Athabasca Minerals Inc

Athabasca Minerals — Investor Presentation (September 2014)

33 slides from Athabasca Minerals's investor presentation, September 2014

  1. Slide 1: Corporate Presentation September 2014

    CORPORATE PRESENTATION SEPTEMBER 2014 www.athabascaminerals.com TSX Venture: ABM

  2. Slide 2: Disclaimer

    Disclaimer: 2 Information relating to the financial condition and results of operations for Athabasca Minerals Inc. (“ABM” or the “Corporation”) should be read in conjunction with the Corporation’s annual and interim financial statements and the related notes to the Financial Statements and Manageme

  3. Slide 3: Aggregates Supplier to the Canadian Oil and Gas Industry

    Athabasca Minerals Inc. – Aggregates Supplier to the Canadian Oil and Gas Industry: 3  Formed in 2006, Edmonton-based Athabasca Minerals was formed to capitalize on the enormous growth of the oil sand industry and infrastructure industries in Alberta, and their need for industrial minerals.  As a

  4. Slide 4: Corporate Information

    Corporate Information: (as of August 29, 2014) 4 Symbol / Listing: ABM / TSX Venture Shares Issued: 33,068,850 Options Outstanding: 3,192,931 Warrants: 1,575,258 Fully Diluted: 37,837,039 Share Price: $2.60 Market Capitalization: $86 Million Insider Ownership: approx. 25% Dom Kriangkum, CEO & Pres.

  5. Slide 5: Management

    Management: 5 Udomdej (Dom) Kriangkum, P.Eng - President, CEO, Director  Over 35 years of experience in the construction industry in Alberta, including road construction, civil project estimating, project management, gravel prospecting and engineering consulting. Don Hruba, MBA, CA, CMA - Chief Fin

  6. Slide 6: Directors

    Directors: 6 Peter Elzinga, ICD.D, Chairman and Director  Mr. Elzinga is a member of the Institute of Corporate Directors and currently sits on the Board of Servus Credit Union and The Peter Elzinga Family Foundation. In addition, Mr. Elzinga is President of Elicia Holdings Ltd. and Chairman of the

  7. Slide 7: Oilsands Production

    Oilsands Production: 7 Year Source: Canadian Association of Petroleum Producers  Oil Sands production was projected to increase from 1.9 million barrels per day in 2012 to 4.8 million barrels per day in 2030 TSX.V: ABM

  8. Slide 8: Oil Sands Aggregates Demands Analysis

    Oil Sands Aggregates Demands Analysis: 8 Oil Sands — Aggregate Demand Analysis Oil Sands Aggregate Dem and Analysis Aggregate Annual Total Aggregate Status Type of Project # of Projects Tonnes/project (m m ) Tonnes/annum (m m ) Operational Mining 9 1 9.0 Operational SAGD * 19 0.5 9.5 Total Maintenan

  9. Slide 9: Aggregate Operations

    Aggregate Operations: 9 Athabasca manages the Susan Lake Aggregate Operation on behalf of the Government of Alberta under a current 10 year agreement  First agreement signed in 1997; renewed in 2007 – currently in Year 7 (expiring November 30, 2017)  Susan Lake is the largest open pit Aggregate Op

  10. Slide 10: Aggregate Operations – Location

    Aggregate Operations – Location: 10 Susan Lake Gravel Pit Kearl Gravel Pit Pit 248 House River Gravel Pit Conklin Stockpile Site Logan Gravel Pit TSX.V: ABM

  11. Slide 11: Government Public Pit: Susan Lake Gravel Pit

    Government Public Pit: Susan Lake Gravel Pit 11 Suncor’s Fort Hills  One of the largest gravel pits in Canada Mine  Through 2013, over 85 million tonnes of sand and gravel were sold from this pit since 1998  The pit overlap with three major oil sands projects operated by Suncor, Syncrude, and She

  12. Slide 12: Corporate Owned Pit: Sand and Gravel Pits

    Corporate Owned Pit: Sand and Gravel Pits 12 TSX.V: ABM

  13. Slide 13: Financial Highlights

    Financial Highlights: 13  Five consecutive years of revenue growth  Corporate owned pits generated revenue of $14,698,719 in 2013 versus $3,040,328 in 2012  Susan Lake management contract revenue generated $10,419,281 during the most recent fiscal year Nov 2009 Nov 2010 Nov 2011 Nov 2012 Nov 2013

  14. Slide 14: Public vs Corp Owned Pits

    Public vs Corp Owned Pits: 14 Public Gravel Pits Corporate-Owned Pits FISCAL 2013 FISCAL 2012 % Change FISCAL 2013 FISCAL 2012 % Change Q1 Tonnes Sold 1,329,430 1,768,326 (24.8) 186,794 198,653 (6.0) Revenue $1,489,017 $2,022,509 (26.4) $5,194,379 $1,607,110 223.2 Q2 Tonnes Sold 2,200,426 2,475,056

  15. Slide 15: Crushed Stone Quarry: Richardson Dolomite and Granite Property

    Crushed - Stone Quarry: Richardson Dolomite and Granite Property 15  Proposed a new development of a dolomite and granite quarry  The property is approximately 60,000 hectares in size Richardson Quarry  Management estimates that the property contains several billion tonnes of dolomite and granite

