Dragonfly Energy Holdings Corp · NASDAQ:DFLI
Dragonfly Energy — Q1 2026 Earnings Presentation
14 slides from Dragonfly Energy's earnings presentation, May 14, 2026
Slide 1: Quarterly Earnings Update | Q1 2024
Quarterly Earnings Update | Q1 2024 May 14, 2024 Nasdaq: DFLI
Slide 2: Legal Disclaimer
Legal Disclaimer This corporate presentation (this “Presentation”) has been prepared for use by Dragonfly Energy Holdings Corp. (“Dragonfly Energy” or the “Company”). This Presentation is for information purposes only and may not be reproduced or redistributed, in whole or in part, without the prior
Slide 3: Q1 2024 Highlights & Results
Q1 2024 Highlights & Results Q1 2024 Financial Results Q1 2024 Highlights Snapshot Medium & Heavy Duty Trucking • Company has begun taking purchase orders for its Battle Born® All-Electric APUs and Battle Born® Liftgate Power Systems from trucking providers and fleet operators Net Sales Gross Profit
Slide 4: CEO quote on Dragonfly Energy's growth opportunities
“I am incredibly excited about where Dragonfly Energy stands right now as a company and our opportunities for growth over the long-term. Combining a valuable brand, a robust intellectual property portfolio, a recovering core market, and the potential for rapid expansion into significant adjacent mar
Slide 5: Medium & Heavy Duty Trucking Market Update
Medium & Heavy Duty Trucking Market Update Customers Taking Purchase Orders Pilot programs in progress with fleets representing over 15% of the North and/or Undergoing Pilot Tests Today American Heavy Duty Trucking Market. + More Products & Applications Battle Born® Battle Born® All-Electric APU Lif
Slide 6: Recreational Vehicle Market Update
Recreational Vehicle Market Update Dragonfly Energy's Battle Born Batteries® have established a significant presence in the market, particularly within the RV industry. Dragonfly Energy’s Batteries Are Factory Installed by a High Percentage of Major RV Manufacturers: Thor Industries, Inc. | ~34% Mar
Slide 7: Research & Development
Research & Development General Update Dragonfly Energy has made significant progress in optimizing auxiliary unit operations associated with cell manufacturing – specifically ageing, formation, and end-of-line testing. With the dry electrode process at pilot scale, we are now focusing our efforts on
Slide 8: Formation & Early Life Cycle + Cycle Longevity
R&D Data Formation & Early Life Cycle + Cycle Longevity Formation & Early Life Cycle Keeping chemistry constant but manipulating soaking, formation, and aging, yield different results. By altering the time, temperature, and current density, we can improve a cell’s first-cycle coulombic efficiency an
Slide 9: Quality Control: High Capacity (~25mg/cm²)
R&D Data | PFAS-Free Quality Control: High Capacity (~25mg/cm²) Anode Dragonfly Energy’s dry electrode process reduces the electrical resistivity of electrode tapes. This remains consistent even when comparing high-capacity electrodes (~4.5mAh/cm2) to standard capacity (~2.5mAh/cm2) industry slurry
Slide 10: Quality Control: High Capacity (~25mg/cm²)
R&D Data | PFAS-Free Quality Control: High Capacity (~25mg/cm²) Adhesion tests demonstrate the general construction quality of electrode Dragonfly Energy’s dry electrode process improves active material adhesion to the current collectors by encouraging a more uniform distribution of polymer thro
Slide 11: Quality Control: High Capacity (~25mg/cm²)
R&D Data | PFAS-Free Quality Control: High Capacity (~25mg/cm²) Dragonfly Energy’s dry electrode process is capable of yielding quality electrode tapes that meet industry porosity standards of 20% - 40% porosity It is easily achievable to manufacture electrodes that are more or less dense during
Slide 12: Electrochemical Testing: Half Cells
R&D Data | PFAS-Free Electrochemical Testing: Half Cells Dragonfly Energy High Capacity vs Industry Standard Capacity >90% FCE >99.9% CE >19 Cycles above 99% capacity retention All cells tested are single layer coin cells All cells were cycled at a 0.1C lithiation and 0.1 delithiation Cells te
Slide 13: Electrochemical Testing: Half Cells
R&D Data | PFAS-Free Electrochemical Testing: Half Cells Dragonfly Energy High Capacity vs Dragonfly Energy Standard Capacity >90% FCE >99.9% CE >25 Cycles above 99% capacity retention All cells tested are single layer coin cells All cells were cycled at a 0.1C lithiation and 0.1 delithiation
Slide 14: Quarterly Earnings Update | Q1 2024
Quarterly Earnings Update | Q1 2024 May 14, 2024 Investor Relations Caldwell Bailey, ICR Inc. dragonflyIR@icrinc.com 775-221-8892 Nasdaq: DFLI
Dragonfly Energy Holdings — Q1 2026 Earnings Presentation on 6ix