Titagarh Rail Systems Ltd · NSE:TITAGARH

Titagarh Rail Systems — Q1 FY2025 Earnings Presentation

30 slides from Titagarh Rail Systems's earnings presentation, Jul 30, 2024

  1. Slide 1: Regulation 30 announcement letter to exchanges

    30th July, 2024 BSE Limited (BSE) National Stock Exchange of India Limited (NSE) The Department of Corporate Services The Listing Compliance Department Phiroze Jeejeebhoy Towers Exchange Plaza Bandra-Kurla Complex Dalal Street, Bandra (E), Mumbai – 400 051 Mumbai – 400 001 Scrip Code: TITAGARH Scrip

  2. Slide 2: Investor Presentation | Q1FY25

    INVESTOR PRESENTATION | Q1FY25

  3. Slide 3: Safe Harbor

    Safe Harbor This presentation and the accompanying slides (the “Presentation”), which have been prepared by Titagarh Rail Systems Limited (TRSL, the “Company’), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe f

  4. Slide 4: Titagarh Rail Systems Limited: An Overview

    Pioneering Innovation & Precision Engineering for Unparalleled Rail Systems Titagarh Rail Systems Limited: An 01 Overview 02 Q1 FY25 Financial Snapshot 03 Strong Order Book Position 04 Business Segments 05 JVs and Partnerships 3

  5. Slide 5: About the Company

    ‘ gle About the Company

  6. Slide 6: Titagarh Rail Systems Limited: An Overview

    Titagarh Rail Systems Limited: An Overview TRSL continues to be a Net Debt negative company. 12,000 Wagons per year 1997 4 300 Coaches per year Year of Establishment Manufacturing Facilities Manufacturing Capacity 14,117 Cr- Company Only Indian Company 25-30 % 13,326 Cr- Share from JV Manufacturing

  7. Slide 7: Titagarh Wagons to Titagarh Rail Systems

    Titagarh Wagons to Titagarh Rail Systems 1997 2007 2015 2019 2022 2023 2023 2024 Wagon EMU/MEMU for Acquisition of Pune Metro – First Bangalore Metro Surat & Vande Bharat Design Centers in Manufacturing Indian Railways Firema SpA, Italy, & Only (Steel bodied Ahmedabad Sleeper train Kolkata, - Passen

  8. Slide 8: Manufacturing Facilities & Engineering Center

    Manufacturing Facilities & Engineering Center 1 Kolkata (India) Titagarh Rail Systems Limited Bangalore (India) 5 Passenger Rail Systems Unit Titagarh Rail Systems Limited Engineering Centre 2 Kolkata (India) Titagarh Rail Systems Limited Chennai (India) 6 Freight Rail Systems Unit 7 Ramkrishna Tita

  9. Slide 9: Q1 FY25 Operational Performance

    Q1 FY25 Operational Performance

  10. Slide 10: FY25 - Key Business Updates

    FY25 - Key Business Updates BENGALURU METRO TRACTION CONVERTERS • Titagarh Rail Systems Limited (TRSL), the prominent Indian • The Company has commenced the export of traction rolling stock manufacturer has commenced the production of converters, pursuant to which the first batch of 8 converters tra

  11. Slide 11: Q1 FY25 - Key Business Updates

    Q1 FY25 - Key Business Updates Freight Rail Systems Passenger Rail Systems 3418 cr 436 cr 61 cr 1017 cr 42 3 842 cr 746 cr 2,700 8,389 78 36 cr 2,073 1,835 12 165 cr 84 18 6 Q1 FY 25 Q4 FY 24 Q1 FY 24 Q1 FY 25 Q4 FY 24 Q1 FY 24 FY 24 Dispatch of Metro Coaches FY 24 Wagons sold during the period Sale

  12. Slide 12: Strong Order Book Position

    Strong Order Book Position Receipt of Major New Orders ➢ Received approximately Rs. 350 Crs worth of orders in Q1 FY25 across business segments ➢ This includes Rs. 250 Crs worth of orders for Freight Rolling Stocks & Rs. 100 Crs worth of orders for propulsion system. ➢ As of June ’24 our order book

  13. Slide 13: Q1 FY25 Standalone Profit & Loss Statement

    Q1 FY25 Standalone Profit & Loss Statement Particulars (in INR Crs) Q1 FY25 Q1 FY24 Y-o-Y Q4 FY24 Q-o-Q FY24 FY23 Y-o-Y Revenue from Operations 903.1 910.8 -0.8% 1052.4 -14.2% 3,853.3 2,780.5 38.6% Cost of Materials Consumed 689.5 726.7 806.7 2,951.7 2,165.4 Changes in Inventories of Finished Goods

  14. Slide 14: Q1 FY25 Segmental Performance

    Q1 FY25 Segmental Performance No.s in Rs. Cr. unless otherwise mentioned Q1 y-o-y Q4 12M y-o-y Particulars FY25 FY24 Growth (%) FY24 FY24 FY23 Growth (%) Revenue 903.1 910.8 -0.8% 1052.4 3853.3 2780.5 38.6% EBITDA 101.8 106.1 -4.1% 120.1 451.9 264.4 70.9% Margin (%) 11.3% 11.7% 11.4% 11.7% 9.5% - Pr

