Endomines Finland Oyj · OMXHEX:PAMPALO

Endomines Finland Oyj — Investor Day (March 2026)

105 slides from Endomines Finland Oyj's investor day presentation, Mar 27, 2026

  1. Slide 1: Capital Markets Day 2026

    Capital Markets Day 2026 March 27, 2026

  2. Slide 2: Endomines CMD 2026: Agenda

    Endomines CMD 2026: Agenda Time (EET) Program Presenter 10:00 Opening of the CMD Anni Turpeinen, Chief Communications Officer 10:05 Building a Finnish sustainable success story Kari Vyhtinen, CEO 10:20 Production – from rock to gold Ilkka Räty, Chief Operations Officer 10:40 Exploration – gold poten

  3. Slide 3: The group's management team

    The group’s management team Kari Vyhtinen Ilkka Räty Jani Rautio Anni Turpeinen CEO Chief Operations Officer Chief Technical Officer Chief Communications Officer Hanne Mäkelä Sampo Hirvonen Minna Karttunen Chief Sustainability Officer Chief Development Officer Chief Financial Officer 3

  4. Slide 4: Disclaimer

    Disclaimer This presentation contains forward-looking statements (such as, by way of example only, expressions “believes”, “expects”, “foresees” or similar) that reflect the current views and assumptions of Endomines Finland Oyj (“Endomines”). These forward-looking statements include (but may not be

  5. Slide 5: Building a Finnish sustainable success story

    Building a Finnish sustainable success story Kari Vyhtinen, CEO 5

  6. Slide 6: Golden opportunity in Finland

    Golden opportunity in Finland Growing Gold Production Expanding Gold Resources Endomines is increasing gold production Growing gold resources strengthen value in Finland, with a clear path to sustained creation and enable long-term growth. growth. Strategic control of the Global trends support long-

  7. Slide 7: Karelian Gold Line

    KARELIAN GOLD LINE Northern Gold Line Karelian Gold Line A high-potential gold bearing greenstone belt in Finland 40 km long gold belt in Finland Pampalo Production facilities located at Pampalo Exploration focuses on the Southern and Northern Gold Lines Critical minerals opportunity: Tungsten & mol

  8. Slide 8: Major turnaround achieved in 2022–2025

    Major turnaround achieved in 2022–2025 Group Revenue Group EBITDA Group EBIT (MEUR) (MEUR) (MEUR) 55 45 20 35 15 10 25 10 5 5 15 5 0 0 2022 2023 2024 2025 -5 2022 2023 2024 2025 2022 2023 2024 2025 -5 -10 -10 -15 -20 High YoY growth 2025 Group EBITDA 2025 Group EBIT (46–59%) 36% of revenue 17% of re

  9. Slide 9: Robust production growth with more to follow

    Robust production growth with more to follow Pampalo gold production +16.3% (oz) compared 18 000 +93% to 2024 16 000 14 000 12 000 10 000 8 000 Improvement in 6 000 financial performance is 4 000 a result of growing 2022 2023 2024 2025 production volumes and strong gold price 9

  10. Slide 10: Market development

    Market development Currently the war in Iran effects the market Gold price development (USD/ounce) • Profit taking from gold to compensate losses 5300 • Forecast for interest rate cuts is delayed 4800 Basic fundamentals still support gold 4300 • Global geopolitical uncertainty 3800 • Central banks b

  11. Slide 11: Executing our strategy

    ENDOMINES EXECUTING OUR STRATEGY

  12. Slide 12: Strategy 2025–2029

    Strategy 2025–2029 PAMPALO EXPLORATION CRITICAL MINERALS PRODUCTION drives our long-term is our emerging is the engine of our growth exploration area performance and future at Karelian Gold Line scale FINANCIAL STABILITY SUSTAINABILITY supports the next phase is the backbone for all our through smar

  13. Slide 13: Strategic long-term targets

    Strategic long-term targets • 1.5–2.0 million oz gold resource defined on the Karelian Gold Line by the end of 2030 • Annual gold production level of 70,000-100,000 ounces around 2030 • Tungsten and molybdenum production at Karelian Gold Line around 2030 • Fossil Free gold production by the 2035 13

  14. Slide 14: How are the long-term targets achieved?

    HOW ARE THE LONG-TERM TARGETS ACHIEVED?

