Pure Gold Mining — Shareholder Meeting (September 2016)
17 slides from Pure Gold Mining's shareholder meeting presentation, September 2016
Slide 1: Annual General Meeting September 2016
September 2016 PGM:TSX-V Annual General Meeting
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: Share Performance Since October 2015
Pure Gold Mining SHARE PERFORMANCE SINCE OCTOBER 2015 $0.80 20-May-2016 SHARE PRICE PERFORMANCE Final closing of sale of non- core assets to Premier Gold; $0.70 +564% since October 1, 2015 Realized $5.9 million for cash +535% since January 1, 2016 & shares Relative performance since January 1, 2016:
Slide 4: A Fresh Look at a Historic Producer
Pure Gold Mining A FRESH LOOK AT A HISTORIC PRODUCER JURISDICTION Red Lake, Ontario, Canada – an established mining district with more than 28 million ounces of high grade gold produced to date (1) HIGH GRADE GOLD One of the highest grade undeveloped deposits in the world (2) with currently defined
Slide 5: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at September 21, 2016) Key Shareholders (2) Shares Outstanding 172.6 million Management & Directors 4.4% Options Outstanding 8.3 million Strategic Shareholders 22.4% Weighted average exercise price $0.27 AngloGold Ashanti 12.0% Evanachan Ltd.
Slide 6: Red Lake Mining District: Highest Grade Gold Belt in Canada
Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with +85 year history • 1.3 million ounces of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (2) • District cont
Slide 7: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT 3rd largest 2.5 million oz HISTORIC PRODUCTION (1) 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE (1) • Permitted mill and tailings management facility • 45 km2 contiguous, patented claims • Second largest historic producer in Re
Slide 8: +$200 Million of Existing Infrastructure
Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE Interior of Madsen mill Madsen mine complex, Russet South in background 1,275 metre deep shaft Permitted tailings facility & 27 levels of workings Madsen mill 7
Slide 9: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested • 10 kms of unconformity and +30 kms of prospective contact zone mineralization 8
Slide 10: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report on the Preliminary Economic As
Slide 11: Austin – McVeigh Fold Repetition
Madsen Mine Geology AUSTIN – MCVEIGH FOLD REPETITION McVeigh • Limited near-surface production with a maximum historic mining depth of 230 metres • Open for expansion – focus of expanded 2016 drill program Austin • Hanging wall horizon extensively mined from surface to a depth of 1,200 metres Hist
Slide 12: Targeting High Grade Gold Shoots at McVeigh
Madsen 2016 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016, July 14, 2016, August 9, 2016 and September 9, 2016 for further details and disclosure; See the National Instrument 43-101 technica
Slide 13: Targeting High Grade Gold Shoots at McVeigh
Madsen 2016 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016, July 14, 2016, August 9, 2016 and September 9, 2016 for further details and disclosure; See the National Instrument 43-101 technica
Slide 14: Targeting High Grade Gold Shoots at McVeigh
Madsen 2016 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016, July 14, 2016, August 9, 2016 and September 9, 2016 for further details and disclosure; See the National Instrument 43-101 technica
Slide 15: Multiple Exploration Targets Identified
Madsen Satellite Zones MULTIPLE EXPLORATION TARGETS IDENTIFIED 14
Slide 16: Near-Term Anticipated Catalysts
Pure Gold Mining NEAR-TERM ANTICIPATED CATALYSTS EXPLORATION PROGRAM • Continued results from drilling at McVeigh and satellite targets • 18,468 metres of pending drill results from the on-going 51,000 metre drill program • Drilling anticipated to continue through the balance of 2016 and into 2017 R
Slide 17: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca
Pure Gold Mining — Shareholder Meeting (September 2016) on 6ix