Sheffield Resources Limited · ASX:SFX

Sheffield Resources — TZMI Conference – Singapore 2018

36 slides from Sheffield Resources's conference presentation, Nov 13, 2018

  1. Slide 1: TZMI Conference – Singapore, November 2018

    For personal use only TZMI Conference – Singapore November 2018

  2. Slide 2: Important Notice and Disclaimer

    IMPORTANT NOTICE AND DISCLAIMER IMPORTANT: You must read the following before continuing. For personal use only Summary information in relation to Sheffield This presentation contains summary information about Sheffield [Resources Limited (ACN 125 811 083) (Company or Sheffield), its subsidiaries an

  3. Slide 3: Important Notice and Disclaimer

    IMPORTANT NOTICE AND DISCLAIMER Not financial product advice For personal use only This presentation, and the information provided in it, does not constitute, and is not intended to constitute, investment or financial product advice (nor tax, accounting or legal advice). This presentation should not

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Thunderbird is a world-class mineral sands development project For personal use only • Large-scale, high grade, zircon-rich project with low operating costs, strong margins and attractive economics anticipated • Expected 42 year mine life based on current JORC Ore Reserve1 and

  5. Slide 5: Company and Project Status

    COMPANY AND PROJECT STATUS For personal use only Mineral sands pricing environment has strengthened • Zircon and TiO2 price environment has strengthened due to ongoing supply constraints and global economic growth • Material improvement in pricing relative to March 2017 Bankable Feasibility Study (“

  6. Slide 6: A Globally Significant Zircon Discovery

    A GLOBALLY SIGNIFICANT ZIRCON DISCOVERY For personal use only Globally significant Zircon discoveries over the past 30 years based on published pre-production resources 20 Thunderbird, SFX Thunderbird 18 • Thunderbird is one of the most significant zircon discoveries in the last 30 years 16 • Expect

  7. Slide 7: A World Class, High Grade Ore Reserve

    A WORLD CLASS, HIGH GRADE ORE RESERVE For personal use only Comparison of Thunderbird’s Ore Reserves against latest Ore Reserves for key global mineral sands deposits 5.0 TiO2 Grade % Fairbreeze (TROX) In Situ Titanium Minerals (Ilm+Lux+Rut) % Namakwa (TROX) 4.0 QMM (RIO) Cataby (ILU) THUNDERBIRD (S

  8. Slide 8: Zircon Industry Dynamics

    ZIRCON INDUSTRY DYNAMICS For personal use only A substantial supply gap is emerging… Key observations ‘000 tonnes Global Zircon Supply Outlook (kt) Thunderbird ideally Demand “Industry and Consumers are expecting positioned to help bridge the expected supply gap • 1.2Mtpa global market, expected to

  9. Slide 9: Titanium Feedstock Industry Dynamics

    TITANIUM FEEDSTOCK INDUSTRY DYNAMICS For personal use only TiO2 feedstock demand and supply dynamics Key observations (‘000 TiO2 units) Demand • Approximately 7.3m TiO2 units global market, expected to grow at Overall Feedstock Supply/Demand Balance to 2022 2.3% CAGR from 2017 to 2026, with pigment

  10. Slide 10: LTR Ilmenite Market Opportunity

    LTR ILMENITE MARKET OPPORTUNITY For personal use only Thunderbird’s LTR Ilmenite product is ideally suited as a direct input to sulfate pigment and chloride slag ‘000 TiO2 units 8,000 Thunderbird LTR Ilmenite (57% TiO2) product Global Product Mix 20181 • Unlike most global ilmenite supply, Thunderbi

  11. Slide 11: High Grade Continuity x Deposit Thickness = Value

    HIGH GRADE CONTINUITY x DEPOSIT THICKNESS = VALUE For personal use only Project plan view Overview • Thunderbird contains a continuous high grade zone up to 46m thickness • Strong continuity and very high Valuable Heavy Mineral (“VHM”) grades OPEN • Near-surface high grades to be targeted early in t

  12. Slide 12: Conventional Processing

    CONVENTIONAL PROCESSING Flowsheet producing five high grade, quality products For personal use only Flowsheet summary • Conventional HM sands processing circuit1 • Ilmenite upgrade via low temperature roast (“LTR”) • LTR upgrades to > 56% TiO2 producing premium sulphate ilmenite, and chloride slag f