  16. Slide 16: Firebag Silica Sand Project

    Firebag Silica Sand Project: 16  Approximately 100 km north of Fort McMurray where Highway 63 Firebag Pit ends  Approximately 130 km to CN rail facility in Lynton, east of Fort McMurray Lynton Access road showing exposed sands TSX.V: ABM

  17. Slide 17: Firebag Silica Sand Project

    Firebag Silica Sand Project: 17  500 acre proposed project size  Silica sand exposed at surface Access road showing exposed sands TSX.V: ABM

  18. Slide 18: Firebag Silica Sand Project

    Firebag Silica Sand Project: 18 Access road showing exposed sands TSX.V: ABM

  19. Slide 19: Firebag Silica Sand Project: Canadian Shale Plays

    Firebag Silica Sand Project: Canadian Shale Plays 19 Edson processing Facility Access road showing exposed sands  Located in proximity to major oil and gas plays in Alberta, BC and Saskatchewan TSX.V: ABM

  20. Slide 20: Market Advantage: Distance

    Market Advantage: Distance 20  Transportation is critical in the economic equation of a successful frac sand operation.  When Athabasca’s deposit is compared in distance to other key suppliers, it is closer to key markets than other current suppliers. Medicine Hat Edson Grande Prairie (Cardium) (M

  21. Slide 21: Lynton to Edson: Proposed Trans-loading and Processing Facilities

    Lynton to Edson : Proposed Trans-loading and Processing Facilities 21  Rail silica sand from Lynton to Edson  Process frac sand in Edson area  Customers within 150 kms can pick up frac sand at the processing plant Opportunity to rail products to Grande Prairie and northeastern B.C. Lynton Propos

  22. Slide 22: Rail Facility: Lynton

    Rail Facility: Lynton 22  Lease application submitted for Provincial approval on a 180 acres (72 Ha) site next to an existing CN rail facility in Fort McMurray  Site development anticipated to commence during 2015 Lynton TSX.V: ABM

  23. Slide 23: Rail Facility: Lynton

    Rail Facility: Lynton 23 TSX.V: ABM

  24. Slide 24: Lynton: Rail Facilities

    Lynton: Rail Facilities 24  Transloading facility for gravel and silica sand TSX.V: ABM

  25. Slide 25: Proposed Processing Plants Design

    Proposed Processing Plants Design: 25  Initial frac sand wet plant and dry plant design with drying and screening plant 3D rendering TSX.V: ABM

  26. Slide 26: Proppant Demand Forecast

    Proppant Demand Forecast: 26 Proppant demand CAGR (bn pounds) 2007 2012 2017E 2007-'12 2012-'17E North Am erica 13.96 59.10 102.40 33% 12% By country: US 12.27 53.26 89.95 34% 11% Canada 1.69 5.84 12.45 28% 16% By type: Sand 12.28 53.55 93.90 34% 12% Ceramic 1.64 5.27 8.04 26% 9% Other 0.05 0.28 0.4

  27. Slide 27: Total Proppant Used per Year in Canada

    Total Proppant Used per Year in Canada: 27 Tonnes Year Source: FracKnowledge TSX.V: ABM

  28. Slide 28: Proppant Material Type Used in Canada

    Proppant Material Type Used in Canada: 28 Tonnes Year Source: FracKnowledge TSX.V: ABM

  29. Slide 29: Basic Frac Sand Properties

    Basic Frac Sand Properties: 29 Athabasca Crush Athabasca Crush K- Value as tested K- Value as tested Com m on Com m on Shape (Roundness & by StimLab by PropTester Tier Designation Predom onant Characteristics Form ation Sphericity) Crush K-value (July 10, 2014) (July 10, 2014) Tier 1 Prem ium Sand N

  30. Slide 30: Firebag Silica – Independent Test Results

    Firebag Silica – Independent Test Results: 30 ATHABASCA SILICA PROPPANT TEST DATA ATHABASCA SILICA PROPPANT TEST DATA Group1(0-10’)-MZ1,MZ10,MZ12,MZ14,F16 Group1(0-10’)-MZ1,MZ10,MZ12,MZ14,F16 PropTester and Stim Lab PropTester and Stim Lab July 10, 2014 July 10, 2014 TEST PropTester Inc. - 20/40 Sti

  31. Slide 31: Firebag Silica Project – Timeline

    Firebag Silica project – Timeline: 31  February 2014: Alberta Environment and Sustainable Resources Development (ESRD) has completed its review of Athabasca's silica sand surface material lease application  August 26, 2014: Conservation and Reclamation Business Plan (CRBP) approved by ESRD Firebag

  32. Slide 32: Firebag Silica – Sand Images

    Firebag Silica – Sand Images: 32 Sand Images-40 mesh 10x Sand Image- 40 mesh 40x Sand Image- 70 mesh 10x Sand Image- 70 mesh 40x TSX.V: ABM

  33. Slide 33: Contact

    Contact: 33 Athabasca Minerals Inc. 9524 - 27 Avenue Edmonton, Alberta Canada, T6N 1B2 T: + 1 780 465 5696 E : info@athabascaminerals.com www.athabascaminerals.com TSX.V: ABM

Athabasca Minerals — Investor Presentation (September 2014) on 6ix