Bearing Lithium — Investor Presentation (January 2018)
29 slides from Bearing Lithium's investor presentation, January 2018
Slide 1: Advancing Chile's Highest-Grade Pre-Production Lithium Brine Project
ADVANCING CHILE’S HIGHEST-GRADE PRE- PRODUCTION LITHIUM BRINE PROJECT CORPORATE PRESENTATION January 2018 TSX-V:BRZ OTCQB:BRGRF
Slide 2: Disclaimer
DISCLAIMER This presentation includes certain "forward-looking information” and "forward-looking statements” (collectively "forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform
Slide 3: Maricunga Project Overview
MARICUNGA PROJECT Overview Bearing’s primary asset is a 17.7% interest in the Maricunga lithium project in Chile, which is free-carried through pre-development costs by the earn-in partner. Over US$30 million has been invested in the project to date. The Maricunga Project is the highest grade, undev
Slide 4: Market Comparables
MARKET COMPARABLES Attractively Positioned Relative to Peers M.Cap Resource Company Ticker Primary Project Stage C$M (mg/L Li) Orocobre Limited TSX:ORL 1,764 Olaroz Producing 690 Lithium Americas Corp. TSX:LAC 752 Cauchari Construction 585 Bearing Lithium Ltd. TSXV:BRZ 43 Maricunga PEA 1,160 Millenn
Slide 5: Preliminary Economic Assessment Highlights
MARICUNGA PROJECT Preliminary Economic Assessment Highlights The preliminary economic analysis (PEA) is based on the following assumptions: Construction commencing in 2019 with first production in 2022 All numbers based on a constant U.S. dollar basis Assume full equity project funding (BRZ ownershi
Slide 6: CAPEX & OPEX
MARICUNGA PROJECT CAPEX & OPEX Accuracy of operating and capital cost estimates expected within a +/- 25% range Development cost estimated at US$366M excluding potash plant, plus indirect costs of 14.2% (US$55M) and 18.6% (US$83M) contingency Operating cost of US$2,938/t LCE and declining to US$2,63
Slide 7: Highest Grade Undeveloped Lithium Project
MARICUNGA PROJECT Highest Grade Undeveloped Lithium Project Hombre Los Tres Sal De Silver Clayton Pastos Maricunga¹ Atacama² Olaroz⁴ Cauchari⁵ Cauchari⁶ Rincon⁹ Uyuni¹¹ Mariana¹⁵ Muerto³ Angeles⁷ Quebradas⁸ Vida¹⁰ Peak¹² Valley¹³ Grandes¹⁴ Country Chile Chile Argentina Argentina Argentina Argentina
Slide 8: Joint Venture Development Timeline
MARICUNGA PROJECT Joint Venture Development Timeline 8
Slide 9: Updated Resource Estimate (NI 43-101)
MARICUNGA PROJECT Updated Resource Estimate (NI 43-101) M&I Resource has tripled in size while adding a significant Inferred Resource and maintaining high grades M&I Resource of 1.72 Mt of lithium carbonate (Li₂CO₃) plus Inferred Resource of 0.43 Mt Li₂CO₃ Brine Volume Concentration Concentration Co
Slide 10: Future Growth Potential
MARICUNGA PROJECT Future Growth Potential Resource estimate includes all concessions down to a depth of 200 metres Potential for significant growth below 200 metres as evidenced by hole S-19 which terminated in high-grade brine assaying 877 mg/L Li Geophysical & seismic surveys indicate the basin ex
Slide 11: Salar Characteristics & Geological Model
MARICUNGA PROJECT Salar Characteristics & Geological Model Halite, gravel, sand and volcaniclastic sediments have excellent drainable porosity and Drainable Geological Model permeability characteristics Porosity Pumping confirms the high flow rate characteristics of the sediments, which have a high
Slide 12: Extremely High Flow Rates from Pump Testing
MARICUNGA PROJECT Extremely High Flow Rates from Pump Testing Flow rates from pump testing at the Maricunga project are highly encouraging as they rank amongst the highest reported values compared to other projects in South America 12
Slide 13: Project Infrastructure
MARICUNGA PROJECT Project Infrastructure Evaporation ponds – off salar to the north to allow for easier construction in areas of gravel & minimize visual impact Process Plant Wellfield & pipelines to evaporation ponds Electricity supply & transmission lines – multiple options including accessible 23
