Rocky Shore Gold Limited · CSE:RSG

Rocky Shore Gold — Investor Presentation (August 2025)

18 slides from Rocky Shore Gold's investor presentation, August 2025

  1. Slide 1: Emerging Gold District in Central Newfoundland

    INVESTOR PRESENTATION August 2025 EMERGING GOLD DISTRICT IN CENTRAL NEWFOUNDLAND EXPLORE | DISCOVER | GROW | MONETIZE

  2. Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER Public Data This presentation also contains or references certain industry data which is based upon information from independent industry publications, market research, analyst reports and surveys and other publicly available sources. Although the Company believes these sources to b

  3. Slide 3: Rocky Shore Gold

    ROCKY SHORE GOLD In-situ Visible Gold in Quartz-rich Quartz-rich Visible Gold Boulder Davidsville Metasediments Mission – to discover the next major gold deposit in an emerging gold district within central Newfoundland, Canada Emerging Gold District – significant structural/geological setting hostin

  4. Slide 4: Corporate Highlights

    CORPORATE HIGHLIGHTS A DISTRICT SCALE OPPORTUNITY Gold Anchor Project spans +1200 km2, second largest claim holder trending for over 70 km A TIER 1 JURISDICTION(FRASER INSTITUTE) Top 10 in the world for mining and exploration EXCELLENT INFRASTRUCTURE Highway and major power line Rocky FREE PROJECT O

  5. Slide 5: Newfoundland - A Gold Rich Destination

    NEWFOUNDLAND - A GOLD RICH DESTINATION CENTRAL NEWFOUNDLAND: SIGNIFICANT GOLD Rocky Shore – Gold Anchor Project: Lane Pond Gold Target New Found Gold – Initial Resource established 1 Moosehead Project Golden Baie Project 2 5 7 4 Advanced Gold Deposits 1 3 Cape Ray Deposit 1 Valentine Lake Deposit: P

  6. Slide 6: Gold Anchor: Moving Towards Drill Discovery

    GOLD ANCHOR: Moving Towards Drill Discovery Explore to Identify Gold Targets: Discovered Gold Targets within Advancing to Drill Discovery at Soil and Till Sampling Project Area the Lane Pond Gold Target 2025 2024 2024-25 WWW.HEMLOEXPLORERS.CA WWW.ROCKYSHOREGOLD.COM CSE: RSG | 6

  7. Slide 7: Central Gold District

    CENTRAL GOLD DISTRICT MAJOR FAULTS AND GOLD TARGETS Emerging Gold District • Four major gold bearing faults identified to date: Appleton, JBP, North and South Faults • Appleton and JBP Faults: high grade gold discoveries and open pit resources to 200m vertical. Open pits are open in all directions •

  8. Slide 8: Central Gold District

    CENTRAL GOLD DISTRICT GEOLOGY, FAULTS AND GOLD TARGETS • District geology: Davidsville Group metasediments: sandstone, siltstone, slate • District gold bearing faults: Appleton and JBP Faults • Geology and faults: Fault/geological corridor host to widespread gold bearing environment • Gold mineraliz

  9. Slide 9: Gold Anchor: Faults and Gold Targets

    GOLD ANCHOR: FAULTS AND GOLD TARGETS QUEENSWAY PROJECT • Gold Anchor: Two Major Gold Bearing Faults Identified at Gold Anchor: Appleton and JBP Faults. No historical drilling completed • Appleton Fault: minimum 20 to +50 km trend length through Gold Anchor • JBP Fault: minimum 65 km trend length thr

  10. Slide 10: Gold Anchor: Geology, Faults & Gold Targets

    GOLD ANCHOR: GEOLOGY, FAULTS & GOLD TARGETS GOLD BEARING GEOLOGICAL AND STRUCTURAL ADDRESS QUEENSWAY PROJECT • Favorable geology: Davidsville Group metasediments trend from Queensway through Gold Anchor • Favorable structure: Appleton, JBP, North and South Faults trend from Queensway through Gold An

  11. Slide 11: Gold Anchor-Lane Pond Gold Target

    GOLD ANCHOR-LANE POND GOLD TARGET LANE POND GOLD TARGET • Hosted along the Appleton Fault Corridor • 11 km long trend • Associated with significant VTEM anamolies • Widespread gold values up to 8.7 g/t gold associated with the Appleton Fault • Only north half of Lane Pond has been explored • Never d

  12. Slide 12: Gold Anchor Project

    GOLD ANCHOR PROJECT KEY PROJECT TAKEAWAYS MOVING FORWARD-SUMMER/FALL 2025 • Emerging Gold District: in a tier 1 jurisdiction • Lane Pond Gold Target: Complete surface IP geophysics, prospecting, soil/till sampling, diamond drilling • District-Scale Potential: +1,200 km2 with a 70 km property trend •

  13. Slide 13: Capital Structure (as of July 2025)

    CAPITAL STRUCTURE (as of July 2025) Shareholder Breakdown Shares Issued & Outstanding 143,077,564 Options: avg. price @ $0.25 to 2030 4,650,000 DSUs 4,600,000 Northfield Capital Corp. 21.6% Other Warrants: avg. price @ $0.10 to 2027 28,447,000 32.6% Fully Diluted 180,774,564 Board & Management 12.1%

  14. Slide 14: Appendix

    APPENDIX WWW.HEMLOEXPLORERS.CA 08 WWW.ROCKYSHOREGOLD.COM CSE: RSG | 14

  15. Slide 15: Management & Board of Directors

    MANAGEMENT & BOARD OF DIRECTORS Brian Howlett, CPA | Chairman, Director Ken Lapierre, P.Geo. | President & CEO, Director +30 years of senior management +40 years as Exploration and Mine Geologist experience, Chairman of Bitfarms Ltd., and Financier. Founder, President and CEO former CEO of Dundee Su

  16. Slide 16: Management & Board of Directors

    MANAGEMENT & BOARD OF DIRECTORS Chris Hodgson | Director Ernie Eves | Director Former President of the Former Premier of Ontario and Finance Ontario Mining Association, Minister. former Ontario Minister of Mines. Michael Leskovec, CPA, CA | Director Chris Stackhouse, CPA, CA | Director CFO of Northf

  17. Slide 17: Project Advancement Timeline/Highlights

    PROJECT ADVANCEMENT TIMELINE/HIGHLIGHTS • Exploration studies and recent NL Government airborne surveys confirmed southwest trend of gold bearing • Large Lane Pond Gold Target discovered faults from NFG’s Queensway Project • Summer/Fall Program: prospecting, geophysics, inaugural • Gold Anchor Proje

  18. Slide 18: Contact Us

    CONTACT US 301-141 Adelaide St. West, Toronto, ON M5H 3L5 Rocky Shore Gold Ltd. Ken Lapierre, President & CEO, Director +1 (647) 678-3879 ken@rockyshoregold.com @rockyshoregold CHF Capital Markets Cathy Hume, CEO +1 (416) 868-1079 x 251 cathy@chfir.com EXPLORE | DISCOVER | GROW | MONETIZE @RockyShor

Rocky Shore Gold — Investor Presentation (August 2025) on 6ix