Santos Limited · ASX:STO
Santos — Technical Presentation (March 2024)
18 slides from Santos's technical presentation, March 2024
Slide 1: Keraudren Extension Phase 3 3D Marine Seismic Survey Environment Plan
Information for relevant persons Keraudren Extension Phase 3 3D Marine Seismic Survey (MSS) Environment Plan Activity overview Consultation and feedback Santos is seeking to acquire All petroleum activities in Santos meets this requirement by subsurface data via a 3D Commonwealth waters must underta
Slide 2: Activity description
Activity description Activity details Timing A single survey will be undertaken in either 2026, 2027 or 2028. Activity timing will be between 1 February and 30 June. Duration The proposed survey duration is 40 days (including contingency). Water depth Operational area 33-138 m. Active source area 33
Slide 3: About marine seismic surveys
About marine seismic surveys The process of collecting seismic data is known as ‘acquisition’. A marine seismic survey takes place along a series of pre-defined acquisition lines (normally several hundred metres apart) within an overall acquisition area. Marine seismic surveys are carried out by spe
Slide 4: Defining the environment area for proposed activities
Defining the environment area for proposed activities Santos has undertaken an of worst-case marine diesel spill While the EMBA represents the assessment to define the resulting from a vessel collision largest possible spatial extent environmental, social, economic (see Figure 3). that could be cont
Slide 5: Environmental, social, economic and cultural features
Environmental, social, economic and cultural features Santos have undertaken a review of publicly available information to identify environmental, social, economic and cultural features and/or values that may be affected by activity impacts and risks. The outcomes of this review are summarised in Ta
Slide 6: Environmental, social, economic and cultural features (continued)
Table 2. Environmental, social, economic and cultural features ... continued Feature Description Within Within Public information review Operational EMBA Area Defence Designated defence activity areas. No Yes Defence activities may take place within the EMBA, which contains both practice and trainin
Slide 7: Environmental, social, economic and cultural features (continued)
Table 2. Environmental, social, economic and cultural features ... continued Feature Description Within Within Public information review Operational EMBA Area Oil and gas Petroleum operations. No Yes The area of the North West Shelf (NWS) is a major operations oil and gas hub in Australia, with seve
Slide 8: Environmental, social, economic and cultural features (continued)
Table 2. Environmental, social, economic and cultural features ... continued Feature Description Within Within Public information review Operational EMBA Area Tourism Marine and coastal tourism. No Yes Santos was advised during consultation for the previous Keraudren 3D MSS that there is no offshore
Slide 9: Activity impacts and risk management
Activity impacts and risk management We have summarised in Table 3 the potential environmental impacts and risks and associated management measures for the proposed activity. These aspects will be risk-assessed with the Environment Plan on a case-by-case basis. Table 3. Activity impacts and risk man
Slide 10: Noise emissions
Table 3. Activity impacts and risk management ... continued Noise emissions Description of potential impacts Compliance with the following key management measures Potential impacts from noise emissions may occur in the operational area • Implementation of EPBC Policy Statement 2.1 (Part A) to cetace
Slide 11: Cumulative and additive noise impacts
Table 3. Activity impacts and risk management ... continued • Commercial fishery claims - Should commercial fishers be displaced from their normal fishing areas because of the physical presence of the seismic vessel or fishers incur damage to fishing equipment by the seismic vessel then an assessmen
Slide 12: Planned operational discharges
Table 3. Activity impacts and risk management ... continued Planned operational discharges Description of potential impacts Compliance with the following key management measures Planned discharges from the vessel in the operational area may include: • Waste management onboard the vessels will be und
Slide 13: Marine diesel oil release from vessel collision
Table 3. Activity impacts and risk management ... continued Potential risks - unplanned activities Marine Diesel Oil (MDO) release from vessel collision (surface) Description of potential risks Compliance with the following key management measures Potential release of MDO may occur in the operationa
Slide 14: Minor hydrocarbon release
Table 3. Activity impacts and risk management ... continued Minor hydrocarbon release Description of potential risks Compliance with the following key management measures Sources of risk from an accidental minor release of hydrocarbons may occur • MARPOL compliant fuel oil (MDO/MGO) will be used dur
Slide 15: Spill response management measures
Table 3. Activity impacts and risk management ... continued • Conduct shoreline/nearshore habitat/bathymetry assessment prior to nearshore operations. • Establish demarcation zones for vehicle and personnel movement considering sensitive vegetation, bird nesting and roosting areas and turtle nesting
Slide 16: Unplanned hazardous and non-hazardous discharges – solid
Table 3. Activity impacts and risk management ... continued Unplanned hazardous and non-hazardous discharges – solid Description of potential risks Compliance with the following key management measures Sources of risk from an accidental release of hazardous and non-hazardous • Equipment maintenance
Slide 17: Introduction of Invasive Marine Species
Table 3. Activity impacts and risk management ... continued Introduction of Invasive Marine Species (IMS) Description of potential risks Compliance with the following key management measures Introduction of invasive marine species (IMS) may occur due to: • Aquatic Biosecurity Solution vessel check t
Slide 18: Consultation and providing feedback
Consultation Consultation provides Santos with an opportunity to receive feedback from authorities, persons and organisations whose functions, interests or activities may be affected by the proposed activities. This feedback helps us to refine or change the management measures we are planning to add