Slide 108: Recreational Use

    Recreational Use

  109. Slide 109: Flood Control/ Commercial Use

    Slide 109: Flood Control/ Commercial Use

    Flood Control/ Commercial Use S. T. Hoyle, NCSU, 1999

  110. Slide 110: Mosquito

    Slide 110: Mosquito

    Mosquito F.. MEP.C.A

  111. Slide 111: More on mosquitoes

    Slide 111: More on mosquitoes

    More on mosquitoes An. quadrimaculatus A. aegypti

  112. Slide 112: TVA and Aquatic Plant Management

    Slide 112: TVA and Aquatic Plant Management

    TVA and Aquatic Plant Management • Main stem reservoirs (1930s and 1940s) • Vector control/ Malaria prevention • Focus – Management of Emergent/ Woody Vegetation and Water Level Manipulation | 112

  113. Slide 113: Introduction of Milfoil

    Slide 113: Introduction of Milfoil

    Introduction of Milfoil • Myriophyllum spicatum – Late 1950s • By Late 1960s – 27,000 acres in TVA • Focus - ERADICATION | 113

  114. Slide 114: PLACE THE TITLE OF THE PRESENTATION HERE | 114

    Slide 114: PLACE THE TITLE OF THE PRESENTATION HERE | 114

    PLACE THE TITLE OF THE PRESENTATION HERE | 114

  115. Slide 115: Early Days of APM

    Slide 115: Early Days of APM

    Early Days of APM PLACE THE TITLE OF THE PRESENTATION HERE | 115

  116. Slide 116: Early Days of APM

    Slide 116: Early Days of APM

    Early Days of APM PLACE THE TITLE OF THE PRESENTATION HERE | 116

  117. Slide 117: Early Days of APM

    Slide 117: Early Days of APM

    Early Days of APM PLACE THE TITLE OF THE PRESENTATION HERE | 117

  118. Slide 118: Realizing Tradeoffs

    Slide 118: Realizing Tradeoffs

    Realizing Tra deoffs y om IVA

  119. Slide 119: A Few Numbers…

    Slide 119: A Few Numbers…

    A Few Numbers… • Guntersville (#6), Kentucky (#12), Pickwick (#36), Chickamauga (#41) • Freshwater fishing, majority Bass – ~ $40B in US, $853M annually in AL, $237M Food, Lodging, Trans. | 119

  120. Slide 120: A Few More Numbers…

    Slide 120: A Few More Numbers…

    A Few More Numbers… • Invasive plants filling a niche they were never meant to fill…. • Reservoirs = First Invasion….. More to come • Agencies spending $$$Billions on Necessary management… limited budgets | 120

  121. Slide 121: Control Options

    Slide 121: Control Options

    Control Options • Prevention • Cultural • Mechanical/Physical • Biological • Chemical

  122. Slide 122: Prevention/ EDRR

    Slide 122: Prevention/ EDRR

    Prevention/ EDRR

  123. Slide 123: Cultural/Physical Mgt.

    Slide 123: Cultural/Physical Mgt.

    Cultural/Physical Mgt. • Modify environment to create less favorable conditions • Environmental impacts and cost varies by technique

  124. Slide 124: Mechanical Techniques

    Slide 124: Mechanical Techniques

    Mechanical Techniques • Site specific control • Short-term • Can spread issue • Relatively Expensive

  125. Slide 125: Biological

    Slide 125: Biological

    Biological • Relatively non-selective • Often used in reservoir management • Not desired in water with extensive native vegetation • Relatively cost effective • Stocking rates and survey critical

  126. Slide 126: Chemical

    Slide 126: Chemical

    Chemical • Aquatic labeled herbicides • Contact vs. Systemic • Selective vs. Broad-spectrum • Contact Time/ Exposure

  127. Slide 127: Nearshore Herbicide Applications

    Slide 127: Nearshore Herbicide Applications

    Nearshore Herbicide Applications | 127

  128. Slide 128: Mechanical Harvester

    Slide 128: Mechanical Harvester

    Mechanical Harvester | 128

  129. Slide 129: Integrated Management Strategy

    Slide 129: Integrated Management Strategy

    Integrated Management Strategy | 129

  130. Slide 130: Hydrilla

    Slide 130: Hydrilla

    Hydrilla | 130

  131. Slide 131: Hydrilla map of reservoirs

    Slide 131: Hydrilla map of reservoirs

    KENTUGKY pid Daeer ION 9 a8 VIRGIN a = = te ah ion take TENNESSEE Norio : yo hip ; eye oie y ONashville A a ; & $ K jox¥) eC Py F ne ~~ 0 lh, Watts Boy ake *) Quy. CAROLINA Buffalo " —_ J Chicka’ a u s % en t se Ki Oe ff eS aa aos Ek o> Be \ Oe dant} us Pick ck Lai es _. Wbon Lake a 7 od] > ae 2. ra