  15. Slide 15: Resource growth enables long-term growth

    Resource growth enables long-term growth Karelian Gold Line Resources 600 000 Exploration +211% from started 500 000 2022 to 2025 400 000 300 000 200 000 100 000 0 2020 2021 2022 2023 2024 2025 15

  16. Slide 16: Step-by-step growth in gold resource

    Step-by-step growth in gold resource It is estimated that every 10,000 m of pure exploration drilling 2026 program results in 100,000 oz will be the largest resource growth in the company history Target level 1.5–2.0 120,000 metres of Moz gold resource exploration drilling Target to define 18,000 me

  17. Slide 17: Larger resource enables us to increase production volume

    Larger resource enables us to increase production volume to higher level 17

  18. Slide 18: Step-by-step production growth in gold and critical minerals

    Step-by-step production growth in gold and critical minerals Southern Gold Line entering production Further growth by bringing new Ramp-up to areas into 70,000–100,000 production oz (i.e. Northern Gold Line) Tungsten and Steady growth molybdenum toward entering 10–20% 16,630 oz ~25,000 oz production

  19. Slide 19: Critical minerals is our emerging exploration area

    Critical minerals is our emerging exploration area at Karelian Gold Line 19

  20. Slide 20: Enabling Europe's critical mineral supply

    Enabling Europe’s critical mineral supply Tungsten is one of 14 critical raw materials identified by the EU • High supply risk: Over 80% of global supply from China • Irreplaceable properties: Extreme hardness & heat resistance • Strategic importance: Essential for defense, mining tools, aerospace,

  21. Slide 21: USA Update

    ENDOMINES USA UPDATE

  22. Slide 22: Gold assets in the United States

    Gold assets in the United States Idaho: Montana: Friday US Grant Deadwood Kearsarge Buffalo Gulch Rescue Kimberly • Friday, Deadwood and Buffalo Gulch were divested in 2025 • Endomines retains control of Rescue and Kimberly in Idaho, and US Grant and Kearsarge in Montana

  23. Slide 23: Strong gold potential in Montana

    Strong gold potential in Montana US Grant – historical mine • Historic underground gold and silver mine with rich mineralization and solid infrastructure. • Small Miners Exemption permit received in 2024 Kearsarge – high-volume potential • Latest drilling results: • Drill hole KSRC_18_03 intersected

  24. Slide 24: Thank you!

    Thank you!

  25. Slide 25: Production – from rock to gold

    Production – from rock to gold Ilkka Räty, Chief Operations Officer 25

  26. Slide 26: Pampalo today

    ENDOMINES PAMPALO TODAY

  27. Slide 27: Pampalo production is the engine of our performance

    Pampalo production is the engine of our performance Pampalo mine • Underground mine and open pit • Depth: 1,000 m • Grades: underground 2.5–3.0 g, open pit 0,8–1,3 g • Share of annual gold production 80–90% Hosko mine • Underground mine, opened in 2024 • Depth: 150 m • Grade: 1.5–5.0 g • Share of an

  28. Slide 28: Economic drivers of open pit and underground mining

    Economic drivers of open pit and underground mining Open-pit mining • Generally cheaper and faster • More attractive when the ore body is near the surface and can be mined at large scale Underground mining • Usually more expensive per ton • Economically attractive for deeper, higher- grade deposits

  29. Slide 29: Ore tonnes to ounces – underground process step by step

    Ore tonnes to ounces – underground process step by step • Planning • Ore body modelling • Mine layout design • Mining method selection • Production sequencing • Drilling and blasting design • Infrastructure and safety planning Safety is our core value! 29

  30. Slide 30: From ore to value – a proven path to gold concentrate

    From ore to value – a proven path to gold concentrate 30

  31. Slide 31: Environmental monitoring ensures responsible and compliant mining operations

    Environmental monitoring ensures responsible and compliant mining operations Water and process water Dust and air quality • Quality of discharge waters (e.g., metals, • Dust fallout measurements. suspended solids, pH, sulphate). • Monitoring particulate concentrations both • Impact on downstream wat

  32. Slide 32: Life cycle of mining operations – mine closure planned from the start

    Life cycle of mining operations – mine closure planned from the start • Pampalo is an orogenic underground deposit with Closure and land rehabilitation planned from the proven vertical continuity from surface to depth beginning: • Infrastructure removed • No indications that the mineralization is di

  33. Slide 33: Pampalo cost structure

    ENDOMINES PAMPALO COST STRUCTURE

  34. Slide 34: Pampalo cost structure (OPEX) – capital efficiency and scalability

    Pampalo cost structure (OPEX) – capital efficiency and scalability 2024 2025 2026e 6% 8% 8% 13% 14% 17% 7% 5% 67% 8% 60% 48% 8% 13% 19% Subcontracting Supplies Electricity Employee Other costs 34

