Engro Powergen Qadirpur Ltd · PSX:EPQL

Engro Powergen Qadirpur — 1H 2026 Earnings Presentation

12 slides from Engro Powergen Qadirpur's earnings presentation, Aug 11, 2026

  1. Slide 1: Corporate Briefing 1H 2026

    Corporate Briefing 1H 2026 www.engro.com

  2. Slide 2: Important Disclaimer

    Analyst Briefing 1H 2026 Important Disclaimer This presentation has been prepared by Engro Powergen Qadirpur Limited (“EPQL”) solely for information purposes. No representation or warranty express or implied is made thereto, and no reliance should be placed on, the fairness, accuracy, sufficiency, c

  3. Slide 3: Agenda

    Analyst Briefing 1H 2026 Agenda 1 Sector Updates 2 Key Highlights – 1H 2026 3 Financial Performance 4 Key Business Risks 5 Way Forward 6 Q&A Session www.engro.com

  4. Slide 4: Sector Updates

    Analyst Briefing 1H 2026 Sector Updates GDP Growth Inflation Policy Rate Macro Update 3.70% 7.05% 11.5% in Jun 2026 In Jun 2026 in Jun 2026 3.18% SPLY 4.49% SPLY 11.0% SPLY Power Demand Circular Debt Power Sector Update 61.2 TWh PKR 1.7 Tn YTD Jun 26 In Jun 26 60.5 TWh SPLY PKR 1.6 Tn SPLY www.engro

  5. Slide 5: Key Developments – 1H 2026

    Analyst Briefing 1H 2026 Key Developments – 1H 2026 12.1 million work hours completed from Maintained high merit order Collection of 98% in 1H COD till 1H 2026 without a position on gas 2026 lost workday injury (LWI) Completed Scheduled EPQL Wins the British Safety Council EPQL Achieves Gold Outage

  6. Slide 6: Financial Performance 1H 2026

    Analyst Briefing 1H 2026 Financial Performance 1H 2026 Profit after Tax (PKR Mn) PKR 6,064 Mn Revenue 1,610 vs. SPLY PKR 5,258 Mn 1,221 PKR 1.07 / share Earnings per share 460 346 vs. SPLY PKR 1.42 / share 1H 2023 1H 2024 1H 2025 1H 2026 www.engro.com 6

  7. Slide 7: Operational highlights

    Analyst Briefing 1H 2026 Operational highlights Billable Availability Factor Net Electrical Output (GWh) Load Factor 496 100% 100% 100% 437 99% 53% 378 363 46% 41% 39% 1H 2023 1H 2024 1H 2025 1H 2026 1H 2023 1H 2024 1H 2025 1H 2026 1H 2023 1H 2024 1H 2025 1H 2026 www.engro.com 7

  8. Slide 8: Total Receivables Position

    Analyst Briefing 1H 2026 Total Receivables Position 10,586 9,003 7,496 6,098 3,301 PKR Mn 2,205 3,090 2,905 2,532 1,309 896 769 1H 2023 1H 2024 1H 2025 1H 2026 Overdue Not Due www.engro.com 8

  9. Slide 9: Key Business Risks

    Analyst Briefing 1H 2026 Key Business Risks Implications of non- approval Volatile Foreign Currency Adverse impact of increasing of Gas Depletion Mitigation Exchange and Economic Circular Debt Option Liquidity Risk Regulatory and Policy inconsistencies posing Inconsistent Dispatch on Merit Operation

  10. Slide 10: Way Forward - Alternate Fuel Options

    Analyst Briefing 1H 2026 Way Forward - Alternate Fuel Options The Company is actively pursuing additional fuel options to enhance gas supply volumes and the load factor. The available options are as follows: Kandhkot Gas Badar Gas Salam Gas These options, if all materializes, could potentially incre

  11. Slide 11: Thank you!

    Thank you!

  12. Slide 12: Q&A Session

    Session