  132. Slide 132: Milfoil map of reservoirs

    Slide 132: Milfoil map of reservoirs

    \ KENTUCKY Paducah \\ vi } < Kentucky Loki é \ TENNESSEE Horta Late vg? { ¥ » y Nashville Th of At e : Knoxyflleq x hw > a he Hf Douigias | | 4 % + wn 0, Watts Bor Lake Pease” late O29 om: J NORTH I | Meg PF rene /%)%, \ C/,ROLINA } ws OTe ae | (Cuffalo ais ty Wer ag PP hrms ecco”; % ; he Chickamaug

  133. Slide 133: Aquatic Vegetation Valley-wide

    Slide 133: Aquatic Vegetation Valley-wide

    Aquatic Vegetaton Valley-wide 40,000 25,000 Total Acres 20,000

  134. Slide 134: Hydrilla, Milfoil, Spiny Naiad

    Slide 134: Hydrilla, Milfoil, Spiny Naiad

    Hydrilla Milfoil Spiny Naiad | 134

  135. Slide 135: Developed Public Access Area

    Slide 135: Developed Public Access Area

    Developed Public Access Area | 135

  136. Slide 136: Stakeholder Driven Management

    Slide 136: Stakeholder Driven Management

    Stakeholder Driven Management • “All those with a vested interest in the resource” • Water Body Specific • Develop Informed, Integrated Consensus Plan - Balance User Needs | 136

  137. Slide 137: The Key to Sound Management

    Slide 137: The Key to Sound Management

    _The Key to Sound Management

  138. Slide 138: Plant Camp

    Slide 138: Plant Camp

    Plant Camp UFITFAS Qaerr UNIVERSITY of FLORIDA Ai Piano

  139. Slide 139: American Lotus

    Slide 139: American Lotus

    American Lotus f ‘ Nelumbo lutea) Fishability/ Seasonal Techniques pring Bass in the Grass Tips on Fishing Aquatic Vegetation fame |VA Hahitat Value

  140. Slide 140: External Outlets

    Slide 140: External Outlets

    External Outlets Where has all the grass gone? December 7, 2075 | WF Tweet | Leg tn Dr. Brett Hartis We all know the story. The frog bite from a month ago was so hot that you just can’t wait to get back on the water, but a busy work schedule has kept the Ranger parked for the past few weeks. No worr

  141. Slide 141: Do you have a question about TVA Public Land?

    Slide 141: Do you have a question about TVA Public Land?

    " Deyou have a’quéstion . aboutTVA Public Land? =“ > Call 1-800-882-5263 PUBLIC LAND | "arear-rmow f INFORMATION CENTER | 7:00 AM. - 5:00 PM. csT__? ; email: plic@tva.com - website: www.tva.com/plic :

  142. Slide 142: TVA

    Slide 142: TVA

    IVA

  143. Slide 143: Regional Resource Stewardship Council

    Slide 143: Regional Resource Stewardship Council

    Regional Resource Stewardship Council November 14 - 15, 2017 Guntersville, Alabama

  144. Slide 144: Welcome

    Slide 144: Welcome

  145. Slide 145: Agenda – Nov 15, 2017

    Slide 145: Agenda – Nov 15, 2017

    Agenda – Nov 15, 2017 8:30 Welcome and Recap Liz Upchurch, Facilitator 8:45 Preliminary Water Use Amanda Bowen Report 9:15 Prepare for Public Comment Period 9:30 Public Comment Period Upchurch, Facilitator 10:30 Council Discussion / Form Upchurch, Facilitator and Council Advice 12:00 Wrap Up and Adj

  146. Slide 146: Day 1 Recap

    Slide 146: Day 1 Recap

    Day 1 Recap • Updates on River and Natural Resource Management • Update of Natural Resource Plan • TVA Public Land Protection Program Regional Resource Stewardship Council | 146

