Slide 1: Corporate Presentation
For personal use only Corporate Presentation Development Commenced First Cash Flows Early 2014 April 2013
Slide 2: Location and Business Strategy
Location and Business Strategy Alkane is a public company (listed on ASX since For personal use only 1969) 6,100 shareholders (85% Australian) Multi commodity exploration and development in the Central West of NSW Active in region for more than 20 years with strong community recognition and
Slide 3: Equity and Ownership
Equity and Ownership For personal use only Equity Ownership Shares – 372,539,000 Hedge Funds, Domestic Options – 4,000,000 5% Institutions, 20% Market Capitalisation – A$200M Retail and Foreign others, 34% Institutions, Cash – A$65M (31 March 2013) 14% Directors and Investments - ~A$75M (R
Slide 4: Board & Management
Board & Management For personal use only Board Senior Management John Stuart Ferguson Dunlop (Chairman). BE(Min), MEngSc(Min). Mining engineer with 40 years surface and Karen Brown (Joint Company Secretary) BEc underground mining experience in Australia and overseas. Lindsay Colless (Joint Com
Slide 5: DZP Location and Infrastructure
DZP Location and Infrastructure For personal use only Infrastructure Population – 80,000 Dubbo region Rail – railway hub Road – major highways intersection/hub Water – numerous sources 10km Electricity – NSW State power grid 25km Gas – NSW State gas grid 30km Industrial – substantial l
Slide 6: DZP Resources and Reserves
DZP Resources and Reserves For personal use only Resources & Reserves Resources & Reserves – open at depth. Additional resource potential at nearby Railway deposit Reserve Life – 36 years; Resources + 70 years Major world resource - zirconium, hafnium, niobium, tantalum, yttrium & rare earth e
Slide 7: DZP Process Flow Sheet
DZP Process Flow Sheet For personal use only Demonstration Pilot Plant – established 2008 ANSTO – Aust. Nuclear Science & Tech. Org. Process – unique & advanced Optimization – ongoing Sulphuric acid leach whole of ore Solvent extraction, separation & refining Chemical precipitation Z
Slide 8: Demonstration Pilot Plant
Demonstration Pilot Plant For personal use only Y and HREE refiningand recovery DPP Filtration, PLS, SX, Zr and Nb recovery Zirconium refiningand precipitation Reverse osmosis and water recycle Operating at ANSTO since 2008 8
Slide 9: Environmental Impact
Environmental Impact For personal use only Environmental Impact Statement – key areas of focus Existing land use (agriculture) Socio-economic Air quality Noise and vibration Surface and ground water Soil stability Flora and fauna Biodiversity Visibility Rail freight movements R
Slide 10: DZP Marketing
DZP Marketing For personal use only Off-take Memorandums of Understandings (MOU’s) / Agreements MOU Product Details 1 Zirconium Leading Chemical Company to develop applications for zirconia produced by DZP 2 Zirconium Australian Mintech Chemical Industries to produce zirconium oxychloride 3 Zirconiu
Slide 11: DZP Product Output
DZP Product Output For personal use only 100% 4% 911t $149.4M 90% 18% 3,997t 30% 80% 9% 1,967t 70% $118.7M 60% 24% 50% 15,827t 40% $81.5M 16% 70% 30% 20% $153.9M 31% 10% 0% Production 22,702T Revenue A$503.5M ZrO2 Nb metal LREO concentrate HREO concentrate 11
Slide 12: DZP Feasibility Study
DZP Feasibility Study For personal use only DUBBO ZIRCONIA PROJECT Financial Summary for 20 year life in A$ Project Capacity 1,000,000 tonnes pa Capex – Plant $396.8M Sulphuric Acid Plant $116.6M Infrastructure + Owners $253.4M SUB TOTAL $766.8M EPCM $63.5M Contingency (20%) $166.1M TOTAL $996.4M An
Slide 13: DZP Plant Layout
DZP Plant Layout For personal use only Roasting and leaching Solvent extraction Crushing and grinding Zirconium and niobium recovery and refining Rare earth recovery and refining Sulphuric acid plant Office and workshops 13
Slide 14: DZP Financing Program
DZP Financing Program For personal use only Credit Suisse (Australia) Limited (“CS”), Sumitomo Mitsui Banking Corporation (“SMBC”) and Petra Capital Pty Limited (“Petra”) to provide investment banking services, including the arrangement of project financing to fund the development of the Dubbo Zirco
Slide 15: DZP Development pathway
DZP Development pathway 2009 2010 2011 2012 2013 2014 2015 2016 For personal use only Resource definition 2001 - 2002 Flow sheet development 2002 Laboratory Zr – Nb 1999 –2002 Pilot plant Zr – Nb 2002 Continued product Mine Plan & Scheduling 2002 development Plant Design & Engineering 2002
Slide 16: TGP Summary
TGP Summary Current Project Activities For personal use only Project approval by NSW Department of Planning and Infrastructure late July 2012. Mining Lease approved February 2013 Resource – 12.6 Mt @ 2.0g/t (812,000oz) CAPEX – A$107M Throughput – 1.0Mtpa Head Grade – 2.00g/t Recoveries –
Slide 17: TGP Geology
TGP Geology Geological Summary – Wyoming / Caloma For personal use only Pelitic Sediments Feldspar porphyry Volcaniclastic sediments Graphitic mudstone Volcaniclastic conglomerate Epidote altered volcanics Chlorite-talc schist Andesitic volcanics Mineralisation Additional Resource Potential Caloma u
Slide 18: Outlook
Outlook For personal use only Dubbo Zirconia Project (DZP): Global Strategic Significance – a long term, significant project in the zirconium and heavy rare earth industries, which can generate substantial cash flows at around ~A$250Mpa Production costs – spread across the four metal outputs which
Slide 19: Disclaimer
Disclaimer For personal use only Disclaimer This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth o
Slide 20: Resource & Reserves: Dubbo + Galwadgere
Resource & Reserves: Dubbo + Galwadgere Dubbo Zirconia Project – Mineral Resources For personal use only Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO U3O8 Deposit (Mt) (%) (%) (%) (%) (%) (%) (%) Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 0.014 Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 0.014 T
Slide 21: Resource & Reserves: Tomingley + Peak Hill
Resource & Reserves: Tomingley + Peak Hill Tomingley (TGP) – Mineral Resources For personal use only DEPOSIT MEASURED INDICATED INFERRED TOTAL Top Cut Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Gold 2.5x2.5x5.0m model (t) (g/t) (t) (g/t) (t) (g/t) (t) (g/t) (koz) Wyoming One 2,316,550 2