Graphite One Inc. · TSXV:GPH

Graphite One — Investor Presentation (October 2025)

29 slides from Graphite One's investor presentation, Oct 20, 2025

  1. Slide 1: Tech Materials for Global Ingenuity

    TSX-V: GPH OTCQX: GPHOF Tech Materials for Global Ingenuity. A U.S.-based Supply Chain Solution to Meet the Tech Sectors’ Rising Graphite Demand Q4 2025 GRAPHITEONEINC.COM

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements All statements in this presentation, other than statements of historical facts, including those related to the timing and completion of future production, establishment of a processing plant and a graphite manufacturing plant, and events or developments that the Company in

  3. Slide 3: About Graphite One Inc.

    About Graphite One Inc. • Developing the Graphite One Project (the “Project”) to become an American producer of synthetic and natural anode active materials (“AAM”) that is integrated with America’s largest natural graphite resource. • The Project: a vertically-integrated, enterprise-to-mine, proces

  4. Slide 4: Urgency of U.S. Graphite Supply Chain – Critical Supply Challenges

    URGENCY OF U.S. GRAPHITE SUPPLY CHAIN – CRITICAL SUPPLY CHALLENGES IMPACTING NATIONAL DEFENSE READINESS Strategic Supply Chain Vulnerability U.S. dependence on imported graphite, mainly from China, creates significant strategic risks amid global trade tensions. Critical Role in Clean Energy Graphite

  5. Slide 5: China Produces 97% of Global Graphite – Graphite One's Strategic Solution

    CHINA PRODUCES 97% OF GLOBAL SUPPLY OF GRAPHITE – GRAPHITE ONE’S STRATEGIC SOLUTION TO U.S. GRAPHITE DEMAND Largest U.S. Graphite Deposit Graphite One owns the largest known U.S. graphite deposit at Graphite Creek, supporting a 20-year mine-life. Strong Federal Support The Company received $37.5 mil

  6. Slide 6: Management Team

    Management Team Anthony Huston Doug Smith P.Eng., ICD.D Founder, CEO & Director Executive Chair & Director Successful entrepreneur with a background in tech, 35+ years in international coal industry. Former President & business development, and finance. Experienced as a CEO of First Coal (acquired b

  7. Slide 7: Outstanding Share Data

    Outstanding Share Data Market Capitalization (as of October 20, 2025) CAD - $258.6 million @ CA$1.50 per share USD - $187.9 million @ US$1. 09 per share GRAPHITE ONE | TSX-V: GPH OTC: GPHOF 7

  8. Slide 8: Strategy

    Strategy 1. Develop artificial graphite facilities • Built in stages (backwards from the end of the process) 1. Finishing & blending plant - Built close to battery manufacturing facilities in U.S. and Canada 2. Graphitization plant – Built in areas with low cost/green energy 3. Precursor pilot plant

  9. Slide 9: Major Milestones - Natural Graphite

    Major Milestones - Natural Graphite 1 2 3 Preliminary Economic Analysis Preliminary Feasibility Study Awarded US$37.5 Million completed in 2017 completed in August 2022 Department of Defense Grant in July 2023 4 5 6 Bering Straits Native Corporation Awarded US$4.7 Million DLA Technology Licence & to

  10. Slide 10: Major Milestones - Artificial Graphite

    Major Milestones - Artificial Graphite 1 2 3 Modified company strategy in Preliminary plant design Technology license signed with 2020 to include artificial included in PFS with Sunrise New Energy to purchase graphite production. purchased precursors - precursors and transfer August 2022 technology

  11. Slide 11: Graphite Creek Property

    Graphite Creek Property Graphite One @)

  12. Slide 12: Graphite Creek: A Generational Resource

    Graphite Creek: A Generational Resource • Supported by the US Government • Asset is located on 100% state-owned land and supported by the Alaska state government • Resource is cited as the “largest known graphite deposit in the U.S.” by the USGS. Deposit remains open to West, East and down dip. • Up

  13. Slide 13: 2024 Mineral Resource and Reserve Estimate

    2024 Mineral Resource and Reserve Estimate 1 Cutoff grade of 2% 2 Variable cutoff grade of between 2% - 3% Feasibility Study pit and mineral reserve footprint represents just 1.2 miles of the 9.5 miles long electromagnetic anomaly “The largest known graphite deposit in the United States is the Graph

  14. Slide 14: FS Pit versus PFS Pit superimposed on electromagnetic survey anomaly

    FS Pit versus PFS Pit superimposed on electromagnetic survey anomaly Note: Two images are facing each other GRAPHITE ONE | TSX-V: GPH OTCQX: GPHOF 14

  15. Slide 15: Feasibility Study (FS) Results

    Feasibility Study (“FS”) Results (Graphite Creek Mine and NG AAM Secondary Treatment Plant) Building a commercial AAM supply chain 15

