Lundin Mining Corporation · TSX:LUN

Lundin Mining — FY2013 Earnings Presentation

22 slides from Lundin Mining's earnings presentation, Feb 21, 2014

  1. Slide 1: 2013 Results

    TSX: LUN OMX: LUMI 2013 Results February 21, 2014

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Information This presentation contains forward-looking information, including, but not limited to, guidance on estimated annual production and cash costs. This forward-looking information is not based on historical facts, but rather on current

  3. Slide 3: Presenter and Questions

    Presenter PAUL CONIBEAR PRESIDENT & CEO Questions MARIE INKSTER SR. VP & CFO PAUL MCRAE SR. VP PROJECTS STEVE GATLEY VP TECHNICAL SERVICES 3

  4. Slide 4: 2013 Operational Highlights - A Strong Performance

    2013 Operational Highlights - A Strong Performance Copper & Nickel Above High End of Guidance, While Zinc & Lead In-Line: Copper: Higher throughput at Neves lead to better than expected production Actual Cu production of 117kt (vs. guidance range of 109kt – 115kt) Zinc: Despite Zinkgruvan issues in

  5. Slide 5: Full Year 2013 & Q4/13 Financial Highlights

    Full Year 2013 & Q4/13 Financial Highlights Revenues: 2013: $728m; Q4/13: $187m Net Income: 2013: $137m ($0.23 p/s); Q4/13: $42m ($0.07 p/s) Operating CF: 2013: $154m ($0.26 p/s); Q4/13: $54m ($0.09 p/s) Cash Returns from Tenke : $142m for 2013 ($31m for Q4/13) exceeding guidance provided at the beg

  6. Slide 6: Normalized Earnings

    Normalized Earnings Fourth quarter Full Year $ Millions 2013 2012 2013 2012 Reported Net Earnings 42.1 (17.1) 136.7 123.2 Foreign exchange 6.0 3.5 13.8 5.1 Mark to market on securities 2.9 0.8 9.4 2.3 Insurance proceeds - (7.9) (15.1) (7.9) Inventory write-down - 9.1 - 9.1 Tax (on above items) 2.0 (

  7. Slide 7: Change in Production: 2013 vs. 2012

    Change in Production: 2013 vs. 2012 Tonnes Tonnes 3,065 2,020 38,464 3,982 2,558 67,000 66,246 39,000 66,000 2,659 38,000 65,000 63,878 Copper 37,000 Lead 1,369 64,000 36,000 34,370 63,000 167 35,000 62,000 Excluding Tenke 50,346 t 34,000 61,000 attributable share 60,000 33,000 59,000 32,000 Prior Y

  8. Slide 8: Operating Earnings – 2013 vs. 2012

    Operating Earnings – 2013 vs. 2012 8

  9. Slide 9: Cash Costs – 2013 vs. 2012

    Cash Costs – 2013 vs. 2012 1 By-product is after related TC/RC. 2. 2012 net costs were measured over the re-start and ramp-up of operations and were not representative of steady state operating conditions. 9

  10. Slide 10: 2013 Results & 2014 Guidance

    2013 Results & 2014 Guidance 2013 Results 2014 Guidance Tonnes C1 Cost Tonnes C1 Cost a Copper Neves-Corvo 56,544 $1.90 50,000 – 55,000 $1.90 Zinkgruvan 3,460 3,000 – 4,000 Aguablanca 6,242 5,000 – 6,000 Eagle - 2,000 – 3,000 Wholly-owned 66,246 60,000 – 68,000 Tenke (@ 24%)b 50,346 $1.21 48,400 $1.

  11. Slide 11: Operations and Outlook

    Operations and Outlook 11

  12. Slide 12: Neves-Corvo – 2013 Results

    Neves-Corvo – 2013 Results • Production of 56.5kt copper and an annual record of 53.4kt zinc • C1 costs of $1.90/lb Cu in-line with latest guidance • Average copper grades of 2.6% with recovery rate of 84.5% • Copper production exceeded guidance for the year due to higher than expected throughput, o

  13. Slide 13: Neves-Corvo – Outlook

    Neves-Corvo – Outlook • Copper production and costs consistent with 2013 • Zinc ore mining rates will continue to increase from bulk stopes in upper Lombador resulting in an increased zinc production profile • Initiatives progressing for exploiting the deeper Lombador zinc and copper ores • Potentia

  14. Slide 14: Zinkgruvan – 2013 Results

    Zinkgruvan – 2013 Results • Production of 71.4kt zinc, 32.9kt lead and 3.5kt copper; in-line with guidance • C1 costs of $0.32/lb Zn was mostly in-line with latest guidance of $0.30/lb Zn • Paste fill and local ground control issues early in the year impacted annual production • Significant improvem

  15. Slide 15: Zinkgruvan – Outlook

    Zinkgruvan – Outlook • Production and costs generally in line with 2013 • Overall production profile expected to remain steady going forward • Progressive investments continue to be made in the paste backfilling system to improve system availability and flexibility 15

  16. Slide 16: Aguablanca – 2013 Results and Outlook

    Aguablanca – 2013 Results and Outlook • Production of 7.6kt nickel and 6.2kt copper; above revised guidance • C1 costs of $3.78/lb Ni was better than guidance of $4.50/lb Ni • Consistent production throughout the year resulted in throughput, nickel and copper grades & recoveries all being higher tha

  17. Slide 17: Tenke – 2013 Results

    Tenke – 2013 Results • 2013 production (100% basis) of 210kt Cu at $1.21/lb Cu; above name-plate capacity • Achieved record mining, milling and copper production rates during the year • Cash distributions of $142 million for the year • Power availability improved during Q4 and Tenke continues to wor

  18. Slide 18: Tenke Outlook

    Tenke Outlook Significant Cash Returns Expected to Continue in 2014 • Further expansion investment timing under review by operator Freeport • Cash distributions of $130- $150 million expected in 2014 • Addition of second sulphuric acid plant expected to be complete in 2016 18

  19. Slide 19: Eagle – Status Update

    Eagle – Status Update • Overall construction continues on-time and on-budget • Construction approximately 70% completed • Mine surface facilities to be commissioned in Q2/2014 • Mill commissioning and first concentrate sales expected in Q4/2014 19

  20. Slide 20: Eagle – Construction Progress Going Well

    Eagle – Construction Progress Going Well Mill site facilities Concentrator Progress Mine Portal Concentrator Progress 20

  21. Slide 21: Lundin Mining - Summary

    Lundin Mining - Summary Portfolio of high quality, long-life mines that are performing well Optimization opportunities and exploration potential at all existing assets No high risk major capital projects Proven disciplined growth approach Geographic and base metal diversification Neves-Corvo Zinkgru

  22. Slide 22: Questions & Answers

    TSX: LUN OMX: LUMI Questions & Answers

Lundin Mining — FY2013 Earnings Presentation on 6ix