Teck Resources Limited Class A · TSX:TECK.A
Teck Resources Limited Class A — CRU World Copper Conference (April 2017)
11 slides from Teck Resources Limited Class A's conference presentation, Apr 5, 2017
Slide 1: Advancing Projects in a Volatile Market
Advancing Projects in a Volatile Market Don Lindsay, President & CEO, Teck April 5, 2017
Slide 2: Forward Looking Information
Forward Looking Information Both these slides that you will be presented today and the accompanying oral presentations contain certain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meanin
Slide 3: About Teck
About Teck • Diversified commodities: copper, zinc, steelmaking coal, energy • Operations in Canada, U.S., Chile and Peru • 14.1 Mt of contained copper in proven & probable reserves • Long life assets in low risk, stable jurisdictions 3
Slide 4: Copper Demand
Copper Demand 4
Slide 5: Chinese Copper Demand to Remain Strong
Chinese Copper Demand to Remain Strong Highlights: 5YR Plan: Potential Growth Across Sectors • China 5YR Plan = 282 500kt copper demand 300 growth per year to 2020 250 202 200 Ktpa • Up to US$450 billion 150 investment in power 100 71 48 19 grid 50 21 -7 -75 0 • Target of 5 million -50 Electric Vehi
Slide 6: Long-Term Copper Mine Production Still Needed
Long-Term Copper Mine Production Still Needed Mine Production Peaks in 2019 • 2.1% global demand growth = 30,000 ~520kt new supply needed 28,000 annually 26,000 24,000 Thousand Tonnes • Mine production falls ~230kt 22,000 per year after 2019, creating 20,000 structural deficit 18,000 16,000 14,000 •
Slide 7: Factors for Successful Projects
Factors for Successful Projects Capital Efficiency Innovative Partnerships Strong Relationships 7
Slide 8: Quebrada Blanca Phase 2
Quebrada Blanca Phase 2 “Pre-stripped” results in lowers costs 300ktpa in first five years Initial mine life 25 years with expansion potential Development capital costs reduced significantly Mining-friendly jurisdiction, existing community relationships 8
Slide 9: NuevaUnión: Before: Duplicate Infrastructure
NuevaUnión Before: Duplicate Infrastructure Pipelines Power Lines Port Pipelines: Water & Desalination Concentrate El Morro Tailings Port Site Desalination Power Tailings Power Pipelines: Water Relincho Site Mine and Mill Mine and Mill Source: “Project Location.” -28.395839, -70.486738, 4679ft. Goog
Slide 10: NuevaUnión: After: Common Infrastructure
NuevaUnión After: Common Infrastructure Pipeline Power Line Conveyor & Utilities Road Desalination Tailings Port Power Pipelines: Water Mine and Mill Conveyor & Utilities Mine Source: “Project Location.” -28.395839, -70.486738, 4679ft. Google Earth. February 8, 2015. April 23, 2015. 10
Slide 11: Summary
Summary Teck
Teck Resources — CRU World Copper Conference (April 2017) on 6ix