Slide 14: Port & Logistic Assessment
MARICUNGA PROJECT Port & Logistic Assessment 14
Slide 15: Tenement Map & Potential for Consolidation
MARICUNGA PROJECT Tenement Map & Potential for Consolidation The Maricunga salar is located in northern Chile with excellent infrastructure: adjacent to International Highway 31 (which connects northern Chile & Argentina) with grid power accessible to the east. The project is located close to critic
Slide 16: Joint Venture Structure
MARICUNGA PROJECT Joint Venture Structure All the tenements / concessions are held by the Maricunga Joint Venture company (Maricunga JV). Under the terms of the joint-venture, Minera Salar Blanco (MSB) and Bearing (BRZ) are free carried with Lithium Power International (LPI) funding all expenditures
Slide 17: Chilean Mining Law
CHILEAN MINING LAW Special Circumstances Around Lithium Lithium is considered “strategic” in Chile and therefore it is a non-concessible substance. Only mining exploitation concessions initiated before 1979 are authorized for the exploitation of lithium. These are referred to as “old code” or grandf
Slide 18: Management Team
MANAGEMENT TEAM Knowledgeable, Experienced, Proven Jeremy Poirier | President, CEO & Director Mr. Poirier has over 12 years of experience in the capital markets including co-founding Pure Energy Minerals (TSXV:PE) and holding several senior management roles and Board positions. Benjamin Asuncion | V
Slide 19: JV Management & Technical Advisors
JV MGMT & TECHNICAL ADVISORS Vast Experience in Lithium Brine Deposits in South America Cristóbal García-Huidobro — CEO, MSB Frits Reidel, CPG — Qualified Person under TSX NI 43- A civil engineer with over 18 years of experience developing and financing 101 Standards projects within the mining, ener
Slide 20: Bearing Capitalization
BEARING CAPITALIZATION Capital Structure & Financial Position 2.00 2.00 Volume Price 1.50 1.50 Share Price (C$) Volume (M) 1.00 1.00 0.50 0.50 - - Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 20
Slide 21: Contact Information
CONTACT INFORMATION Jeremy Poirier | President & CEO (604) 262-8835 jpoirier@bearinglithium.com TSX-V:BRZ OTCQB:BRGRF
Slide 22: Appendix: Lithium Market Overview
Appendix Lithium Market Overview
Slide 23: The Lithium Market: Global Lithium Supply
THE LITHIUM MARKET Global Lithium Supply Source: VisualCapitalist 23
Slide 24: The Lithium Market: Pricing & Applications
THE LITHIUM MARKET Lithium Pricing & Applications Source: Data provided by Benchmark Mineral Intelligence and compiled by VisualCapitalist Source: VisualCapitalist Source: VisualCapitalist 24
Slide 25: China Leading the Battery Charge
THE LITHIUM MARKET China Leading the Battery Charge – Megafactories to Grow 6x by 2020 Source: Data provided by Benchmark Mineral Intelligence and compiled by VisualCapitalist 25
Slide 26: Lithium Demand Composition & Growth Drivers
THE LITHIUM MARKET Lithium Demand Composition & Growth Drivers Source: VisualCapitalist 26
Slide 27: Automakers Outline EV Growth Plans
THE LITHIUM MARKET Automakers Outline EV Growth Plans Volvo, Betting on Electric, Moves to Phase Out Conventional Engines • All new models introduced starting in 2019 will be either hybrids or pure electric VW says it needs '40 gigafactories' for electric-car batteries by 2025 • Based on production
Slide 28: Appendix: Project Details
Appendix Project Details
Slide 29: High Grade Results from Latest Drilling
MARICUNGA PROJECT High Grade Results from Latest Drilling Assay results from ‘old code’ tenements are highly encouraging: demonstrating grades consistent with or better than observed in the Litio concession (which is host to the current M&I resource). Total Assay Lithium Potassium Lithium Hole Tenem
Bearing Lithium — Investor Presentation (January 2018) on 6ix