Slide 1: McPhillamys Gold Project CCC Meeting
1 1 REGIS RESOURCES LTD McPhillamys Gold Project CCC Community Consultative Committee May 2019
Slide 2: Agenda
2 Agenda 2 1. Apologies 2. Declaration of Pecuniary or other interests 3. Business arising from previous minutes 4. Correspondence 5. McPhillamys Update 1. Project area 2. Water pipeline 6. Other agenda items 1. Presentation by Department of Planning & Environment 7. General Business 8. Next Meeting
Slide 3: McPhillamys Gold Project Project Update
3 3 REGIS RESOURCES LTD McPhillamys Gold Project Project Update May 2019
Slide 4: PEA Proposed Infrastructure
4 PEA Proposed Infrastructure 4
Slide 5: Evolution since PEA
5 Evolution since PEA 5
Slide 6: EIS Update
6 EIS Update 6 ➢Updated Site Layout ➢Groundwater and Surface Water ➢ Modelling results under peer review ➢Noise, Vibration, Air Quality and Visual ➢ Continuing with optimisations of the mining schedule and methodologies for building the Amenity Bund and stockpiles. ➢Ecology & Heritage ➢ Surveys comp
Slide 7: EIS Update (cont.)
7 EIS Update (cont.) 7 ➢Soils & Biophysical Strategic Agricultural Land (BSAL) ➢ Studies complete & reports under review ➢Traffic ➢ Studies complete and reports under review ➢TSF Design ➢ TSF design complete and undergoing peer review
Slide 8: McPhillamys TSF Design
# [1] The saprock has a bulk hyde + [2] The metazedients have 9 bulk hydraulh 2x = Diagram shows vertical exaze: ms biwerstacly veal Part = Tha TSF sow if craebaeneaciinieest pic vertical exaggeration ctvity in the order of 1x 20 tha AAresces Futersaticnn (Sapcx Kay actunl irtuanierne pterek > surfa
Slide 9: EIS Update (cont.)
9 EIS Update (cont.) 9 ➢Social & Economic ➢ Social impact assessment ongoing with final round of consultations underway at present ➢ Regis has been communicating with the affected residents ➢ Regis’ aim for the EIS is to be conservative with the modelling, so that impacts will generally be less than
Slide 10: EIS Update (cont.): Community Consultation
10 EIS Update (cont.) 10 ➢Community Consultation ➢ Face to Face meetings ➢ Stall at the Blayney show and Farmers markets ➢ Community Information Sheet #5 distributed ➢ Community open days 13th and 14th May ➢ Community meeting 23rd May ➢ Fortnightly updates & information in the Blayney Chronicle ➢ Di
Slide 11: Water Supply Pipeline
11 Water Supply Pipeline 11 ➢Pipeline corridor ➢ Close to finalisation ➢ Private land holder agreement ➢ Environmental study work complete, reports being prepared
Slide 12: Proposed Pipeline Route
12 Proposed Pipeline Route 12
Slide 13: Regulatory Approvals
13 Regulatory Approvals 13 ➢ Submission of PEA to DPE for issuing of EARs ( Complete ) ➢ Submission of EIS to DPE ( Target is June 2019 ) ➢ Review of EIS by various regulators ➢ Exhibition of EIS for minimum of 30 days ( Extended to 42 days ) ➢ Submissions Received ➢ IPC first hearing? ➢ Regis Respo
Slide 14: Economic Benefits
14 Economic Benifits 14 ➢ Employment ➢ >350 During Construction ➢ 300 During Operations ( Approximate for 10 years of ops ) ➢ Initial Capital Cost $215m +/- 25% ➢ Increase in mining land rates ➢ Voluntary Planning Agreement