  147. Slide 147: Water Use in the Tennessee Valley for 2015: Preliminary Results

    Slide 147: Water Use in the Tennessee Valley for 2015: Preliminary Results

    Water Use in the Tennessee Valley for 2015: Preliminary Results Amanda Bowen, PE November 15, 2017

  148. Slide 148: The Importance of Water in the TN Valley

    Slide 148: The Importance of Water in the TN Valley

    The Importance of Water in the TN Valley “The principal water problem in the early twenty-first century will be one of inadequate and uncertain supplies…” - National Research Council TN River System is the fifth largest river system in the US Nearly 5 million people rely on Thermoelectric Cooling Mu

  149. Slide 149: Why the Concern?

    Slide 149: Why the Concern?

    Why the Concern? The quality of life in our region depends upon ample water for homes, businesses, farms, meeting places, and recreational activities Dependable water is as fundamental to the economic growth of the region as is dependable, low-cost electricity It is anticipated that water supply and

  150. Slide 150: Southeastern US Population Growth

    Slide 150: Southeastern US Population Growth

    Southeastern US Population Growth 1990 2015 Growth Rate Population1 Population1 (%) Georgia 6,478,149 10,199,398 57 North Carolina 6,632,448 10,035,186 51 Virginia 6,189,197 8,367,587 35 Tennessee 4,877,203 6,595,056 35 US Average 248,790,925 320,896,618 29 Alabama 4,040,389 4,853,875 20 Kentucky 3,

  151. Slide 151: Water Use Report History

    Slide 151: Water Use Report History

    Water Use Report History Validates Water Use Study estimates from initiated with the 2000 Report 2000 Water Use and increases Estimates and projections to 2030 Projections 2035 2000 2005 2010 2015 Validates Validates estimates from estimates from the 2000 Report 2000 Report and and verifies plans to

  152. Slide 152: TVA's Uses of the Water Use Report

    Slide 152: TVA's Uses of the Water Use Report

    TVA’s Uses of the Water Use Report WATER USE IN THE TENNESSEE VALLEY IN 2015: PRELIMINARY RESULTS | 152

  153. Slide 153: Improvements from Previous Reports

    Slide 153: Improvements from Previous Reports

    Improvements from Previous Reports • Only Report Data by Reservoir Catchment Areas - Previous reports reported data by State/County, 6 digit HUC, and Reservoir Catchment Area - Improved to align with TVA’s uses of the report • Extend projections to 2040 - Previous Reports reported to 2030 and 2035 -

  154. Slide 154: Water Use in 2015

    Slide 154: Water Use in 2015

    Water Use in 2015 Withdrawal Total – 10.0 billion gallons per day 8,224 mgd 695 mgd ~82% of total ~7% of total Thermoelectric Cooling Municipal Supply 1,033 mgd 63 mgd ~10% of total ~1% of total Industrial Supply Irrigation WATER USE IN THE TENNESSEE VALLEY IN 2015: PRELIMINARY RESULTS | 154

  155. Slide 155: Water Use in 2015

    Slide 155: Water Use in 2015

    Water Use in 2015 Withdrawal Total – 10.0 billion gallons per day Return Total – 9.59 billion gallons per day 8,224 mgd 695 mgd ~82% of total ~7% of total 8,155 mgd 462 mgd Thermoelectric Cooling ~1% loss Municipal Supply ~33% loss 1,033 mgd 63 mgd ~10% of total ~1% of total 974 mgd 0 mgd Industrial

  156. Slide 156: Withdrawals by Reservoir

    Slide 156: Withdrawals by Reservoir

    Withdrawals by Reservoir 0.53 – 5.01 mgd 15.72 – 88.13 mgd 405 – 621 mgd 1026 – 1674 mgd 3087 mgd WATER USE IN THE TENNESSEE VALLEY IN 2015: PRELIMINARY RESULTS | 156

  157. Slide 157: Returns by Reservoir

    Slide 157: Returns by Reservoir

    Returns by Reservoir 0.00 – 9.05 mgd 17.81 – 91.59 mgd 330 – 991 mgd 1005 – 1756 mgd 3032 mgd WATER USE IN THE TENNESSEE VALLEY IN 2015: PRELIMINARY RESULTS | 157