  35. Slide 35: Cash cost in Pampalo

    Cash cost in Pampalo Cash cost in Pampalo, excluding investments (EUR / ounce) • Cash cost in 2025 increased by 1 800 11.8% to 1,432 EUR per ounce 1 700 • Extraction of lower gold grade 1 600 ore due to high gold price 1 500 • Costs related to takeover of the 1 432 underground mining business 1 400

  36. Slide 36: Endomines adapting to electricity and mining tax

    Endomines adapting to electricity and mining tax Background • In 2025, the Finnish Parliament approved amendments to the Act on Mined Minerals Tax • Significantly increased tax burden on mined minerals as of 1 A mix of actions to reduce energy January 2026 consumption, work more efficiently, and res

  37. Slide 37: Pampalo going forward

    ENDOMINES PAMPALO GOING FORWARD

  38. Slide 38: Robust production growth with more to follow

    Robust production growth with more to follow Pampalo gold production +16.3% compared (oz) to 2024 +93% 18 000 16 000 14 000 12 000 10 000 8 000 6 000 Improvement in financial performance is a 4 000 result of growing 2022 2023 2024 2025 production volumes and strong gold price 38

  39. Slide 39: Step-by-step production growth in gold and critical minerals

    Step-by-step production growth in gold and critical minerals Southern Financed from Gold Line cash flow and entering existing facilities production Further growth by bringing new Growth comes from Pampalo Ramp-up to areas into 70,000–100,000 production oz (i.e. Northern Gold Line) Tungsten and Stead

  40. Slide 40: Pampalo production: unlocking full capacity

    Pampalo production: unlocking full capacity Pampalo production plant has excess capacity Growth estimated to come mainly from without significant investments underground production – growth enabled • Currently production running 8 days on / 2 days off by existing capacity • Target to change to 24/7

  41. Slide 41: Working closely with local people

    Working closely with local people Continuous dialogue and presence in the local community • Annual Open Day at the mine for community members • Neighbourhood meetings (“tupaillat”) with residents around the mine • Stakeholder cooperation group launched in early 2026 • Sponsoring local sports, hobbie

  42. Slide 42: Thank you!

    Thank you! 42

  43. Slide 43: Exploration – Karelian Gold Line

    Exploration – Karelian Gold Line Jani Rautio, CTO 43

  44. Slide 44: Exploration today

    ENDOMINES EXPLORATION TODAY

  45. Slide 45: Karelian Gold Line

    Northern KARELIAN GOLD LINE Gold Line Karelian Gold Line A high-potential gold bearing greenstone belt in Finland Pampalo 40 km long gold line in Finland within the Ilomantsi Archean greenstone belt Production facilities are located at Pampalo Exploration in the Southern Gold Line and Northern Gold

  46. Slide 46: A multi-stage exploration approach

    A multi-stage exploration approach Geophysics Soil geochemistry Outcrop mapping Base of till sampling Diamond drilling Drill core logging Resource estimate 46

  47. Slide 47: Exploration pipeline – stages of exploration

    Exploration pipeline – stages of exploration 2-5 years 2-5 years 2-6 years Drill-ready target Delineation Inferred resource Upgrading Drill Target drilling resource (JORC) definition – (JORC) Ore reserve (JORC) Karelian Heinä BOT Gold Line Ukkolanvaara Huhus • Geophysics Northern Southern Gold Kuitt

  48. Slide 48: High-performance exploration team

    High-performance exploration team • The team consists of eight geologists and two geotechnicians • Supported by number of highly experienced consultants • Proven track record of discovery success • Strong geological modelling and interpretation capability • Innovative targeting and disciplined execu

  49. Slide 49: Recent exploration results

    RECENT EXPLORATION RESULTS 49

  50. Slide 50: Karelian Gold Line – an emerging gold camp

    Karelian Gold Line – an emerging gold camp Endomines has secured mineral rights on the Ilomantsi greenstone belt Pampalo • 9,630 ha of valid mineral exploration permits 100 km • 32,341 ha of application for mineral exploration permits • 935 ha of valid reservations Endomines is the main owner of val

  51. Slide 51: Major discovery every year

    Major discovery every year Northern Gold Line Southern Gold Line: Northern Gold Line: Southern Gold Line: Kuittila re-discovery Kartitsa discovery Ukko discovery • Drill hole KT-007 - • Drill hole KA-014 - • Drill hole UKKO-001 - 18.00 m @ 5.0 g/t 13.05 meters @ 30.95 meters @ Pampalo gold & 173.6 g

