Diatreme Resources Limited · ASX:DRX
Diatreme Resources — Investor Presentation (August 2013)
33 slides from Diatreme Resources's investor presentation, Aug 14, 2013

Slide 1: Diatreme Resources: Discovery to Production and Beyond
DIATREME RESOURCES Zircon Production Path WA Porphyry Exploration QLD Discovery to Production and Beyond Broker Presentation ‐ 14 August 2013

Slide 2: Statements
Statements This presentation contains certain forward‐looking statements and forecasts which include without limitation, expectations regarding future performance, exploration, mineral resources, the financial position of Diatreme Resources Limited (the “Company”), industry growth or other trend pro

Slide 3: DRX Corporate Details
DRX Corporate Details DRX—Capital Structure Directors Position Shares on Issue 529 Million Options on Issue (ex Sept 2013 @ $0.15) 88.7 Million Tony Fawdon Executive Chairman / CEO Share Price (as at 13/08/2013) A$0.02 Market Capitalisation (as at 13/08/2013) A$10.5 Million David Hall Executive Dire

Slide 4: Heavy Mineral Sand Products
Heavy Mineral Sand Products Zircon Uses TV Glass Foundary Castings Refractory Ceramics Zirconia & Chemicals TiO2 Pigment Uses Inks Paper Paint Plastic 4 Source: TZMI

Slide 5: Cyclone Deposit, Eucla Basin, Western Australia
CYCLONE DEPOSIT EUCLA BASIN WESTERN AUSTRALIA

Slide 6: Location - Eucla Basin
Location ‐ Eucla Basin •The Cyclone Deposit is in the highly prospective Eucla Basin • Eucla Basin – very high value mineral sand deposits: Iluka’s major Jacinth‐Ambrosia Mine. •Two port options, standard gauge railway nearby. •Western Australia – well known mining state. 6

Slide 7: Cyclone Fundamentals
Cyclone Fundamentals • JORC RESERVE: 97 million tonnes @ 2.5% heavy minerals. • 770kt of high value Zircon • Resource: 136Mt @ 2.3%. Potential for additional resources. • Zircon fundamentals are solid in the long term. • Zircon supply is well “managed” by the top three producers. (Iluka, Tronox, Rio

Slide 8: Investment Fundamentals
Investment Fundamentals Zircon Dynamics •Mineral sands sector commanding attention with demand driven by urbanisation and wealth. •Major use in ceramics etc. •Emerging supply shortfall of Zircon worldwide. •No relief of Zircon short supply on the horizon. •PFS completed, NPV of Cyclone is AUD$194M.

Slide 9: Cyclone Deposit - 3D
Cyclone Deposit — 3D 4; ~ CYCLONE DEPOSIT i : a —_ [aon [Fy OVERBURDEN — RESOURCE [reserves

Slide 10: Proposed Mining Methods
Proposed Mining Methods Vz CYCLONE DEPOSIT Rehabilitation 10

Slide 11: Slurry Ore to Plant
Slurry Ore to Plant CYCLONE 11

Slide 12: Wet Concentration Plant
Wet Concentration Plant CYCLONE 12

Slide 13: Transport Options
Transport Options CYCLONE 13

Slide 14: Airstrip at Forrest Siding
Airstrip at Forrest Siding 14

Slide 15: Cyclone Project Financials - PFS
Cyclone Project Financials – PFS Capital Investment (including PFS & DFS) AUD$223 Million Average Annual Sales Revenue AUD$191 Million Average Annual Operating Costs AUD$88 Million Average Annual Tax Payable AUD$24 Million Average Annual Operating Cash Flow After Tax AUD$78 Million Payback Period (Y

Slide 16: Alternative Project Options
Alternative Project Options Reduce Capex together with optimised higher grade mine path •New Low cost development Plan. •Mineral Separation Plant in China. •Engineering cost savings. •Ability to scale‐up. •100% project ownership (Agreement in principle with Chinese party to earn initial 6% for $2M).