  158. Slide 158: Comparison of Water Use Over 20 Years

    Slide 158: Comparison of Water Use Over 20 Years

    Comparison of Water Use Over 20 Years 1995 2000 2005 2010 2015 % Change (mgd) (mgd) (mgd) (mgd) (mgd) 1995 to 2015 Total 10,008 12,211 12,437 11,951 10,015 +0.1% Withdrawal Thermoelectric 8,010 10,276 10,531 10,046 8,224 +2.7% Industrial 1,030 1,205 1,179 1,148 1,033 +0.3% Public Supply 574 662 684

  159. Slide 159: Steps Before Final Publication

    Slide 159: Steps Before Final Publication

    Steps Before Final Publication • Complete projections to 2040 • Complete peer review Goal is for the publication to be released to the public on tva.gov early 2018 WATER USE IN THE TENNESSEE VALLEY IN 2015: PRELIMINARY RESULTS | 159

  160. Slide 160: Break

    Slide 160: Break

  161. Slide 161: Break – Prepare for Public Comment Period

    Slide 161: Break – Prepare for Public Comment Period

    Break Prepare for Public Comment Period

  162. Slide 162: Public Comment Period

    Slide 162: Public Comment Period

    Public Comment Period • Public participation is appreciated • This is a listening session; responses are typically not provided

  163. Slide 163: RRSC Discussion and Advice

    Slide 163: RRSC Discussion and Advice

    MA RRSC Discussion and Advice

  164. Slide 164: Advice Questions

    Slide 164: Advice Questions

    Advice Questions 1. If TVA pursues the sale of public land to resolve legacy house encroachments with flexibility, how can TVA discourage future house encroachments? 2. What role should TVA play in protecting the public land it has in its custody and control? In what ways should the public be inform

  165. Slide 165: Wrap Up and Adjourn

    Slide 165: Wrap Up and Adjourn

    MA Wrap Up and Adjourn

  166. Slide 166: Lunch

    Slide 166: Lunch

    Lunch

  167. Slide 167: Thank you and please travel safely!

    Slide 167: Thank you and please travel safely!

    Thank you and please travel safely!

  168. Slide 168

    Slide 168

  169. Slide 169: Summary: RRSC Guiding Principles

    Slide 169: Summary: RRSC Guiding Principles

    RRSC Guiding Principles: Summary ‹ The RRSC provided the following “guiding principles” for the NRP during its meeting in January:, 2011 Guiding Principle How It Is Incorporated Managing M i ththe river i comes with ith th the — The Th NRP, NRP att a minimum, i i provides id TVA withith a plan l tto

  170. Slide 170: Summary (Cont'd)

    Slide 170: Summary (Cont'd)

    RRSC Guiding Principles: Summary (Cont’d) Guiding Principle How It Is Incorporated Recognize that some activities (e.g., public — Some programs presented in the draft NRP were outreach, data management, evaluation, mainly focused on implementation or data collection b boundary d marking, ki etc.), )

  171. Slide 171: Summary (Cont'd)

    Slide 171: Summary (Cont'd)

    RRSC Guiding Principles: Summary (Cont’d) Guiding Principle How It Is Incorporated Encourage and incorporate public input into — Public input is being solicited through the public the development of the NRP, allowing for comment period, visits to a number of other agencies, sufficient ffi i time i a

  172. Slide 172

    Slide 172

  173. Slide 173: Charter of the Regional Resource Stewardship Council

    Slide 173: Charter of the Regional Resource Stewardship Council

    Charter of the Regional Resource Stewardship Council (Ninth Term) 1. Committee’s Official Designation. Regional Resource Stewardship Council (the Council). 2. Authority. The Council is a discretionary advisory committee established under the authority of the Tennessee Valley Authority (TVA) in accor

  174. Slide 174: Charter (continued)

    Slide 174: Charter (continued)

    and trained as an alternate DFO) shall approve or call all of the Council’s meetings and any meetings of subcommittees, approve the agenda for each meeting, attend all meetings of the Council and its subcommittees, adjourn any meeting when the DFO determines adjournment to be in the public interest,

  175. Slide 175: Charter (continued)

    Slide 175: Charter (continued)

    not provide advice or work products directly to TVA. 14. Recordkeeping. The records of the Council, formally and informally established subcommittees, or other subgroups of the Council shall be handled in accordance with General Records Schedule 6.2 or other approved agency records disposition sched

Source: Internet Archive copy of tva.com

More decks from Tennessee Valley Authority

All 156 Tennessee Valley Authority decks