  52. Slide 52: Northern Gold Line: Kartitsa

    Northern Gold Line: Kartitsa ⁓800 m Exploration and resource drilling started in 09/2025 • Resource drilling concentrated along the trend defined during 2024 • Drill hole KA-053 intersected 7.30 m @ 7.10 g/t gold, including 0.80 m @ 51.50 g/t gold • A lot of visible gold observed in KA-053 • Initial

  53. Slide 53: Southern Gold Line: The Ukko discovery

    Southern Gold Line: The Ukko discovery Discovery area BIF-hosted gold deposit Endomines identified a remarkable exploration target in Ukkolanvaara: 10+ conductive bodies identified along the margin of the prospective iron formation. ~7 km 53

  54. Slide 54: Southern Gold Line: The Ukko discovery

    Southern Gold Line: The Ukko discovery A . B . 3 The results received to . 2 date indicate a large 1 mineralised system. . 6 Gold grade is evenly distributed . 5 within the sulphidised iron . formation UKKO cross-section 4 Lithologies: 1. UKKO-001: 30.95 m @ 3.28 g/t Overburden . Au from 45.55 m 7 M

  55. Slide 55: Southern Gold Line: Critical mineral opportunity

    Southern Gold Line: Critical mineral opportunity ppm A significant tungsten and molybdenum exploration potential in the Ukko 2 km Southern Gold Line Muurinsuo • In the Kuittila notable tungsten and molybdenum values in the vicinity of gold mineralization • Tungsten grades up to 0.59% for Korvilansuo

  56. Slide 56: Looking ahead

    ENDOMINES LOOKING AHEAD

  57. Slide 57: Resource growth enables long-term growth

    Resource growth enables long-term growth Karelian Gold Line Resources +211% in 600000 three years 500000 Exploration started Endomines exploration successfully 400000 Ounces of gold delivered meaningful resource growth for three consecutive years. 300000 • 12,800 m drilled in 2023 200000 • 21,600 m

  58. Slide 58: Exploration focus areas in 2026

    Exploration focus areas in 2026 Endomines aims to: • Increase the amount of exploration drilling to 50,000 m per year • Demonstrate the large-scale potential of the Ukkolanvaara project with completion of the first resource estimate • Test the tungsten and molybdenum potential in the Southern Gold L

  59. Slide 59: Thank you!

    Thank you! 59

  60. Slide 60: Q&A

    ENDOMINES Q&A

  61. Slide 61: Break – 15 min

    Anni, saisiko tähän Break – 15 min kuvan 61

  62. Slide 62: Sustainability – the only way forward

    Sustainability – the only way forward Hanne Mäkelä, Chief Sustainability Officer 62

  63. Slide 63: Sustainability today

    ENDOMINES SUSTAINABILITY TODAY

  64. Slide 64: Strategic sustainability as foundation for competitive advantage

    Strategic sustainability as foundation for competitive advantage • Enhances our risk management by identifying and addressing ESG-risks proactively reducing disruptions, incidents and reputational damage. • Improves our ability to adapt to changing conditions such as climate change, regulatory requi

  65. Slide 65: We aim to set an example for the entire mining industry

    We aim to set an example for the entire mining industry CLIMATE PERSONNEL • Fossil-free gold production at the • Safe and pleasant place to work Karelian Gold Line by 2035 • Developing safety practices with • Net-zero across the value chain the goal of zero accidents WATER COMMUNITY • Clean discharg

  66. Slide 66: Sustainability program status

    Sustainability Report 2025 Sustainability program status was published on March 26th CLIMATE PERSONNEL • Emission intensity: 0,74 • LTI frequency halved in 2025 (10,1) CO₂e t/gold ounce • Employee engagement rating on • Climate transition plan in the benchmark level ( A+) making WATER COMMUNITY • 10

  67. Slide 67: Sustainability tomorrow

    ENDOMINES SUSTAINABILITY TOMORROW

  68. Slide 68: Regenerative mining

    Traditional Regenerative mining mining Regulatory compliance Net positive impact Environment Disposal Waste Circularity Limited to Community Continuous and interactive regulatory requirements engagement Reactivity Technology Renewal and data Operational lifespan of the mine Time horizon Positive leg

