Jzr Gold Inc. · TSXV:JZR

Jzr Gold — Investor Presentation (June 2026)

16 slides from Jzr Gold's investor presentation, June 2026

  1. Slide 1: N ie

    \ N ie

  2. Slide 2: Delineating >5M Oz Gold Resource & Near-term Cashflow From Tailings Operation

    Delineating >5M Oz Gold Resource & Near-term Cashflow From Tailings Operation revenue expected in Q3, 2026

  3. Slide 3: Vision and ESG

    w while continuing to < n and delin O00 ounce: Vision significant shareholder value and becoming an obvious M&A target for gold majors operating in the region nglo Gold) ESG Achieve environmental sustainability, community engagement and benefit. and safety in all its operations

  4. Slide 4: Focused On Delivering Shareholder Value

    Focused On Delivering Shareholder Value GRAHAM CARTER, DIRECTOR

  5. Slide 5: Brazil Is A Tier 1 Mining Jurisdiction, With Recent M&A For Copper And Gold

    Brazil Is A Tier 1 Mining Jurisdiction, With Recent M&A For Copper And Gold Assets In the first two decades of the 21st century, industrial mining in Brazil produced around 1,023 tonnes of gold Of this total, seven large enterprises concentrated 80% of production • Cuiabá (AngloGold Ashanti) and Mor

  6. Slide 6: First revenue expected in Q3, 2026

    First revenue expected in Q3, 2026 >700,000 Oz Of Au From Gold Tailings Operations At Vila Nova Project Near term cash-flow: Fully paid for gravitational mill will process high grade gold tailings at o Gold has increased in value by over in the (per ounce) past year o Physical gold demand has increa

  7. Slide 7: Orogenic gold deposits and tailings reprocessing

    • Orogenic gold deposits have the potential for significant size at depth and are similar in nature to those found in West Africa and Ontario/Quebec. • The geological characteristics of the area have been well-established and known to support economic gold deposits, which could be useful for future

  8. Slide 8: The Vila Nova Project is located in the Mazagão municipality of the Amapá State

    The Vila Nova Project is located in the Mazagão municipality of the Amapá State of Brazil • Operated by the national company CMA (1984 – 1995) • Initially operated as an open-pit • later developed as an underground mine, • Production: 19.96 Tonnes of gold. • The largest industrial gold mine in Amapá

  9. Slide 9: JZR has invested upwards of USD $7M into:

    JZR has invested upwards of USD $7M into: Environmental and permitting process Bulk-sampling gravimetric Core drilling 18 holes, sampling, and trenching of tailings with 1,400 meters completed Two diamond drilling rigs, and two excavators Highway access, 145km from city of Macapá, major airport

  10. Slide 10: with first revenue expected in Q3, 2026

    with first revenue expected in Q3, 2026

  11. Slide 11: Delineating >5M Oz Deposit

    es. al DELINEATING >5M OZ DEPOSIT ? 7 erm cash-flow from high-grade gold concentration plant from 0 million tonnes of tailings identified with grades averaging 2.7 g/t for an estimated gold content of over 700,000 ounces Fully permitted: Exploration and exploitation license in place wh allows the pr

  12. Slide 12: Based on historical and current drilling

    Based on historical and current drilling 4 exploration totaling 77 drill-holes for an Vila Ne a aggregate of 10,084 meters the following \ ivi ja Nova Go exploration potential is estimated: er Ee - p 54 Million tonnes grading 2.08 g/t Sa, potentially containing 3.6 Moz of gold po 92 Million tonnes g

  13. Slide 13: Gold is estimated to be approximately 5M oz of Au

    gold is estimated to be approximately 5M oz of Au: Tonnage

  14. Slide 14: Recovery of 89% or more: approximately 2kg per day

    • • • and recovery of 89% or more, we have: 800 x 2.5 x 0.9 ~ 2kg per day

  15. Slide 15: At The Core Of Our Strategy

    At The Core Of Our Strategy o Employment of local communities in o Providing safety through training the mill operation o Constant inspection of hygiene, o 15%of profits from the mill operation cleanliness and order activities in the are shared with the local mining enterprise cooperative of Vila No

  16. Slide 16: Blue-sky Potential through Vertically-integrated Cash-flowing Gold Pilot & Exploration

    Blue-sky Potential through Vertically-integrated Cash-flowing Gold Pilot & Exploration leading to Resource Expansion

JZR Gold — Investor Presentation (June 2026) on 6ix