Slide 17: Mineral Sands Exploration
Mineral Sands Exploration Noorina tenements 17

Slide 18: Mineral Sands Exploration - Noorina Tenements
Mineral Sands Exploration Noorina Tenements South Australia – Eucla Basin Noorina Tenements Legend Proposed Drilling Traverse Possible Beach Strandline Tenement Topography Background 18

Slide 19: Mineral Sands Exploration - Arckaringa Basin Tenements
Mineral Sands Exploration Arckaringa Basin Tenements Legend Proposed Drilling Traverse Possible Beach Strandline Tenement Topography Background 19

Slide 20: Mineral Sands Exploration - WA Eucla Basin Tenements
Mineral Sands Exploration WA Eucla Basin Tenements Legend Mineralisation Proposed Drilling Traverse Possible Beach Strandline Tenement Road Topography Background 20

Slide 21: Mineral Sands Exploration - WA Eucla Basin Tenements
Mineral Sands Exploration WA Eucla Basin Tenements Zephyr Legend Proposed Drilling Traverse Possible Beach Strandline Cyclone Tenement Road Highly Prospective Application Topography Background 21

Slide 22: Water Bore Drilling - Cyclone
Water Bore Drilling ‐ Cyclone Shallow bores drilled Sept targeting shallow ground water for deep drilling 10km operations. Deep bore drilled October to incept regional sandstone aquifer. Deep aquifer 80km Cyclone Project to the west delivered very Deep water bore high water yields. Pump tests and aq

Slide 23: Cyclone Project Mile Stones
Cyclone Project Mile Stones Water supply – Adequate water available for mining operations. Haul road progress – Progress environmental studies and permitting for haul road from mine site to rail siding. Grant of Mining Lease – Finalise agreement with Traditional Owners. 23

Slide 24: Clermont Project - Copper, Gold
Clermont Project – Copper, Gold 24

Slide 25: Clermont - Prospects, QLD
Clermont — Prospects, QLD @ Ladiode e 575,000 mE~ [-7,500,000mN 550,000 mE~ 525,000 mE~ Comstock EPM 17968 @ Ooky Crear LERMONT EPM 19544 ‘e @ Roe Crook West Copperted a Gr Gollan, a rande @ BLT Red Dog Round HS NGOS era nots ee downs Hilview East S © Palm Trees ROSEVALE @ Boofwood een Western |Gras

Slide 26: Farm-In by Antofagasta
Farm‐In by Antofagasta • Major Porphyry system identified at Clermont. • Antofagasta approached DRX to Farm‐In. • Antofagasta: Chilean copper company. Multi billion dollar producer listed on LSE. • Red rock alteration specific to particular porphyry systems. eg. Cadia/Ridgeway. Also identified at Cl

Slide 27: Clermont - Porphyry Corridor
Clermont ‐ Porphyry Corridor Rosevale Porphyry Targets to be Tested 2010 27

Slide 28: Clermont - RAB Drilling
Clermont — RAB Drilling 4 Diatreme Resources Limited Re-processed regional magnetics over original regional magnetics Proposed RAB Drilling Grid, Rosevale, Clermont, LD |2.&

Slide 29: Clermont - Rosevale Target
Clermont – Rosevale Target IP High Cross Cuts Geology 29

Slide 30: Clermont - Rosevale Drill Core
Clermont – Rosevale Drill Core RDD-015 -462m Red Rock Alteration 30

Slide 31: Clermont - Rosevale Drill Core
Clermont – Rosevale Drill Core RDD-015 -440m Red Rock Alteration and Mineralisation 31

Slide 32: DRX Investment Fundamentals
DRX Investment Fundamentals • Emerging supply shortfall of Zircon worldwide. • Tight supply in the hands of three major players. Demand for new suppliers. • Massive imbalance between current share price and value of Cyclone. deposit. $10M market cap. PFS completed, NPV of Cyclone is AUD$194M. • Pote

Slide 33: Diatreme Resources
DIATREME RESOURCES ACN 061 267 061 Zircon Production Path WA Porphyry Exploration QLD Discovery to Production and Beyond August 2013
Source: Internet Archive copy of diatreme.com.au
More decks from Diatreme Resources Limited
Noosa Mining Investor Conference 202623 slides · Jul 22, 2026
Noosa Mining Investor Conference 202526 slides · Nov 14, 2025
Noosa Mining Investor Conference 202522 slides · Jul 24, 2025
Noosa Mining Investor Conference 202435 slides · Nov 14, 2024
Noosa Mining Conference 202431 slides · Jul 18, 2024
Brisbane Mining Investor Conference 202428 slides · Mar 13, 2024