  1. Slide 1: Caldeira Project Pre-Feasibility Study

    ASX: MEI CALDEIRA PROJECT PRE-FEASIBILITY STUDY A globally strategic, long-life rare earths project with significant growth potential

  2. Slide 2: Agenda

    AGENDA 1 Introduction 2 Caldeira overview 3 PFS summary 4 Operational summary 5 Permitting and funding 6 Appendices

  3. Slide 3: Introduction

    1 Introduction Strictly confidential

  4. Slide 4: Disclaimer

    DISCLAIMER These materials prepared by Meteoric Resources NL (“Meteoric” or the “Company”) include The information in this announcement that relates to Mineral Resource Estimates at the Cupim forward looking statements. Forward looking statements can generally be identified by the use of Vermelho No

  5. Slide 5: Company Overview

    COMPANY OVERVIEW MEI SNAPSHOT ASX Code MEI Share Price (18/07/25) A$0.155 Shares on Issue 2,337M Market Capitalisation A$362M BOARD AND MANAGEMENT Executive Chairman Dr Andrew Tunks Executive Director Dr Marcelo de Carvalho Managing Director Mr Stuart Gale Non-Executive Director Dr Paul Kitto Non-Ex

  6. Slide 6: Investment Highlights

    INVESTMENT HIGHLIGHTS Caldeira is set to deliver lower cost MREC than hard rock peers Largest ionic clay resource Low average operating costs Low capital intensity project globally at 1.5Bt @ 2,359ppm (US$21.80/kg NdPr)1 provide that benefits from a simple TREO including 526ppm robust margins and an

  7. Slide 7: Caldeira overview

    2 Caldeira overview Strictly confidential

  8. Slide 8: The Caldeira Rare Earths Project

    THE CALDEIRA RARE EARTHS PROJECT The world’s premiere undeveloped rare earths project The most significant and advanced rare earths ionic absorption clay project outside of China Favourably located in Minas Gerais, the largest mining state in Brazil Pre-Feasibility Study completed on southern licenc

  9. Slide 9: A World-Class Deposit

    A WORLD-CLASS DEPOSIT… Scale, grade, recovery and significant exploration upside Measured and Indicated Mineral Resources of Rare Earth Ionic Absorption Clay Rare Earth deposits1 • High-grade ionic clay hosted rare earths mineralisation 3,500 • Multi-decade scale resource defined 3,000 • High metall

  10. Slide 10: …With Provincial-Scale Upside

    …WITH PROVINCIAL-SCALE UPSIDE Scope for a Northern operating hub to materially increase both mine life and production potential Stage 2: Northern processing facility • Dona Maria 1 and 2, Cupim Vermelho Norte • Total Resources of 567Mt at 2,203ppm TREO • Measured + Indicated of 281Mt at 2,426ppm TRE

  11. Slide 11: Established Regional Infrastructure

    ESTABLISHED REGIONAL INFRASTRUCTURE Project located near low-cost renewable energy infrastructure and transport and utilities corridors Water: supplied to the plant facilities by an existing dam, ~400m from the plant site Power: 100% sourced from renewable energy (hydro, solar and wind) and connecte

  12. Slide 12: PFS summary

    3 PFS summary Strictly confidential

  13. Slide 13: Caldeira PFS | Key Highlights

    CALDEIRA PFS | KEY HIGHLIGHTS Study parameters substantially refined following extensive testwork and vendor-based cost estimates Plant throughput 6Mtpa 20%1 Optimised to deliver greater return on capital Average annual Total Rare Earth Oxide (TREO) production 13,584t 40%1 Representing ~8% of the gl

  14. Slide 14: Caldeira | Summary Financials

    CALDEIRA | SUMMARY FINANCIALS Industry leading project of scale and simplicity with expansion potential • Optimised plant design with 6.0Mtpa of Key financial & cash flow Unit Spot Consensus US$110/kg Forecast capacity; 10% increase in capital costs, metrics pricing pricing NdPr pricing1 resulting i

  15. Slide 15: Caldeira PFS | LOM Physicals

    CALDEIRA PFS | LOM PHYSICALS Meteoric has high confidence in physical estimates that have undergone further refinement since the Updated Scoping Study was released in October 2024 • Together with industry-leading partners Updated Scoping Study Pre-Feasibility Study in Ausenco, ANSTO and Fremantle Ke

  16. Slide 16: Caldeira PFS | LOM Operating Margins

    CALDEIRA PFS | LOM OPERATING MARGINS Attractive operating margins above NdPr and DyTb operating costs under all pricing scenarios Annual Cost Unit Cost • PFS delivers robust financial outcomes at a Operating Costs (US$M) (US$/kg TREO) Annual Cost Unit Cost (Real LOM) (US$M) (US$/kg TREO) higher degr

  17. Slide 17: Operational summary

    4 Operational summary Strictly confidential

  18. Slide 18: Simple, Low Cost Mining Method

    SIMPLE, LOW COST MINING METHOD Mine schedule preferences higher grade ore to drive high returns and rapid payback • Mine plan ~90% backed by existing Reserves Total Ore Mined (t) 8.0Mt • No requirements for drill and blast FIG CDM SOB BDP 7.0Mt • Excavators and Trucks utilising conventional load and