  15. Slide 15: Financial Snapshot (Standalone)

    Financial Snapshot (Standalone) Net Revenue Net Revenue EBITDA PBT PAT +187% +39% +71% 94% 296.9 3,853.3 451.9 397.0 2780.5 -4% +5% +5% -1% 264.4 205.1* 103.3 910.8 903.1 106.1 101.8 94.5 67.6 71.3 90.1 FY23 FY24 Q1FY24 Q1FY25 FY23 FY24 Q1FY24 Q1FY25 FY23 FY24 Q1FY24 Q1FY25 FY23 FY24 Q1FY24 Q1FY25 E

  16. Slide 16: Freight Rolling Stock

    Freight Rolling Stock

  17. Slide 17: Freight Rail Systems: Manufacturing Excellence for 25+ years

    Freight Rail Systems: Manufacturing Excellence for 25+ years o 25+ years in design and manufacturing wagons 12,000 p.a 30,000 MT Liquid Metal for various. Wagon Capacity Installed capacity at two facilities - Titagarh and Uttarpara o Started with a capacity of 150 wagons pa in 1997. o Market leader

  18. Slide 18: Passenger Rolling Stock

    Passenger Rolling Stock

  19. Slide 19: Passenger Rail Systems: The Future Of Transportation

    Passenger Rail Systems: The Future Of Transportation Expanding Rolling stock Capacity Current Proposed FY27 Proposed FY28 300 p.a 850 p.a 1200 p.a Order Book2 (₹ in cr.) Gross Revenue (₹ in cr.) PBIT (₹ in cr.) 3.0% 3481 Cr 6750 Cr 541 Cr 436 Cr -00 Cr 13 Cr FY21 FY24 FY21 FY24 FY21 FY24 Rolling sto

  20. Slide 20: Strategic Investment & Production Enhancement Plan

    Strategic Investment & Production Enhancement Plan Metro and Passenger Coaches • Metro Coaches – Enhanced Phase 1 Phase 2 • Mainline Coaches Phase 3 to 36 cars / month • Metro Coaches – May 24 25 cars / month March 25 (VB) – 25 cars March 27 • Mainline Coaches (VB) - /month Enhanced to 36 cars / mon

  21. Slide 21: Modernisation of Uttarpara Passenger Unit

    MODERNISATION of Uttarpara Passenger Unit This unit of Titagarh Rail Systems Ltd. has been fully complied with an Industry 4.0 ready system to increase production using smart technologies. This improved communicating system is self-monitoring that can analyze and diagnose issues without the need for

  22. Slide 22: Testing Facility – PRS Unit

    Testing Facility – PRS UNIT Laser tracker measuring device Traction Motor Testing facility Testing Track Gauge Test (Faro vantage) Power module Assembly Shop for Winding shop Export orders of Converters Assembly of Traction Converter VPI Plant with Oven 21

  23. Slide 23: Titagarh – Engineering Plan for Future FY26-27 onwards

    Titagarh – Engineering Plan for Future FY26-27 onwards Metro Product Variants Available Under Not yet Grand 22 development developed Total Metro Product Variants 22 7 12 41 12 Carbody + Bogies 3 2 2 7 7 Propulsion - 25kV 9 6 15 Propulsion - 750Vdc 1 5 4 10 1500Vdc 4 4 Available Under To be Developed

  24. Slide 24: Expanding Horizons & Maximizing Opportunities: JVs and Partnerships

    Expanding Horizons & Maximizing Opportunities JVs and Partnerships 2015 2023 2023 2023 2024 Titagarh and ABB to Alliance with Sidwal Ramkrishna Forgings TRSL made a consortium jointly design, develop and Refrigeration Pvt Ltd (a TRSL acquired Firema and Titagarh Wagons to with BHEL to manufacture IG

  25. Slide 25: Optimizing the Value Chain

    Optimizing the Value Chain Backward integration Rail equipment value chain Forward integration • Investment in backward • Expert engineers committed to • Robust industrial manufacturing • Less reliance on third parties integration empowers to position design state of the art and execution capability

  26. Slide 26: Strong Industry Tailwinds

    Strong Industry Tailwinds

  27. Slide 27: Indian Railways: 4th Largest Rail Network Globally

    INDIAN RAILWAYS: 4th Largest Rail Network Globally FY25 FY28 FY30 • Increase the coverage of • 400 Vande Bharat trains to • Increase share of Railways Metro rail to 27 cities. be added to existing fleet. in freight traffic from 27% to 45%. • Extend Metro rail network by 800 kms to 1700 kms in • Incr

  28. Slide 28: Freight & Passenger Growth Drivers

    Freight & Passenger Growth Drivers Annual freight target expected to increase from 1,400m tonnes to 3,000m tonnes by FY27 implying an increase in the wagon fleet from current ~3.0 lakh to ~5.4 lakh by The Government of India aims in launching 400 Vande Bharat train in the next 3-4 FY31. years. India

  29. Slide 29: Opportunity Pipeline

    Opportunity Pipeline Expected Tender Sl. No Project Units Value (Rs. Crs.) Timeline August 24 to 1 Metro Coach Contracts ~1000 ~17,900 December 24 Vande Bharat Aluminum 2 ~1600 ~36,000 September 24 Coach 3 Propulsion (315 units) ~220 ~1,000 August 24 to March 25 4 Traction Motors ~700 ~100 August 24

  30. Slide 30: Thank You

    Name: Harsh Motika Email: harsh.motika@titagarh.in Phone: +91 7003781561 Website: www.titagarh.in Name: Parth Patel / Prachi Ambre Email: parth.patel@linkintime.co.in / prachi.ambre@linkintime.co.in Phone: +91 98197 85972 / +91 83559 85370 Website: www.orientcap.com Thank You

Titagarh Rail Systems — Q1 FY2025 Earnings Presentation on 6ix