  69. Slide 69: The regenerative mining model

    The regenerative mining model

  70. Slide 70: The Regenerative Mining Model

    The Regenerative Mining Model Symbiosis How does the mine interact In regenerative mining, with natural systems? these three focus areas merge into an interactive and measurable system. WATER MATERIALS AND BALANCE SIDE STREAMS ENERGY BIODIVERSITY AND EMISSIONS TRANSPARENCY AND DATA Integration Intel

  71. Slide 71: Nature sets the boundaries for our choices

    1 ECOSYSTEM-BASED OPERATIONS Nature sets the boundaries for our choices Water and biodiversity form the ecological foundation of mining. If we operate beyond nature’s limits, our solutions will not be viable in the long term.  WATER BALANCE  ENERGY AND EMISSIONS  MATERIALS AND SIDE STREAMS  BIOD

  72. Slide 72: Restoration of aquatic ecosystems

    WATER BALANCE Restoration of aquatic ecosystems Water balance is the single most critical factor for mining operations in the long term. In the Living Mine operational model, mining does not degrade the state of groundwater or surface water and, at its best, supports the recovery of aquatic ecosyste

  73. Slide 73: Predictive energy systems

    ENERGY AND EMISSIONS Predictive energy systems Energy is one of the largest sources of both costs and emissions. We are moving toward a fossil-free and anticipatory energy system that adapts to the changing needs of the environment and mining operations. We are developing the energy system with the

  74. Slide 74: Circular use of extractive waste

    MATERIALS AND SIDE STREAMS Circular use of extractive waste Mining waste constitutes the largest physical footprint of our operations. Our aim is to minimize waste by effective mine planning and improved material recovery. We also work to ensure that materials are recycled and utilized throughout th

  75. Slide 75: Pathways to net positive impact

    BIODIVERSITY Pathways to net positive impact Mining causes changes to biodiversity in aquatic ecosystems, landscapes, and species. We collaborate with local stakeholders to identify, protect, and restore the most important natural sites. We progress step by step from a no net loss level toward net p

  76. Slide 76: Data drives operational actions

    2 OPERATIONAL INTELLIGENCE Data drives operational actions Monitoring, measurements and data guide our daily operations. Effective operations require foresight and control, enabling us to evolve, learn and plan further ahead. Based on data, we develop ways of working that exceed regulatory requireme

  77. Slide 77: Intelligent system optimization

    CHEMICALS AND PROCESS SAFETY Intelligent system optimization The foundation of trust and operational reliability is built on the ability to manage environmental risks and the technical system in a proactive way. In the AliveMine operating model, we reduce chemical load and improve process safety.

  78. Slide 78: Data and transparency for trust

    TRANSPARENCY AND DATA Data and transparency for trust Transparency and reliable data create the factual foundation for trust. We continuously monitor environmental and operational indicators and convert complex information into clear and understandable insights. This enables better decision-making f

  79. Slide 79: Acceptability guides our vision of tomorrow

    3 SOCIETAL INTEGRATION Acceptability guides our vision of tomorrow Local communities, the mine’s working environment, and transparency influence how mining is perceived and accepted. Without trust, there is no license to operate, and without wellbeing people, there can be no sustainable operations.

  80. Slide 80: Human and social continuity

    PEOPLE AND PLACE Human and social continuity Human and social continuity is the ethical backbone of mining, defining the true legitimacy of operations. In the AliveMine model, this means strengthening regional vitality and building a safe working environment that supports wellbeing and encourages de

  81. Slide 81: Change happens together

    We have begun our journey toward net positive impact. We invite you to join us in developing the Alive Mine operating model. Change happens together.

  82. Slide 82: Thank you!

    Thank you! 82

  83. Slide 83: Development – driving our growth to the next level

    Development – driving our growth to the next level Sampo Hirvonen, Chief Development Officer 83

  84. Slide 84: Next-generation gold production around 2030

    Next-generation gold production around 2030 • New production facility planned ~2030 • Four (4) potential locations under assessment in the EIA process. • Scaling gold production to 70,000-100,000 oz • High-value final products: premium concentrate or responsibly refined gold doré. • Tungsten and mol

  85. Slide 85: Step-by-step production growth in gold and critical minerals

    Step-by-step production growth in gold and critical minerals Southern Gold Line entering production Further growth by bringing new Growth comes from Pampalo Ramp-up to areas into 70,000–100,000 production oz (i.e. Northern Gold Line) Tungsten and Steady growth molybdenum toward entering 10–20% 16,63

