Galilee Energy Limited · ASX:GLL

Galilee Energy — Investor Presentation (May 2022)

20 slides from Galilee Energy's investor presentation, May 2022

  1. Slide 1: Galilee Energy Investor Update

    Galilee Energy Investor Update May 2022 ASX: GLL

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer Disclaimer Future performance This presentation (Presentation) has been prepared by Galilee Energy Limited (ABN11 064 957 This Presentation contains certain “forward-looking statements”. Forward looking words such as, 419) (Galilee Energy or the Company). The Presenta

  3. Slide 3: Galilee at a glance

    Galilee at a glance Corporate Snapshot Share Price No of Shares $0.36 As at 29 Apr, 2022 339M GLL Share Price & Volume – 12 months Market Cap Cash (31 Mar 22) $122M $17M Debt Nil Directors Ray Shorrocks Stephen Kelemen Non-Executive Chairman Non-Executive Director David Casey Gordon Grieve Managing

  4. Slide 4: Investment highlights

    Investment highlights Glenaras is one of the largest remaining uncontracted east coast gas… resources Pathway to Multi-TCF Gas • Updated strategy to facilitate transformational value uplift and progress Galilee towards becoming a multi-TCF gas development company. Development • New 5-well drill prog

  5. Slide 5: The Prize…

    The Prize… Building a Multi-TCF Fully Integrated Energy Company 5

  6. Slide 6: Work programme for CY2022

    Work programme for CY2022 Capitalising on over $100m of previous exploration and appraisal expenditure Objectives • To accelerate depressurisation of the Betts Creek coals and adjacent sands to initiate gas desorption and achieve commercial gas production in support of a material maiden reserves boo

  7. Slide 7: The Challenge…

    The Challenge… Commercial gas production while transforming water into value adding profitable commodity 7

  8. Slide 8: New wells will enable critical desorption

    New wells will enable critical desorption Strategically locating new wells will achieve required pressure reduction… • New modelling undertaken by Schlumberger taking into account the southwestern permeability conduit fault zone has confirmed that the significant pressure sink already created, can b

  9. Slide 9: Reservoir Pressure

    High water production rates are now a positive Regional pressure monitoring proves water-bearing sands are being overcome despite fault connectivity to coals… GA10L & 12L shut-in to drill Rodney Creek 8 Reservoir Pressure new laterals Glenaras Multi-Lateral GA14L, 15L & 16L Trend Pilot Pressure Sink

  10. Slide 10: Water is an extremely valuable commodity

    Water is an extremely valuable commodity Because the water is essentially fresh high water production rates are offset by beneficial outcomes associated with irrigation and other “green” initiatives • Agreement to expand farming and irrigation area with landowners • Additional 50 ha of land to be cl

  11. Slide 11: The Programme…

    The Programme… 2022 Drilling Underway 11

  12. Slide 12: Project Update

    Project Update First well drilled on time and on budget despite unseasonal weather • Drilled to a total depth of 1,057m without issues, despite partial pressure depletion • 26m of gassy net coal • Fluid losses of 3+ bbl/hr are indicative of a permeable and pressure depleted reservoir section confirm

  13. Slide 13: The Market…

    The Market… Gas is the transition fuel of choice 13

  14. Slide 14: Australian East Coast Gas Dynamics

    Australian East Coast Gas Dynamics • Increasing influence of global LNG prices on domestic gas prices. • Current Wallumbilla Qld daily price ~A$16/GJ – a large discount to LNG netback price. • Upwards pressure on east coast prices as Gladstone LNG producers divert gas into spot LNG cargoes rather th

  15. Slide 15: Australian East Coast Gas Dynamics

    Australian East Coast Gas Dynamics Gas project fits in ESG investing, says Global Infrastructure Partners Rob Stewart, managing partner at Global Infrastructure Partners Australia, insisted the (Pluto) project compared favourably with other gas projects that are needed to smooth the global energy tr

  16. Slide 16: The Future…

    The Future… Ideally placed to address any future emission challenges 16

  17. Slide 17: Well positioned for the transition to a lower carbon future

    Well positioned for the transition to a lower carbon future Assessing viability of mini MoU with Sunshot. solar farms for early Assessing carbon development activities capture and storage and hydrogen opportunities. Building quality Evaluating gas fired relationships with power station feeding commu

  18. Slide 18: Appendices

    i ae gw s a ppendices

  19. Slide 19: Appendix – Competent Person Statement

    Appendix 1 – Competent Person Statement + Competent Person Statement and ASX Listing Rules Chapter 5 - Reporting on Oil and Gas Activities The estimate of Contingent Resources for the Glenaras Gas Project provided in this presentation, is based on, and fairly represents, information and supporting d

  20. Slide 20: Registered office and contact

    REGISTERED OFFICE Level 6, 167 Eagle Street, Brisbane QLD 4000 GPO Box 1944 Phone: +61 7 3177 9970 Email: admin@galilee-energy.com.au galilee-energy.com.au 20

Galilee Energy — Investor Presentation (May 2022) on 6ix