  13. Slide 13: Attractive Product Mix and Pricing Environment

    ATTRACTIVE PRODUCT MIX AND PRICING ENVIRONMENT Indicative % of total LOM revenue1 Thunderbird’s key products Long-Term Price Forecasts3 For personal use only Premium Zircon Current Premium Zircon • Ceramic grade zircon product with reference price is > 66% ZrO2 + HfO2 US$1,640/tonne (CIF China)2 • L

  14. Slide 14: Binding Off-Take Substantially Complete

    BINDING OFF-TAKE SUBSTANTIALLY COMPLETE Robust demand for Thunderbird offtake For personal use only • Thunderbird aims to deliver a secure, consistent supply of high quality products over its expected 42 year mine life • Thunderbird is located in a low risk jurisdiction, proximal to the largest emer

  15. Slide 15: Indicative Mine Schedule

    INDICATIVE MINE SCHEDULE Stage 1 Stage 2 For personal use only 1,400 1,200 1,127 1,086 1,000 965 955 336 324 809 828 000’ tonnes 800 287 282 776 93 94 249 240 106 227 584 96 80 81 600 560 503 91 91 65 79 68 170 73 166 67 152 76 400 52 50 47 49 59 36 548 567 485 477 200 405 420 383 122 257 281 287 33

  16. Slide 16: Staged Approach to Project Development

    STAGED APPROACH TO PROJECT DEVELOPMENT For personal use only Sheffield’s approach • Scale of ore body allows for multiple stage development leveraging shared infrastructure and operating footprint • Current execution strategy is based on two stages of development phased to seek to minimise up front

  17. Slide 17: Indicative Operating Costs

    INDICATIVE OPERATING COSTS Outstanding Indicative Revenue to Cost Ratio For personal use only Stage 1 Operating Costs (Steady-State)1 Stage 2 Operating Costs (Steady-State)3 Revenue Revenue (net of royalties) (net of royalties) A$233m2 Operating margin = A$117m A$417m4 Operating margin = A$236m Reve

  18. Slide 18: Stage Execution Strategy

    STAGE 1 EXECUTION STRATEGY For personal use only Sheffield is focused on minimising execution risk and ensuring successful project delivery The project will be delivered in 3 key stages Sheffield’s delivery team 1. Early works • Sheffield’s Project Team is made up of highly credentialed technical, m

  19. Slide 19: Thunderbird Capital Expenditure

    THUNDERBIRD CAPITAL EXPENDITURE Stage 1 Capex (A$m) For personal use only Sheffield Total Project Additional Funding Requirements Capital Estimate3 • In addition to Stage 1 capex, A$463m Sheffield will need to fund the following items during the 2 year GRES EPC construction period: Contract 95 o Sta

  20. Slide 20: Senior Debt Financing Summary

    SENIOR DEBT FINANCING SUMMARY For personal use only US$175m Taurus facility A$95m NAIF loan facilities • Lender: Taurus Mining Finance Fund and Taurus Mining Finance Annex • Lender: State of Western Australia, under back-to-back loan from Fund Northern Australia Infrastructure Fund (“NAIF”) Board •

  21. Slide 21: Debt Principal Repayment Profile

    DEBT PRINCIPAL REPAYMENT PROFILE For personal use only Scheduled Debt Principal Repayment Profile (A$m)1,2 175 3 150 Taurus Tranche A (US$75m) Taurus Tranche B (US$100m) 125 NAIF Tranche C (A$30m) NAIF InfraCo Facility (A$65m) 100 133 75 50 3 3 25 41 4 27 23 10 3 3 3 3 4 3 4 4 0 2 4 4 4 4 4 4 2 4 5

  22. Slide 22: Stage 1 Development & Commissioning Timeline

    STAGE 1 DEVELOPMENT & COMMISSIONING TIMELINE For personal use only Engineering, construction and commissioning is expected to take approximately 2 years, followed by a period of production ramp-up 2018 2019 2020 2021 Month O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

  23. Slide 23: Experienced Board and Management

    EXPERIENCED BOARD AND MANAGEMENT For personal use only Will Burbury Bruce McFadzean David Archer Non-Executive Chairman Managing Director Technical Director Previously Chairman of Warwick Mining engineer with over 40 years Geologist with over 30 years Resources Limited in 2009 and was experience lea

