Impact Silver Corp. · TSXV:IPT
Impact Silver — Investor Presentation (November 2015)
32 slides from Impact Silver's investor presentation, November 2015
Slide 1: November 2015 Corporate Presentation
hy ZH > Om AN IMPACT Ss ILV ESR CORP TSX.V : IPT November 2015 CORPORATE PRESENTATION
Slide 2: Cautionary Statements
Cautionary Statements Forward-Looking Statements: This presentation may contain certain “forward-looking” statements and information relating to IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such st
Slide 3: Overview
Overview SILVER IMPACT Silver has been a steady silver producer since 2006 with low cost operations on PRODUCTION one large property covering two silver districts in central Mexico. NEW HIGHER In response to lower silver prices, mining is successfully transitioning to new higher grade GRADE SILVER s
Slide 4: Directors & Management
Directors & Management Frederick W. Davidson, CA President, CEO, Director President of IMPACT Silver and Energold Drilling Corp. Over 33 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. George Gorzynski, P. Eng. VP Explorat
Slide 5: Property Description
Property Description • 100% owned and operated large 357 km² (35,700 ha) mineral concession package in south-central Mexico. • Two contiguous mineral districts with long history of silver mining and nascent gold mining. • A 3.5 hour drive southwest from Mexico City, with paved road access to the gat
Slide 6: Prolific Mining History
Prolific Mining History • The Royal Mines of Zacualpan is one of the oldest mining districts in the Americas, with nearly 500 years of recorded mining history • IMPACT’s large land package has a long history Nombre de Dios La Cadena of silver mining and recently began a new era El Calvario with the
Slide 7: Mines and Processing Plants
Mines and Processing Plants • Two Processing Plants and multiple mines • The 500-tpd Guadalupe Production Center is the main production facility which receives mineral from three underground mines located within close proximity: • Cuchara-Oscar Silver Mine • San Ramon Silver Mine • Mirasol Silver Mi
Slide 8: One Property - Two Processing Plants
One Property - Two Processing Plants GUADALUPE PRODUCTION CENTRE (500 TPD) CAPIRE PILOT PLANT (200 TPD) 8
Slide 9: One Property - Three Producing Mines
One Property - Three Producing Mines San Ramon Cuchara-Oscar Mirasol Began production in 2004; High grade Began production in 2013 Began production in Q2/2014 epithermal silver veins Corridor of epithermal veins linking new High grade epithermal silver veins Currently expanding production on new and
Slide 10: San Ramon Deeps New High Grade Silver Mine
San Ramon Deeps New High Grade Silver Mine • Recent drilling has been outlining a new deep high grade silver zone SAN RAMON at the San Ramon Mine – the UPPER (OLD MINE) Open for expansion San Ramon Deeps Zone • Recent mining is averaging SAN RAMON DEEPS 247g/t Silver (mining diluted (NEW MINE) grade
Slide 11: Big Exploration Upside
Big Exploration Upside • Exploration continues to evaluate the 4,000+ historic mine workings located on hundreds of mapped veins (red lines on Area 1 map) indicating an extensive mineralizing system Area 4 • Area 1: Brownfields exploration for silver veins within close trucking distance to the Guada
Slide 12: Alacran Deeps Drill Target
Area 1: Alacran North Exploration Area • Numerous drill targets are being developed on veins with high silver and Guadalupe Mine >>10M oz Ag gold assays located between two large historic production historic Mines Drill Targets • The Guadalupe Mine to the north Alacran Deeps Drill Target Guadalupe D
Slide 13: Area 2: San Pablo North Exploration Area
Area 2: San Pablo North Exploration Area • Early stage exploration has discovered numerous old mines and old processing plants • These old mines are Old mines Mines being opened and sampled to develop Old Processing Plants drill targets • Further work is planned in this high High Discovery potential
Slide 14: Area 3: Capire Mine and Plant
Area 3: Capire Mine and Plant Area of 2011 N Open-pit Mineral Inventory 200 tpd pilot plant Expansion area 3D model of for 2015 planned mineral open-pit resource report Mill Tailings facility Capire open-pit Mine and Pilot Plant on VMS Capire open-pit 3D model Silver –Lead-Zinc Deposit (currently on
Slide 15: Capire Drill Highlights
Capire Drill Highlights Drill Hole From (m) To Interval Ag (g/t) Au (g/t) Pb Zn Cu (m) (m) (%) (%) (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13 C12-21 83.35 110.10 16.75 153 0.40 1.14 2.71 0.21 i
Slide 16: Geology of Epithermal Vein Systems
Geology of Epithermal Vein Systems Metal Level in Producing Mines Metal Zoning in Mineral Shoots Strike Length Depth 150 – 1200 m (500 – 4,000 ft) Surface – 0 m (0 ft) Mirasol Zone Silver-rich at top of vein 150 – 1,000+ g/t Silver San Ramon Mine Deeps 150 m (500 ft) Cuchara-Oscar Mine Lead and Zinc
Slide 17: Area 4: Carlos Pacheco / San Juan Gold-Copper Zone
Area 4: Carlos Pacheco / San Juan Gold-Copper Zone • Test mining of gold and metallurgical testing of copper carried out at Carlos Pacheco South in 2014 • Drilling in 2013-14 began outlining the larger San Juan Gold- Copper Zone • The Zone remains open for expansion to depth with additional drilling
