Yangarra Resources Ltd. · TSX:YGR
Yangarra Resources — Investor Presentation (May 2018)
19 slides from Yangarra Resources's investor presentation, May 2018

Slide 1: Corporate Presentation
Corporate Presentation May 2018 TSX: YGR TSX: YGR

Slide 2: Corporate Snapshot
Corporate Snapshot Capitalization Reserves and Locations (2) Ticker TSX: YGR NPV10 NAV(3) / FD Recycle December 31, 2017 mmboe ($mm) Share Ratio(4) Shares Outstanding (mm) Proved Developed 12.0 $204 $1.38 2.1x Basic 85.3 Total Proved 55.9 $722 $7.18 2.7x Options (weighted avg. price $3.66) 7.8 Prove

Slide 3: The Team
The Team Management Team Jim Evaskevich, President & CEO Randall Faminow, VP, Land 30+ years extensive executive experience with strong 30+ years of experience in all aspects of oil and gas land work, operations background including negotiation, acquisitions and divestments, contracts and merger

Slide 4: Why Own Yangarra?
Why Own Yangarra? Top Decile Full Cycle rates of return Central Alberta Cardium formation focus Low-cost operator, high netbacks 2018 First quarter cash costs totaled $14.06/boe • Operating costs (including transportation) of $8.05/boe • Royalties of $4.15/boe (9% of revenue) • G&A costs of $0.57/

Slide 5: Full Cycle Returns
Full Cycle Returns Half Cycle IRR ⁽¹⁾ Full Cycle IRR ⁽²⁾ 140% 120% 100% 80% IRR 131% 60% 105% 86% 40% 79% 80% 67% 65% 20% 41% 34% 31% 33% 31% 24% 26% 27% 12% 0% 2010 2011 2012 2013 2014 2015 2016 2017 1. Half cycle IRR is based on actual drilling and completion costs, production to date and P+P rese

Slide 6: Cardium Drilling Inventory
Cardium Drilling Inventory(1) Drilling Locations (1-mile laterals) 1000 900 800 700 Locations 600 500 400 300 200 100 0 2010 2011 2012 2013 2014 2015 2016 2017 Net Gross 940 gross (740 net) future 1-mile Cardium future drilling locations (1) • Continued to grow inventory by strategically picking u

Slide 7: Cardium Formation
143 142 41 T39 I Cardium Formation Biauaueemae Ene on Itd. n R12 R11 R10 RQ R8 R7 R4 toa R2W5 144 T43 T42 T41 T40 T39 T38 137

Slide 8: Deeper Drill Path
Deeper Drill Path Upper Cardium Bioturbated Lower Cardium New Well Path Old Well Path Upper Cardium Bioturbated Zone Lower Cardium Old Frac New Frac Plane Plane Upper Cardium (5-15% Porosity) 2.5- 4.0m Bioturbated Zone (20-80% 3.0- Sand) 7.0m Lower Cardium (3-6% Porosity) 1.5- 3.0m TSX: YGR 8

Slide 9: Deeper Drill Path
Deeper Drill Path 105 API 3 % Upper Reservoir Core analysis Porosity 9-11% Kmax average OOIP0.09md 2,959 Mstb OBOEIP 8,218 Mbbl 10 m Bioturbated Interval not analyzed Log Porosity 3-4% OOIP 2,198 Mstb OBOEIP 6,105 Mbbl Total Package OOIP/section 5,157 Mstb OBOEIP/section 14,323 Mbbl TSX: YGR 9

Slide 10: Cardium Well Economics
Cardium Well Economics Top 'Cardium Oil' Monthly Volumes Seen in April 2017 600 Monthly Associated Mth Daily Frac Total (boe/d) Oil (bbls/d) Company Field Vol Gas Oil Stage 500 (bbl) (mmcf) (bbl/d) (#) Yangarra Resources Ferrier 17,787 28.9 775.0 na ProductionPer Day Company A Pembina 15,148 8.4 836

