Cazaly Resources Limited · ASX:CAZ

Cazaly Resources — RIU Explorers Conference 2013

18 slides from Cazaly Resources's conference presentation, Feb 13, 2013

  1. Slide 1: Three Iron Ore Regions, High Grade Copper

    For personal use only Three Iron Ore Regions, High Grade Copper Parker Range Ready to Mine, New Copper Acquisition RIU Explorers 2013 – Perth, March 2013

  2. Slide 2: Disclaimer and Important Information

    Disclaimer and Important Information • This presentation has been prepared by Cazaly Resources Limited (“Cazaly”). It contains forecasts and forward looking statements which are no guarantee of future For personal use only performance and which involve certain risks. Actual results and future outcom

  3. Slide 3: Value Proposition

    Value Proposition CAZALY RESOURCES LTD For personal use only • Parker Range Project: NPV9: A$384M*, Post-tax IRR: 129% • High Grade – Mt. Angelo Copper Project. Active exploration • Pilbara Iron Ore Project • Earaheedy JV – Anglo American • Exploration Exposure through Joint Ventures • Royalty Strea

  4. Slide 4: Mt. Angelo Copper Project

    Mt. Angelo Copper Project Mt. Angelo Copper JV For personal use only • Cazaly can earn 75% be completing PFS • Historic results include 57m @ 5.04 % Cu, 43m @ 2.11% Cu • Mineralisation open down plunge, no drilling beneath 100m vertical in target zone. Mineralisation over 250m strike. • Southern gos

  5. Slide 5: Mt. Angelo Copper Project

    Mt. Angelo Copper Project Mt. Angelo Copper JV For personal use only • Metallurgical test work commenced • Exceptional first drilling results: 64m @ 2.72% Cu, 62m @ 2.41% Cu, 38m @ 2.65% Cu plus 13m @ 6.74% Zn & 15m @ 6.00% Zn • Contracts let for regional and local geophysical programmes • Cazaly fi

  6. Slide 6: Parker Range: Political Support

    Parker Range: Political Support SupportrSupport/Infrasturcture For personal use only • MINISTERIAL ANNOUNCEMENT Multi-user iron ore facility for Esperance Thursday, 31 January 2013 “Transport Minister Troy Buswell has given the go-ahead for the next stage of developing a new iron ore export facility

  7. Slide 7: Parker Range Iron Ore Project

    Parker Range Iron Ore Project Mount Caudan Iron Ore Deposit For personal use only Mount Caudan Iron Ore Deposit • 100% owned by Cazaly 4km strike • Total current resource of 35.1Mt @ 55.9% Fe (61.4% CaFe), comprising 24.4Mt @ 56.0% Fe of Measured Resources, 7.7Mt @ 56.6% Fe of Indicated Resources an

  8. Slide 8: Iron Ore Product

    Iron Ore Product Indicative Product Specs For personal use only Single Fines Only Product Targeted Option Fe% CaFe% SiO2% Al2O3% P% MnO% LOI% Fines 56.4 61.9 6.00 2.50 0.020 1.10 9.10 Only • Marketable product with acceptable levels of chemical impurities • Low Phosphorous product •73m @ 58.4% • Man

  9. Slide 9: Project Scope

    Project Scope Scope For personal use only • Open Pit Mining: Ramping from 2mtpa to 4mtpa • Plant: Crushing, screening & stockpiling • Road Haul: 57km on established roads to rail • Rail Haul: On public rail to port • Other: Grid power and accommodation facilities sited 14km away at town of Marvel Lo

  10. Slide 10: Esperance Port Sea and Land (EPSL)

    Esperance Port Sea and Land (EPSL) An Iron Ore Port For personal use only • Currently capable of exporting 12Mtpa. Cliffs Natural Resources currently utilise ~10Mtpa for iron ore • Political support for expansion • 20Mtpa expansion planned in two stages recently announced by the State • State govern

  11. Slide 11: Parker Range Project Summary

    For personal use only Parker Range Project Summary • Potential to deliver new iron ore mine in the Yilgarn of WA at PARKER RANGE • Export option via Port of Esperance, interim near term export solutions being examined • Robust project economics NPV9 A$384M, IRR 129% • Excellent infrastructure Roads,

  12. Slide 12: Pilbara Iron Ore

    Pilbara Iron Ore • Numerous projects in world class province For personal use only • Strategic land positions • Proven iron ore occurrences • Hamersley project vended out to Winmar Resources

  13. Slide 13: Pilbara Iron Ore – Hamersley Project

    Pilbara Iron Ore – Hamersley Project Winmar JV For personal use only • Winmar Resources Ltd earned 51% by FMG Solomon Mining Hub 3,118Mt @ 56.5% Fe expenditure of $6M • Located in Central Pilbara region • Adjacent to FMG’s Solomon project • Inferred Mineral Resource of 368Mt @ 54.7 % Fe (58.0% CaFe)

  14. Slide 14: Earaheedy Joint Ventures

    Earaheedy Joint Ventures Potential Major New Iron Ore Province For personal use only WESTERN Earaheedy JV EASTERN Earaheedy Anglo JV Cecil Rhodes EARAHEEDY BASIN PROJECT TENURE Parker Range • Anglo American Farms-Into joint Cazaly/Vector Resources Earaheedy East Project • Anglo to earn 75% via stage

  15. Slide 15: Earaheedy Projects

    Earaheedy Projects Anglo JV – Earaheedy East For personal use only • Prospective for large scale iron ore deposits • Maiden drilling program identified significant mineralisation at the Cecil Rhodes Prospect. Intersections include: 22m @ 58.1% Fe, 22m @ 57.8% Fe 26m @ 55.1% Fe • Initial work by Angl

  16. Slide 16: Huckitta IOCG Project – Northern Territory

    Huckitta IOCG Project – Northern Territory Mithril Resources Limited JV Sammy JV For personal use only • Mithril earned 80%. Now CAZ contributing • Greenfields exploration in an emerging province • Coincident gold, copper, gravity & IP anomalies → Iron Oxide Copper-Gold (IOCG) targets Illogwa IOCG T

  17. Slide 17: Cazaly Corporate Summary

    Cazaly Corporate Summary Advanced Projects, Cohesive Business Model For personal use only • PARKER RANGE:Potential to deliver new iron ore mine in the Yilgarn of WA 5Mt/Yr Capacity Reservation Deed at Esperance Port, economically robust, political will • MT. ANGELO: Initial high grade, shallow coppe

  18. Slide 18: Thank you

    For personal use only Thank you Level 2, 38 Richardson Street, West Perth, Western Australia, 6005. PO Box 396, West Perth, Western Australia, 6872 Phone: +61 8 9322 6283 Fax: +61 8 9322 6398 email: admin@cazalyresources.com.au ACN 101 049334 www.cazalyresources.com.au

Cazaly Resources — RIU Explorers Conference 2013 on 6ix