Orica Limited · ASX:ORI

Orica — Corporate Update (February 2022)

30 slides from Orica's corporate update, Feb 28, 2022

  1. Slide 1: Community Reference Group Meeting

    28 FEBRUARY 2022 COMMUNITY REFERENCE GROUP MEETING ORICA KOORAGANG ISLAND

  2. Slide 2: Agenda

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 AGENDA 2

  3. Slide 3: Agenda

    Agenda • Welcome, introduction, apologies and acceptance of meeting notes • Orica KI community survey findings • Environmental projects update • Site status • Overview of safety, health and environmental performance in the last quarter • Community update • Other business • Action review and meeting

  4. Slide 4: Welcome and Introductions

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 WELCOME AND INTRODUCTIONS 4

  5. Slide 5: Welcome and introductions

    Welcome and introductions Orica University of Newcastle • Paul Hastie • Sallyann Hunting • Nicole Masson • Luc Van Vliet • Nathan Robinson • Paul Cunsolo Apologies • Lyn Kilby • Keith Craig 5 General

  6. Slide 6: Acceptance of Meeting Notes

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 ACCEPTANCE OF MEETING NOTES 6

  7. Slide 7: Acceptance of meeting notes

    Acceptance of meeting notes Meeting notes for the 29 November 2021 meeting were sent by email on 24 January 2022. 7 General

  8. Slide 8: Community Survey

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 COMMUNITY SURVEY SALLYANN HUNTING AND LUC VAN VLIET UNIVERSITY OF NEWCASTLE 8

  9. Slide 9: Environmental Projects Update

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 ENVIRONMENTAL PROJECTS UPDATE NATHAN ROBINSON 9

  10. Slide 10: NAP1 stack removal

    NAP1 stack removal General

  11. Slide 11: NAP1 stack removal

    NAP1 stack removal Flue removal – Lift 1 Module 2 General

  12. Slide 12: NOx reduction – ammonia reformer

    NOx reduction – ammonia reformer Impact – Reduction in NOx emissions from the reformer Status • Supplementary trials completed and trial summary submitted to EPA • 10-13% reduction in NOx @ 15kg/hr dosing • Proposing to implement the system permanently General

  13. Slide 13: Tertiary abatement – NAPs

    Tertiary abatement – NAPs BENEFIT – Reduction in emissions of greenhouse gases (N2O aka. nitrous oxide or laughing gas) and NOx (other nitrogen oxides which can be associated with acid rain/smog) General

  14. Slide 14: Tertiary abatement - NAPs

    Tertiary abatement - NAPs BENEFIT – Reduction in emissions of N2O and NOx to air Status • ERF eligibility confirmed – March 2021 • Internal funding approved and project commenced • Pre shutdown works May-Aug 2022 • NAP1 operation – Oct 2022 • NAP2 operation – Nov 2022 • NAP3 operation – Dec 2022 • A

  15. Slide 15: Nitrates effluent pond replacement

    Nitrates effluent pond replacement BENEFIT – Environmental risk reduction/loss of containment Status • Development approval obtained • No change to manufacturing process • Project involves replacement of an inground effluent pond with a fully bunded tank • Funding approved and project planning comme

  16. Slide 16: Prill tower scrubber

    Prill tower scrubber Benefits – improved air quality and lower nitrogen loads on the Hunter River Status • Modification application approved • Full sanction funding approved • Design phase progressing • Tendering commenced • Construction scheduled to commence late 2022 • Scheduled for completion lat

  17. Slide 17: MCI – Proposed demonstration plant

    MCI – Proposed demonstration plant Status • In 2016 Mineral Carbonation International (MCi) switched on the world’s first carbon reactor at the University of Newcastle in Australia. • The pilot plant reacts industrial CO2 emissions with alkaline mine waste to produce a range of carbonate products fo

  18. Slide 18: MCI – Proposed demonstration plant

    MCI – Proposed demonstration plant 18 General

  19. Slide 19: MCI – Proposed demonstration plant

    MCI – Proposed demonstration plant 19 General

  20. Slide 20: Site Status

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 SITE STATUS PAUL HASTIE 20

  21. Slide 21: Overview of SHE Performance

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 OVERVIEW OF SHE PERFORMANCE PAUL CUNSOLO 21

  22. Slide 22: December 2021 to February 2022

    December 2021 to February 2022 Injuries • Operator jarred their back while opening a door on a sea container. • Apprentice technician suffered a superficial burn to his index finger using a wire wheel on a pedestal drill. • Contractor received a slight tingle (electrical) while removing an extractio

  23. Slide 23: Community Update

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 COMMUNITY UPDATE NICOLE MASSON 23

  24. Slide 24: Community newsletter

    Community newsletter Issue 1 2022 delivered 26/27 February 2022. 24 General

  25. Slide 25: Community Investment Program

    Community Investment Program Hunter Multicultural Communities The organisation put a $10,000 grant towards upgrading it’s garden, including a new pergola, BBQ and seating. Bikers for Kids The organisation put a $5,000 grant towards the 2021 Toy Run. The event received around $70,000 in gifts for loc

  26. Slide 26: Community Investment Program

    Community Investment Program John Hunter Children’s Hospital With a $5,900 grant, the children’s hospital purchased a new Portable Endogenous Exhaled Nitric Oxide System. This device is required as part of the team’s standard of care for performing respiratory function testing. Matthew Talbot Centre

  27. Slide 27: Community Investment Program

    Community Investment Program 27 General

  28. Slide 28: Other Business

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 OTHER BUSINESS ALL 28

  29. Slide 29: Action Review

    KOORAGANG ISLAND CRG MEETING 28 FEBRUARY 2022 ACTION REVIEW NICOLE MASSON 29

  30. Slide 30: Actions

    Actions No outstanding actions. 30 General