  24. Slide 24: Sheffield Community Investment

    SHEFFIELD COMMUNITY INVESTMENT For personal use only Our Pledge to the Kimberley Community Our Current Social Licence to Operate • Local Content Employment – 280 local jobs • Active Group Training Program with Aboriginal participants transferring to permanent employment • Intergenerational Employmen

  25. Slide 25: Exploration Confirms New Mineral Sands Province

    EXPLORATION CONFIRMS NEW MINERAL SANDS PROVINCE For personal use only Outstanding Exploration Drill Results The latest results include the following broad, high grade intervals1: 46.5m @ 5.50 % HM from 57.0m (NLAC025), including 21.0m @ 9.12% HM from 64.5m (Buckfast) 33m @ 4.00% HM from 61.5m (NLAC0

  26. Slide 26: Appendix A: Other information

    For personal use only Appendix A Other information 26

  27. Slide 27: Sheffield Snapshot

    SHEFFIELD SNAPSHOT For personal use only Sheffield is focused on development of the large scale, high quality Thunderbird mineral sands project Last twelve months share price performance $1.30 Successful delivery of key project milestones $1.10 has driven long term share price appreciation $0.90 $0.

  28. Slide 28: A Second Quartile Producer

    A SECOND QUARTILE PRODUCER For personal use only TZMI assess Thunderbird to have a competitive revenue to cost ratio 1st Quartile 2nd Quartile 3rd Quartile 4th Quartile Thunderbird Source: TZMI Notes: 1. Cautionary Statement: Thunderbird’s cost position is as estimated by TZMI and based on the March

  29. Slide 29: Royalty Regime and Fiscal Arrangements

    ROYALTY REGIME AND FISCAL ARRANGEMENTS For personal use only Royalties1 • Royalty (Years 1 to 4, starting on first sale) = 0.5% of Total Sales Revenue on FOB basis or equivalent • WA State govt. royalty = 5% of State government Taurus3 • Royalty (Years 5 onwards for a period of to 22.5 Total Sales R

  30. Slide 30: Enhanced Flexibility from Proposed NAIF Debt Facilities

    ENHANCED FLEXIBILITY FROM PROPOSED NAIF DEBT FACILTIES For personal use only NAIF facility highlights • NAIF is a corporate Commonwealth entity that was established under the NAIF Act 2016 to provide assistance to the states of Queensland, Western Australia and the Northern Territory for the constru

  31. Slide 31: Appendix B: Product details

    For personal use only Appendix B Product details 31

  32. Slide 32: Premium Zircon

    PREMIUM ZIRCON1 For personal use only Product overview Thunderbird’s Premium Zircon product • Ceramic Grade Zircon: > 66% ZrO2 • Low levels of impurities • Good Opacity • No iron staining • Low levels of impurities • Good whiteness - • Low Fe2O3 important for making a good opacifier • Low TiO2 • Ver

  33. Slide 33: LTR Ilmenite

    LTR ILMENITE1 Product overview Global ilmenite comparison: FeO: Fe2O3 ratio For personal use only • Exceptional Grade: 56–58% TiO2 • Suitable for chloride slag production • Premium feedstock for sulfate pigment production Highly reactive ilmenite • High acid solubility Suited to Chinese • Good react

  34. Slide 34: Appendix C: Reserves and resources

    For personal use only Appendix C Reserves and resources 34

  35. Slide 35: Ore Reserves

    ORE RESERVES For personal use only Thunderbird deposit ore reserves1,4 Valuable Heavy Mineral (VHM) in-situ grade In-situ HM Valuable HM Grade (In-situ)2 Ore Reserve Ore Tonnes HM Grade Slimes Osize Tonnes Zircon HiTi Leuc Leuc Ilmenite Category (millions) (%) (%) (%) (millions) % % % % Proved 235.8

  36. Slide 36: Mineral Resources

    MINERAL RESOURCES THUNDERBIRD DEPOSIT MINERAL RESOURCE1,2,7 For personal use only Valuable HM Grade (In-situ)4 Mineral Resource Material Tonnes In-situ HM Tonnes HM Grade3 Slimes Osize Cut-off (HM%) Zircon HiTi Leuc Leuc Ilmenite Category (millions) (millions) (%) (%) (%) (%) (%) (%) (%) Measured 51