Chalice Gold Mines — Investor Presentation (April 2010)
24 slides from Chalice Gold Mines's investor presentation, April 2010
Slide 1: Poised for Production in East Africa – Corporate Presentation
ASX: CHN “Poised for Production in East Africa ” Corporate Presentation April 2010 www.chalicegold.com
Slide 2: Disclaimer & Competent Person's Statement
Disclaimer & Competent Person’s Statement • This presentation may contain value references and "forward looking statements“ which are subject to various risks and uncertainties that could cause actual results and future events to differ materially from those expressed or implied by such statements.
Slide 3: Chalice Snapshot
Chalice Snapshot • Dynamic international gold company • Listed on ASX (Ticker: CHN), TSX listing planned 2H 2010 • 80%-owned Zara Project, Eritrea • option to purchase remaining 20%* • Feasibility Study nearing completion on high-grade Koka deposit • JORC Resource 944,000oz @ 5.8g/t Au • Initial pro
Slide 4: Corporate Snapshot
Corporate Snapshot • Shares on issue 157.4M 6 month share price • Options on Issue 13.075M • Cash (Mar’10) ~A$10M Board • Tim Goyder (Executive Chairman) • Dr Doug Jones (Managing Director) • Mike Griffiths (Executive Director) • Anthony Kiernan (Non-Executive Director) Substantial Shareholders • Ti
Slide 5: Zara Project Location
Zara Project Location • Emerging gold & base metal province • Gold endowment +20Moz – numerous deposits and mines dating back to ancient times • Minimal modern exploration • New world-class projects being developed: • 13Moz Sukari Gold Mine (Egypt) – in production (Centamin) • Bisha Gold & Base Meta
Slide 6: Zara – Project Location
Zara – Project Location Granted permits Applications 6
Slide 7: Koka Gold Deposit
Koka Gold Deposit • JORC compliant resource of 5.04Mt @ 5.8 g/t Au for 944,000oz • Based on results from 109 diamond drill holes (~18,000m drilled) • 600m strike length, 20-30m wide and open at depth • Only drilled to 250m below surface • Bulk of resource shallower than 150m depth Category Lower Ton
Slide 8: Koka Gold Deposit – Metallurgy
Koka Gold Deposit – Metallurgy • Metallurgical testwork completed at AMMTEC Perth • Laboratory master composite prepared from 104 intervals representative of deposit • Initial testwork indicates ore is metallurgically benign: • ~60% of gold recoverable by gravity • Overall recoveries 95-97% for grin
Slide 9: 2009 Scoping Study – Key Parameters
2009 Scoping Study – Key Parameters Average gold production ~110,000 oz per annum Life of mine ~ 6 years Total capital costs US$97.8 million Total cash costs US$424 per oz Total gold mined 712,000 oz Gold recoveries 95% Gold produced 677,000 oz Plant capacity 500,000 tpa Mining costs US$241 per oz P
Slide 10: Opportunities to Enhance Economics
Opportunities to Enhance Economics • Potential to decrease pit wall angle: • Reduce strip ratio • Reduce operating costs Koka • Potential to increase East overall resource: • Koka East – currently drilling • Koka South – commences April/May 2010 • Optimize Scoping Study 10
Slide 11: Koka Gold Deposit – Looking North
Koka Gold Deposit – Looking North Mineralised Zone 11
Slide 12: Koka Gold Deposit – Mineralisation
Koka Gold Deposit – Mineralisation • Quartz-carbonate-sulphide stockwork veins cutting microgranite • similar in style to mineralisation at Sukari Project, Egypt • Visible gold & high gold values associated with sulphides in quartz- carbonate veins • Sulphides overall <2% – no impact on metallurgy:
Slide 13: Koka Gold Deposit – 3D Model
Koka Gold Deposit – 3D Model 13
Slide 14: Koka Gold Deposit – Cross Sections
Koka Gold Deposit – Cross Sections Sediments Microgranite & Sediments Mafic Volcanics & Mafic Volcanics Microgranite Mylonite & Felsics Mylonite & Felsics 14
Slide 15: Koka Gold Deposit – In-fill Drilling
Koka Gold Deposit – In-fill Drilling • 30 diamond holes (~5,000m) completed, results include: • 6m @ 12.4g/t Au • 5m @ 21.9g/t Au • 10m @ 9.9g/t Au • 4m @ 32.8g/t Au • Results generally consistent with previous drilling: • Geometry of ore zone now confirmed in greater detail • Better understanding o
Slide 16: Development Program
Development Program • Lycopodium to complete Feasibility Study by mid-2010: • 5,000m of diamond drilling to upgrade resource completed • Hydrological drilling – initial holes indicate adequate water supply – borefield being drilled • Metallurgical test work complete • Geotech drilling completed • So
Slide 17: Zara Project – Exploration Potential
Zara Project – Exploration Potential • Expanded regional exploration programs underway • Major regional structural corridor controls gold occurrences • Granted tenements cover 50km strike on this corridor (~600km²) • Numerous prospects identified from artisanal gold workings • Koka Deposit has been
Slide 18: Koka Exploration – Near-Mine
Koka Exploration – Near-Mine • Other targets identified in immediate vicinity include: • Koka South Extension – IP resistivity anomaly • Koka East – artisanal workings on high-grade quartz veins 18
Slide 19: Koka East
Koka East • Hangingwall of Koka Main Zone • Artisanal workings and prospecting pits over 500m strike • Koka-style alteration and quartz stockwork mineralisation in microgranite • Outcrops over 50m width with rock chip samples up to 18g/t • Very little sampling to date • First-pass drilling underway
Slide 20: Koka South
Koka South • Strong IP resistivity anomaly identified 500m to the south of Koka • Ground follow-up confirmed zone of silica-sericite altered microgranite • Limited drilling confirmed Koka- 1m@2.2 style mineralization – up to 92g/t 1m@92 1m@12.5 over 1m • Potential ‘blind’ system open downplunge to s
Slide 21: Landsat Interpretation
Landsat Interpretation • Study covered ~38,000km² • ~60 new targets identified within 615km² CHN tenement block • Both gold (Koka-type) & VHMS (Bisha-type) base metal targets identified • Field work has already validated some of the targets on the ground • Regional structural interpretation underway
Slide 22: Eritrea Overview
Eritrea Overview • Stable operating and social environment • Proactive Government stance on mining developments – “open for business” • Modern Mining Code • Increasing foreign exploration & mining investment – 13 groups now active in country 22
Slide 23: Summary
Summary • Koka Gold Deposit: • Advanced high grade gold deposit • Strong economics • Low technical risk • Feasibility Study due mid-2010 • Aggressive exploration programs underway to expand resource base • Strategic ground position in emerging gold & base metal province • Experienced Board and Manag
Slide 24: Poised for Production in East Africa – Corporate Presentation
ASX: CHN “Poised for Production in East Africa ” Corporate Presentation April 2010 www.chalicegold.com
Chalice Gold Mines — Investor Presentation (April 2010) on 6ix