  19. Slide 19: Metallurgy Unlocks Value

    METALLURGY UNLOCKS VALUE ANSTO testwork programs provide confidence and optimization of flowsheet and processing costs • Rare earth minerals extracted using a low acidity (pH 4.5 – 5) • Demonstrates process flowsheet with MREO recoveries of ammonium sulphate solution within a short cycle time (<30 7

  20. Slide 20: Forward Work Program

    FORWARD WORK PROGRAM Pilot plant being established at the Caldeira Project to support future studies and a development decision • Pilot plant to produce MREC planned to be established in Poços de Caldas ~A$2.2M 25 – 30kg/hr • Operational in the December quarter 2025 Capital cost Process capacity • O

  21. Slide 21: Assessing Downstream Options

    ASSESSING DOWNSTREAM OPTIONS Potential to fast-track the production of separated rare earths oxides and/or magnets outside of China • Several MOUs signed with credible counterparties: • MTM Critical Metals (MTM) provides framework to expand downstream processing and separation capabilities PROCESS O

  22. Slide 22: Permitting and funding

    5 Permitting and funding Strictly confidential

  23. Slide 23: Overview of the Permitting Process

    OVERVIEW OF THE PERMITTING PROCESS Meteoric continues to successfully progress through Brazil's 3-stage permitting regime 1 Submission of the Caldeira EIS Complete ▪ Comprehensive research and community consultation from mid-2023 May 2024 ▪ Includes favourable feedback from a Social Diagnosis and St

  24. Slide 24: Detailed Permitting Process Advancing

    DETAILED PERMITTING PROCESS ADVANCING Targeting mid-2026 for issuance of Construction Licence September 2023 February 2024 May 2024 July 2024 Conclusion of the EIS fields Start of Construction License Start of Environmental Studies EIS submission to the EPA survey studies (PCA) November 2025 August

  25. Slide 25: Caldeira Mine Plan Complies with the APA

    CALDEIRA MINE PLAN COMPLIES WITH THE APA There are two environmental protection areas within the municipality of Caldas 1 Law relating to mining in the environmental areas Map of the Caldeira Project ▪ The key environmental areas relevant to the Caldeira Project are the Environmental Protection Area

  26. Slide 26: Capital Costs and Funding

    CAPITAL COSTS AND FUNDING The development will be funded by a combination of ECA debt, strategic equity and listed equity Project development costs Indicative funding waterfall (US$m) • US$357m of capital for base case 6.0Mtpa development • Includes all direct and indirect costs, taxes and owner's c

  27. Slide 27: Concluding Remarks

    CONCLUDING REMARKS Caldeira stands out as the world’s premiere undeveloped rare earths project 1 The largest ionic clay resource globally with ~1.5Bt @ 2,359ppm TREO; including a high-grade maiden Ore Reserve of 103Mt @ 4,091ppm TREO 2 Low operating costs underpinned by high grades, low strip ratios

  28. Slide 28: Appendix

    Appendix Strictly confidential

  29. Slide 29: Rare Earths Supply Uncertainty

    RARE EARTHS SUPPLY UNCERTAINTY Critical minerals with strategic geopolitical importance and a market controlled by China • On 4 April 2025, China’s Ministry of Caldeira Mineral Resource by deposit (export restricted rare earths in yellow) Commerce and General Administration announced new restriction

  30. Slide 30: MREC Product Specifications

    MREC PRODUCT SPECIFICATIONS High MREO grades with low levels of impurities TREO composition Impurity composition Oxide Concentration Units REO Concentration (%) Al2O3 0.21 % La2O3 31.4 CaO 0.56 % • Low U3O8 and ThO2 levels - five batches of MREC K2O 0.017 % CeO2 0.67 produced by ANSTO piloting and t

  31. Slide 31: Maiden Ore Reserve

    MAIDEN ORE RESERVE Selectively targeting the highest-grade mineralisation to drive high returns and rapid payback Classification Tonnes (Mt) TREO ppm Pr6O11 ppm Nd2O3 ppm Cont. REO kt • Ore Reserves based solely on higher-grade Capão do Mel (CDM) material from the CDM, Figueira, Soberbo Proved - - -

  32. Slide 32: Caldeira Mineral Resource Estimate (April 2025)

    CALDEIRA MINERAL RESOURCE ESTIMATE (APRIL 2025) Licence JORC Category Material Type Tonnes Mt TREO ppm Pr6O11 ppm Nd2O3 ppm Tb4O7 ppm Dy2O3 ppm MREO ppm MREO/TREO Capão do Mel Measured Clay 11 3,888 222 586 6 28 842 21.7% Cupim Vermelho Norte Measured Clay 26 2,607 156 477 5 25 663 25.4% Total Measu

  33. Slide 33: Peer Comparison Reference Data

    PEER COMPARISON REFERENCE DATA Source data for Bubble Plot, showing IAC Deposits with reported Measured + Indicated Resources (Mt) x TREO Grade (ppm). Grade MREO Company Project Classification Resource(Mt) Cut-Off (ppm) Bubble Size Reference (ppm) (ppm) Serra Verde Pela Ema Measured + Indicated 390