Slide 11: Production Growth
Production Growth Production Per Share Production Vintage 8000 6x 14,000 200 190 7000 12,000 5x 180 Net Debt / Trailing Cash Flow 6000 170 Production / MM Shares 10,000 Production (boe/d) 160 # of Producing Wells 4x 5000 150 8,000 140 4000 3x 130 6,000 3000 120 2x 110 4,000 2000 100 1x 2,000 90 1000

Slide 12: Reserves Growth
Reserves Growth Reserves Per Share (boe per share) (2P) Reserves Profile 1.20 Nat. 1.08 Volumes (boe) NPV10 ($) Gas 9% 1.00 2P Reserves / share 0.80 0.76 0.65 Na 0.60 0.60 t. Oil Ga / s 0.40 0.36 NG 0.31 53 L's Oil/ NGL’s 0.22 % 47 91% 0.20 % - 2011 2012 2013 2014 2015 2016 2017 Gross Reserves (mmbo

Slide 13: F&D and Recycle Ratios
F&D and Recycle Ratios Finding and Development Recycle Ratio $30 30 7x Finding & Development Costs* ($ / boe) 6x 2P Reserve Additions (mmboe) $25 25 5x Recycle Ratio* (x) $20 20 4x $15 15 3x $10 10 2x $5 5 1x $0 0 0x 2011 2012 2013 2014 2015 2016 2017 2011 2012 2013 2014 2015 2016 2017 1P F&D / boe

Slide 14: 2018 Capital Plan
2018 Capital Plan CAPEX budget for 2018 $90.0 million 15 wells in the second half Budget focused on Cardium Wells Funded with cash flow and the existing credit facilities 2018 Guidance Production (boe/d) Annual Average 9,000 – 10,000 boe/d Cash flow from operations $80 – 90 million Year end

Slide 15: Duvernay Formation
Duvernay Formation Recent Well Results (Sorted By RR Date) #1 Shell: 100/09-27-039-06W5 RR: 2014/02/17 35,097 bbl cum CND 339,544 mcf cum gas Completion: 14 stages; 70-90t #2 Shell: 103/08-11-040-08W5 RR: 2014/07/18 12,722 bbl cum cnd 781,274 mcf cum gas Completion: 16 stages; 72-90t #3 YGR: 100/15-

Slide 16: Risk Management Program
Risk Management Program Oil Hedges 2018 200 bbl/d collar C$62.50 WTI/bbl and a ceiling of C$75.90 WTI/bbl (2018) 300 bbl/d collar C$62.50 WTI/bbl and a ceiling of C$76.10 WTI/bbl (Jan – Jun 2018) 300 bbl/d collar US$55.00 WTI/bbl and a ceiling of US$64.40 WTI/bbl (Jul – Dec 2018) 300 bbl/d at C$71.6

Slide 17: Analyst Coverage
Analyst Coverage Acumen Capital Finance Partners Limited Cormark Securities Inc. Trevor Reynolds Amir Arif, CFA Oil and Gas Research Analyst E&P Equity Research treynolds@acumencapital.com aarif@cormark.com (403) 410-6842 (403) 750-7200 AltaCorp Capital Inc. Industrial Alliance Securities Inc. Thoma

Slide 18: Forward Looking Statements
Forward Looking Statements Statements in this presentation may contain forward-looking information including expectations of future production and components of cash flow and earnings. Forward looking statements or information are based on current expectations, estimates and projections that involve

Slide 19: Reserve Definitions
Reserve Definitions Natural gas has been converted to a barrel of oil equivalent (Boe) using 6,000 cubic feet (6 Mcf) of natural gas equal to one barrel of oil (6:1), unless otherwise stated. The Boe conversion ratio of 6 Mcf to 1 Bbl is based on an energy equivalency conversion method and does not
Source: Internet Archive copy of yangarra.ca
More decks from Yangarra Resources Ltd.
Investor Presentation (September 2026)24 slides · September 2026
Investor Presentation (July 2026)22 slides · July 2026
Investor Presentation (May 2026)23 slides · May 2026
Investor Presentation (March 2026)22 slides · March 2026
Investor Presentation (October 2025)19 slides · October 2025
Investor Presentation (August 2025)19 slides · August 2025