Vhm Limited · ASX:VHM

Vhm — RIU Explorers Conference 2025

16 slides from Vhm's conference presentation, February 2025

  1. Slide 1: Staged Expansion to Critical Minerals Production

    Staged Expansion to Critical Minerals Production RIU Explorers Conference | February 2025 ASX:VHM

  2. Slide 2: Disclaimer and forward-looking statements

    Disclaimer and forward-looking statements Important Information Forward-looking statements are based on numerous assumptions regarding VHM Limited’s present and future business strategies and the environment in which VHM Limited will operate in the future. Among the important factors that could caus

  3. Slide 3: Key highlights

    Key highlights Tier 1 rare earth and minerals sands project with globally significant mineral assemblage​​ 1 Advanced Approvals: Endorsement of the Environment Effects Statement received 10 December 2024; mining licence and secondary approvals to follow 2 Clear pathway to near-term production: Produ

  4. Slide 4: Corporate overview

    Corporate overview Market Cap1 Top 20 Board Shareholders GOSCHEN PROJECT3 A$71.66 million 98.8Mt ORE @ 4.0% THM Zircon 23.6%, Rutile 9.9%, Mon 3.7%, Xen 0.7% 34% Ian Smith Ron Douglas Don Runge Maree Arnason Colin Moorhead BEng Mining BE, FAIM, BEng Mining, Share Price Cash2 (Honours), FAusIMM, MAIC

  5. Slide 5: Province overview

    Province overview Location: • Northwestern Victoria GOSCHN PROJECT3 • Infrastructure rich (rail, roads, power and 98.8Mt ORE @ 4.0% THM water) Zircon 23.6%, Rutile 9.9%, Mon 3.7%, Xen 0.7% • Two major regional towns nearby CANNIE PROJECT4 Reserve / Resource 1 : 192Mt MRE @ 3.1% THM, • 210Mt Ore Rese

  6. Slide 6: Staged development approach

    Staged development approach1 Goschen project key highlights Key project statistics Stage 1 (Year 1-3) Stage 2 (Year 4+) Mine throughput 1.5Mtpa 5Mtpa • First to production advantages Construction commences Q4 2025 Q4 2028 Forecast first production Q4 2026 Q4 2029 • Defined pathway Total HM 7.2% 3.8%

  7. Slide 7: Accelerating Goschen towards production

    Accelerating Goschen towards production Extensive development works complete Phase I Phase II 7

  8. Slide 8: Funding strategy and offtake

    Funding strategy and offtake Multifaceted funding strategy comprising debt, equity and government funding Goschen project funding Concentrate offtake strategy Debt Equity Partially committed offtake agreement in place for first 3 years – strategy for balance Commercial BanksDEBT EQUITY Strategic Par

  9. Slide 9: Rare earths driving the energy transition

    Rare earths driving the energy transition Increasing demand needs to be met via geographical diversification Multiple end uses 32% Electric vehicles 28% Wind turbines and industry motors 14% Mobile phones and other communication devices 12% Laptops and digital cameras 10% Electromagnetic relay elect

  10. Slide 10: Urbanisation has a long way to go

    Urbanisation has a long way to go Forecasted demand Zircon Forecast demand for Zircon sands by region • Premium Zircon prices have remained relatively stable at ~US$2,000/tonne • TZMI expects long-term global zircon demand to grow at 2.6% per annum with India, the Americas and other Asia Pacific mar

  11. Slide 11: Strategically important Victorian rare earth and minerals sands project

    Strategically important Victorian rare earth and minerals sands project The Goschen Project will be a multi-generational rare earths and mineral sands asset for Australia Ability to create a Victorian rare earths supply 1 chain through potential strategic partnerships and offtakes 2 Support local in

  12. Slide 12: Appendix A. JORC Tables

    (oD oe &S VHM Limited Appendix A. JORC Tables

  13. Slide 13: Company Mineral Resources

    Company Mineral Resources 892.1 Mt Mineral Resource estimate Notes: Any discrepancies in totals are a function of rounding. 1. Mineral resources reported at a cut-off grade of 1.0% THM. 2. Mineral resources reported at a cut-off grade of 1.75% THM. 3. Mineral resources reported at a cut-off grade of

  14. Slide 14: Company Ore Reserves

    Company Ore Reserves 210.2Mt Ore Reserve Note: (1) Any discrepancies in totals are a function of rounding. THM Assemblage and Rare Earth Oxides are reported as a percentage of in-situ THM content. The Ore Reserve was updated and disclosed under the JORC Code (2012) in the ASX release published 29 Se

  15. Slide 15: Goschen DFS Ore Reserve

    Goschen DFS Ore Reserve 98.8Mt Ore Reserve – Subset of global Company Ore Reserves Note: (1) Any discrepancies in totals are a function of rounding. THM Assemblage and Rare Earth Oxides are reported as a percentage of in-situ THM content. The Ore Reserve was disclosed under the JORC Code (2012) in t

  16. Slide 16: For further information contact

    Level 11, 330 Collins Street, Victoria 3000 vhmltd.com.au For further information contact: Ron Douglas Chief Executive Officer Ron.Douglas@vhmltd.com.au

VHM — RIU Explorers Conference 2025 on 6ix