  16. Slide 16: Summary of Feasibility Study Results

    Summary of Feasibility Study Results (Graphite Creek Mine and Secondary Treatment Plant) • Annual production of graphite concentrate increases from 53,000 tpy (PFS) to 175,000 tpy • Pre-tax: $6.4 billion NPV; 30% IRR; 7.3-Year Payback Post tax: 5.0 billion NPV; 27% IRR; 7.5-Year Payback • Total Cape

  17. Slide 17: Graphite One's AG AAM Manufacturing Facility: Proven Commercial Design

    Graphite One’s AG AAM Manufacturing Facility: Proven Commercial Design Building a commercial AAM supply chain 17

  18. Slide 18: FS AAM Manufacturing Facility Site Plan – Niles, Ohio

    FS AAM Manufacturing Facility Site Plan – Niles, Ohio (25,000 tpy Module) Source: Graphite Creek Project NI 43-101 Technical Report and Feasibility Study, Page 297 Effective Date: March 25, 2025 GRAPHITE ONE | TSX-V: GPH OTC: GPHOF 18

  19. Slide 19: Ohio AAM Manufacturing Facility Site

    Ohio AAM Manufacturing Facility Site • 50-year lease • Option to purchase • Brownfield site • Previously U.S. Dept. of Defense stockpile site for critical minerals 19

  20. Slide 20: Planned AG AAM Facility

    Planned AG AAM Facility 1 Phase 1 - Market Entry • Construct finishing/blending plant, initial capacity of 10,000 tpy: − produce AG AAM from strategically purchased AG and other materials − enables immediate production of AG AAM for testing and qualification • Commissioning by mid-20271. 2 Phase 2 –

  21. Slide 21: Ohio AG AAM Manufacturing Plant

    Ohio AG AAM Manufacturing Plant CAPEX(1) Mid-2027 $ 50 M • Commissioning of 10,000 tpy AMM finishing and blending plant Mid-2028 $ 57 M • Commissioning of a graphitization plant, annual production expected at 10,000 tonnes End of 2029 • Commissioning of precursor line - 25,000-tonne annual capacity

  22. Slide 22: Hunan Chenyu Fuji New Energy Technology Co., Ltd. (Chenyu)

    Hunan Chenyu Fuji New Energy Technology Co., Ltd. ("Chenyu”) 22

  23. Slide 23: Exclusive Consulting and Supply Agreements with Chenyu

    Exclusive Consulting and Supply Agreements with Chenyu Chenyu is a leading Chinese manufacturer of Anode Active Materials (AAM) that currently supplies qualified AAM to battery producers, including Hthium and CATL, the world’s largest EV and energy storage battery manufacturer.  All agreements are

  24. Slide 24: Presidential Actions: Executive Orders that Support Graphite One

    Presidential Actions: Executive Orders that Support Graphite One – January 20, 2025 ORDER NO. 14156 Sec. 2: Emergency Approvals Declaring a National Energy Sec 3. Expediting the Delivery of Energy Infrastructure Emergency ORDER NO. 14154 Sec 2: Unleashing Energy Dominance through Efficient Permittin

  25. Slide 25: Lucid Motors Supply Chain Agreement

    Lucid Motors Supply Chain Agreement Event @ U.S. Capitol Lucid Motors Supply Chain Agreement Event @ U.S. Capitol MARCH 2024 Signs non-binding 5-year off-take agreement for 5,000 tpa of AG AAM JUNE 2025 Signs non-binding 5-year off-take agreement for natural graphite AAM GRAPHITE ONE | TSX-V: GPH OT

  26. Slide 26: Strategic Investments – Alaska Native corporations

    Strategic Investments – Alaska Native corporations “This is not just an investment in Graphite One, it is a long-term investment in our region. We at BSNC have watched for years as Graphite One has worked to advance the Graphite Creek project and become a friendly neighbor in the region. Graphite On

  27. Slide 27: Export-Import Bank Financing

    Export-Import Bank Financing $895 million non-binding letters of interest • Potential financing will facilitate the construction of Graphite Creek Mine ($570 million) and Ohio AAM Facility ($325 million) • EXIM applications to be submitted in 2026 • Path to Revenue Generation – Sale of anode battery

  28. Slide 28: Approval for FAST-41 Federal Permitting Dashboard

    Approval for FAST-41 Federal Permitting Dashboard • FAST-41 Streamlines the permitting process by providing improved timeliness and predictability by establishing posted timelines and procedures for federal agency • Graphite One Project is the first Alaskan mining project listed on the Permitting Da

  29. Slide 29: Contact

    Contact Anthony Huston President & CEO 604-889-4251 Ahuston@graphiteoneinc.com Suite 600 - 777 Hornby Street Vancouver, British Columbia V6Z 1S4 graphiteoneinc.com 29

Graphite One — Investor Presentation (October 2025) on 6ix