Slide 18: Rapid Exploration To Mine Development
Rapid Exploration To Mine Development A cornerstone of IMPACT’s success has been rapid mine development to increase mill throughput and generate near-term cash flow – drilling to production typically in <24 months EXPLORATION AND MINE DEVELOPMENT PROCESS FLOWCHART: RESEARCH FIELD WORK MINE DRILLING
Slide 19: Production Summary
Production Summary Production Highlights Q3 2015 YTD 2015 YE 2014 YE 2013 YE 2012 Silver-Focused Producer Silver production (oz) 276,978 716,319 725,733 682,526 620,515 Revenue Breakdown by Metals (2014) Gold production (oz) 123 384 989 1,269 629 Average mill head grade 159 214 195 158 138 (silver g
Slide 20: Financial Highlights
Financial Highlights (CDN$000’000’s except EPS) Q3 2015 YTD 2015 YE 2014 YE 2013 YE 2012 Revenues $4.11 $10.75 $12.0 $14.1 $15.9 Operating expenses $3.23 $9.38 $12.0 11.4 $10.3 Mine operating earnings (loss)* $0.29 ($0.26) ($0.0) $2.7 $5.6 EBITDA $0.65 $0.02 ($2.1) ($4.6) $1.6 Net earnings (loss) ($
Slide 21: Corporate Summary (TSX.V: IPT)
Corporate Summary (TSX.V: IPT) All prices in Canadian Dollars As of September 30, 2015 1-Year Chart Summary Common shares – Issued & Outstanding 68.1 M Fully Diluted 73.0 M Share Price $0.14 52wk Range $0.14 - $0.39 3 Month Average Daily Volume 40,016 Shares Market Capitalization $9.5M Insider and I
Slide 22: Plans for Growth
Plans for Growth • TRANSITIONING TO HIGHER GRADE PRODUCTION & EXPANSION THROUGH DRILLING • Ramp up production at Cuchara-Oscar Mine (Done) • Expand high grade silver tonnage and production at San Ramon Deeps (Continuing) 2015 • Ramp up higher grade silver production at Mirasol Mine (Continuing) • Dr
Slide 23: The Road to Growth
The Road to Growth 1. Growth through incremental Production Silver production is increasing quarter on quarter due to mining of higher silver grades 2. Growth through Underground Development Improvement of underground access at San Ramon will allow more rapid mining of silver from the wide and h
Slide 24: Contact Us
Contact Us IMPACT Silver Corp. TSX-V: IPT Frankfurt: IKL Telephone 1-604-681-0172 Fax 1-604-681-6813 Email inquiries@impactsilver.com Investor Relations Manager Jerry Huang MBA Website www.IMPACTSilver.com Twitter @IMPACT_Silver Suite1100 - 543 Granville Street Corporate Address Vancouver, BC, Canad
Slide 25: Appendix I: Capire Drilling Highlights
Appendix I: Capire Drilling Highlights A Selection of Capire Drill Highlights To Interval Pb Zn Cu Drill Hole From (m) Ag (g/t) Au (g/t) (m) (m) (%) (%) (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.
Slide 26: Appendix II: Mirasol Drilling Highlights
Appendix II: Mirasol Drilling Highlights A Selection of Mirasol Drill Highlights To True Width Pb Zn Drill Hole Vein Name From (m) Ag (g/t) Au (g/t) (m) (m) (%) (%) Z12-71 Mirasol Central 73.9 82.9 8.94 183 0.030 0.07 0.14 including Mirasol Central 75.2 82.4 7.15 216 0.040 0.08 0.16 Z12-79 Mirasol A
Slide 27: Appendix III: Cuchara-Oscar Drilling Highlights
Appendix III: Cuchara-Oscar Drilling Highlights A Selection of Cuchara-Oscar Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z11-46 92.10 97.75 5.65 1,007 0.07 0.50 1.1 including 96.70 97.75 1.05 4,580 0.26 1.70 4.0 and 108.95 111.70 2.75 1,128 0.51 0.90 1.4
Slide 28: Appendix IV: Carlos Pacheco Drilling Highlights
Appendix IV: Carlos Pacheco Drilling Highlights A Selection of Carlos Pacheco Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29 including Top of intercept - 85.74 1.0 49.7 59 0.31 Z12-13 192.30 199.00 6.70 3.84 28 0.54
Slide 29: Appendix V: San Juan Project Drilling Highlights
Appendix V: San Juan Project Drilling Highlights A Selection of San Juan Project Area Drill Highlights Drill Hole Vein Name From (m) To (m) True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Cu(%) Z13-42 Carlos Pacheco 119.30 128.60 9.02 21.3 3.894 0.98 3.28 0.11 including Carlos Pacheco 127.65 128.60 0
Slide 30: Appendix VI: Condesa (Cuchara) Drilling Highlights
Appendix VI: Condesa (Cuchara) Drilling Highlights A Selection of Condesa (Cuchara) Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z12-39 167.30 171.00 3.70 312 0.029 0.27 0.90 Z12-42 136.00 139.78 3.78 214 0.269 0.15 0.37 Z12-45 177.90 179.00 1.10 1,655 0.0
Slide 31: Appendix VII: San Ramon Deeps Drilling Highlights
Appendix VII: San Ramon Deeps Drilling Highlights A Selection of San Ramon Deeps Drilling Highlights Drill Hole Vein True Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) SR14-01 San Ramon HW2 6.57 393 0.20 0.50 1.64 Including 1.79 1,163 0.63 1.36 4.66 SR14-02 San Ramon HW2 1.65 545 0.18 0.25 1.05 San Ramo
Slide 32: b-As-109b Man...
b-As-109b Man... | Candie 50 sults +t luke 3 20, 1999 [1:5] Scale: Linear | Leg Sep-15 jot. wil P (1531) Mail: Inbox x| + for: Sie: ML +f 49 & MA Nov h li L ALA tu 0.0 015-015 ~ AAA AAA Home | Insert Design —_Transitions SlideShow Review View % 3S Buyout ~ a | “hs *|A A 23 Bypeset New I s AY. Aa | A
IMPACT Silver — Investor Presentation (November 2015) on 6ix