  86. Slide 86: Design parameters for growth

    Design parameters for growth Future Production Flows Southern Gold Line – Two-Phase Production System • Pampalo: ~25,000 oz gold Phase 1 • Southern Gold Line: ~45,000–75,000 oz gold • Production capacity: 1.5 Mt of gold • Resource growth target for ore Southern Gold Line: >600,000 oz • Output: 60,00

  87. Slide 87: Southern Gold Line development plan

    KARELIAN GOLD LINE Southern Gold Line development plan Includes four deposits which are permitted together as base of till samples indicate that some parts could be connected Southern Gold Line will boost production to: • 70,000–100,000 oz gold per annum Pampalo • Tungsten and molybdenum included 20

  88. Slide 88: Step-by-step growth in gold resource in Southern Gold Line

    Step-by-step growth in gold resource in Southern Gold Line 2026 program of 50,000 m will be the largest in the company history Endomines target level is Investment decision: 1.5–2.0 Moz gold resource Exploration drilling: in total of which Based on targeted 0.6-0.8 Moz resource in the ~ 50% in the S

  89. Slide 89: Tungsten & molybdenum on the Southern Gold Line

    Tungsten & molybdenum on the Southern Gold Line Kuittila has potential to become a significant supplier of tungsten (0.5–2.5% of the global supply) • Base of till samples indicate potential in a large area • Opportunity to strengthen access to European industrial partnerships and funding • Assessing

  90. Slide 90: Environmental surveys and project infrastructure

    Environmental surveys and project infrastructure Environmental surveys: • 2024: Environmental surveys carried out in the Southern project area • 2025: Vegetation and habitat surveys conducted in Pampalo and along the Southern Gold Line • 2026: Vegetation and habitat surveys to continue in new areas

  91. Slide 91: How to do it in practice?

    How to do it in practice?

  92. Slide 92: Taking care of waterways

    WATER BALANCE Taking care of waterways IN PRACTICE  We combine traditional technologies with digital water-balance and forecasting models, as well as nature-based treatment solutions such as constructed wetlands and bioreactors.  We aim for closed water circuits and reduce freshwater intake.

  93. Slide 93: Energy system with net-zero emissions

    ENERGY AND EMISSIONS Energy system with net-zero emissions IN PRACTICE  We electrify our mining processes and aim for net-zero emissions.  We aim to use waste heat and hybrid solutions, such as sand-battery technology for energy production and storage.  We develop our energy system with the relia

  94. Slide 94: Smart solutions for mining waste

    MATERIALS AND SIDE STREAMS Smart solutions for mining waste IN PRACTICE  We enhance mining efficiency through digital modelling and improve the recovery of minerals.  We aim to utilize waste rock and tailings in on-site and off-site applications.  We place materials safely into underground backfi

  95. Slide 95: Progressive rehabilitation

    BIODIVERSITY Progressive rehabilitation IN PRACTICE  Mine closure and rehabilitation measures are planned before the operations start.  Progressive rehabilitation supports biodiversity through earlier habitat restoration.  We work with local stakeholders to identify, protect, and restore the most

  96. Slide 96: Predictive monitoring and open communication

    CHEMICALS AND PROCESS SAFETY OPENNESS AND DATA Predictive monitoring and open communication IN PRACTICE  We minimize environmental impact by identifying critical risk points, enabling proactive monitoring and rapid response to any deviations.  We make key impacts visible in an accessible format.

  97. Slide 97: Stakeholder engagement and local vitality

    PEOPLE AND PLACE Stakeholder engagement and local vitality IN PRACTICE  We build a safe working environment that supports wellbeing and encourages development.  We meet people face-to-face and involve them in decision- making  The mine brings jobs, investment, infrastructure and skills that are p

  98. Slide 98: Thank you!

    Thank you!

  99. Slide 99: Gold and its value

    Gold and its value Petter Langenskiöld, Portfolio Manager, Evli 99

  100. Slide 100: Q&A

    ENDOMINES Q&A

  101. Slide 101: Closing remarks

    Closing remarks Kari Vyhtinen, CEO 101

  102. Slide 102: Outlook for 2026: Well positioned for growth

    Outlook for 2026: Well positioned for growth Gold Production Largest exploration Southern Gold Line expected to grow program in company development project We expect 10-20% growth in gold history to the next phase with production volumes. Exploration continues with the gold and tungsten Growth is su

  103. Slide 103: The regenerative mining model

    The regenerative mining model

  104. Slide 104: This marks the start of a new shared era, moving beyond mere compliance

    This marks the start of a new shared era, moving beyond mere compliance. Change happens together! This is the start of AliveMine.

  105. Slide 105: Thank you!

    Thank you!