Delta Lithium Limited · ASX:DLI

Delta Lithium — Investor Presentation (February 2021)

14 slides from Delta Lithium's investor presentation, Feb 15, 2021

  1. Slide 1: Eureka & Warriedar Gold Projects

    EUREKA & WARRIEDAR GOLD PROJECTS I N V E S T O R P R E S E N TAT I O N | F E B R U A R Y 2 0 2 1 | ASX:TIN

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation does not constitute an offer that is capable of acceptance nor is it a disclosure document under the Corporations Act. This presentation is intended for recipients collectively and does not take into account the investment objectives, financial situations and particular

  3. Slide 3: Corporate Structure

    CORPORATE STRUCTURE HIGHLY EXPERIENCED BOARD AND MANAGEMENT CAPITAL STRUCTURE TIN MATT BOYES • Qualified geologist with 25 years’ industry experience and a strong background CHIEF EXECUTIVE in mineral resource estimation, project development and operations CURRENT SHARE PRICE 21c OFFICER management.

  4. Slide 4: An Outstanding Investment Opportunity

    AN OUTSTANDING INVESTMENT OPPORTUNITY Company-making potential in underexplored gold projects, Eureka and Warriedar, in well- known WA mining districts Both projects feature historic high-grade production close to infrastructure including operating gold mills Opportunity for rapid delineation of sig

  5. Slide 5: Eureka Mine

    EUREKA MINE Eureka Project comprises of 5 tenements including 4 mining leases and 1 exploration permit to the west of existing pit Ground position sits 50km North of Kalgoorlie - excellent access and supporting infrastructure Minimal exploration completed outside of known pit area Initial RC drillin

  6. Slide 6: Recent Drilling Adding to Strike Extension in Previously Untested Areas

    RECENT DRILLING ADDING TO STRIKE EXTENSION IN PREVIOUSLY UNTESTED AREAS Good Mineralisation is not Widths of closed off in either oxidized direction North or South material of existing Resource intersected close to existing pit boundary Down dip extensions will be tested in mid Feb as a larger capac

  7. Slide 7: Near Pit Exploration Targets

    NEAR PIT EXPLORATION TARGETS 4 main areas now tested To date 30% of assays returned Drilling continues with program expanded to 12,000m Results pending for majority of drilling completed Company aiming to complete a resource update in Q2 for the main lode and Laterite areas Best results to date incl

  8. Slide 8: Eureka – Drilling Commenced on Northern Target Area

    EUREKA – DRILLING COMMENCED ON NORTHERN TARGET AREA Assays received for 4 holes in the Northern target area Mineralisation open to North and South of existing old workings, structure visible in surface trenching and intersected in multiple holes, WRRC0018 5m @ 2.88 g/t Au including 1m @ 10.58/g/t fr

  9. Slide 9: Warriedar Project

    WARRIEDAR PROJECT 45km2 tenements including granted Mining Leases Close to Perth and existing infrastructure Tenements feature historic mine workings that produced high- grade gold Includes Reids Ridge mine Walk-up drill targets Area to date is underexplored Awaiting POW approval for first pass dril

  10. Slide 10: Reids Ridge Mine & Commodore Target

    REIDS RIDGE MINE & COMMODORE TARGET Large fault mappable over 3km in length Multiple Au occurrences along strike with Reids Ridge mine and Commodore prospect Relatively little exploration below existing workings High grade structure Au Occurrences over Reids Ridge and Commodore Prospects TNT Mines |

  11. Slide 11: Reids Ridge Mine

    REIDS RIDGE MINE Initial drill targets down dip of current mine and open to south and north Drilling planned for Q1 2021 Initial 5000m program designed to step out from known high grade intercepts Untested structure at depth and North to Commodore TNT Mines | Investor Presentation 11

  12. Slide 12: Large Land Position Multiple Targets to Test in 2021

    LARGE LAND POSITION MULTIPLE TARGETS TO TEST IN 2021 Regional targets to be tested in 2021 including Mt Laws extension, Langs Find AC programs designed to test geochem anomalies across BIF horizons RC program to test southern strike extent of Golden Eagle Geochem Anomalies Over air Mag survey highli

  13. Slide 13: Additional Notes to Mineral Resource Estimation / Competent Persons Statement

    ADDITIONAL NOTES TO MINERAL RESOURCE ESTIMATION The Mineral Resource as presented in Table 1 have been estimated on the basis of historical and recent drilling at the Project by Independent consulting resource geologist Richard Maddocks. Further details of the Mineral Resource estimation are provide

  14. Slide 14: 1202 HAY STREET WEST PERTH WA 6005 PH: +61 8 6319 1900 E: frontdesk@tntmines.com.au

    1202 HAY STREET WEST PERTH WA 6005 PH: +61 8 6319 1900 E: frontdesk@tntmines.com.au TNT Mines | Investor Presentation | 14

Delta Lithium — Investor Presentation (February 2021) on 6ix