  1. Slide 1: Australia's leading magnetite producer

    For personal use only Australia s leading Australia’s magnetite producer Russell Clark Managing Director & CEO 16 May 2012

  2. Slide 2: Disclaimer

    Disclaimer For personal use only The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation d ti tto subscribe b ib ffor, or purchase, h any security it iin G Grange R Resources Li Limited it d (“GRR”) nor does it form the basis of any contra

  3. Slide 3: Company Overview

    Company Overview For personal use only Grange remains Australia’s leading magnetite producer An ASX 300 company, producer. company with a large well managed long term cash producing mining operation, a strong balance sheet, no net debt, and paying dividends - and a larger magnetite project at DFS of

  4. Slide 4: Grange 2011 Highlights

    Grange g 2011 Highlights g g For personal use only • Record R d safety f t achievement hi t – zero LTI • Record cashflow - $210.4m • Record profit - $216.6m $216 6m • Record dividends – 5c/share (8% yield) • East wall recovery • Southdown project DFS completed • Southdown Mineral Resources increased

  5. Slide 5: Grange Assets

    Grange g Assets For personal use only Australia’ss Leading Magnetite Producer Australia Savage River (100%) Southdown Project (70%) Quality assets in Tasmania and Western Australia. 16 May 2012 Slide 5

  6. Slide 6: The Southdown Project DFS Highlights

    The Southdown Project j DFS Highlights g g For personal use only • $150 million spent to date - an advanced project!! • JORC mineral resources >1.2 billion tonnes at 34.1% DTR • Ore reserves of 397 million tonnes at 35.69% DTR. • DFS mine life of 14 years within the current permitted area and total

  7. Slide 7: The Southdown Project The Resource

    The Southdown Project The Resource For personal use only DFS: 14 year: 397 million tonne reserve @ 35.7% DTR LOM: 30+ years: 1.22 billion tonnes resource @ 34.1%DTR 16 May 2012 Slide 7

  8. Slide 8: The Southdown Project Mineral Resources & Reserves

    The Southdown Project j Mineral Resources & Reserves For personal use only Southdown mineral resource estimate as at February 2012 Tonnes (Mt) Grade (% DTR) Measured 423.0 37.6 I di t d Indicated 87 4 87.4 38 4 38.4 Inferred 710.6 31.5 Total 1 221 1,221 34 1 34.1 Southdown ore reserves as at Februar

  9. Slide 9: For personal use only

    For personal use only 16 May 2012 Slide 9

  10. Slide 10: Magnetite Project Concentrator Flow Sheet

    Southdown Magnetite Project Concentrator Flow Sheet For personal use only 16 May 2012 Slide 10

  11. Slide 11: Magnetite Project Product Quality

    Southdown Magnetite Project Product Quality (Process Design Criteria) For personal use only Southdown Magnetite % Concentrate Total Fe 69 5 69.5 SiO2 1.50 Al2O3 1 48 1.48 TiO2 0.38 P 0.04 S 0.08 LOI (Loss of ignition) -3.15 16 May 2012 Slide 11

  12. Slide 12: Magnetite Project Power and Pipelines

    Southdown Magnetite Project Power and Pipelines For personal use only Key Facts - Power: Estimated Length 288km Capacity 330kV transmission line Key Facts – Pipelines E ti t d Length Estimated L th 100k 100km 16 May 2012 Slide 12

  13. Slide 13: Magnetite Project Water Supply

    Southdown Magnetite g Project j Water Supply pp y For personal use only Source Seawater reverse osmosis desalination plant Capacity 11 GL/a L ti Location C t l location Coastal l ti 25km 25k from f mine i 16 May 2012 Slide 13

  14. Slide 14: Magnetite Project Port Infrastructure

    Southdown Magnetite g Project j Port Infrastructure For personal use only Vessels Cape size (18m draft) Activities  Deepen, widen and extend existing shipping channel  New wharf  Dewatering plant and storage shed Area Reclaimed  9ha  Increases port capacity from 2.5Mt 2 5Mt to 14Mt 16 May 2012

  15. Slide 15: Magnetite Project Permitting

    Southdown Magnetite Project Permitting For personal use only  Mi environmental Mine i t l permit it Granted November 2009,, amendment required in 2011 for 10mtpa  Port p permits Granted November 2010 Water permit Desalination permit targeted Q2 2012 16 May 2012 Slide 15

  16. Slide 16: Project DFS Capital Expenditure

    Southdown Project DFS Capital Expenditure For personal use only Total Cost Description (A$ M) Mine & Concentrator 1,330 Desalination Plant, Pipelines and Transmission Line 640 Albany Port Works, Berth, Storage Facilities 380 Sub-total 2 350 2,350 Owners Costs, EPCM and Contingency 535 Total Estimate

  17. Slide 17: Project DFS Operating Cost Summary

    Southdown Project DFS Operating Cost Summary For personal use only A$/t Operating Costs Concentrate Mining 24.4 Concentrator 24.6 p Pipeline, Filtration and Port 5.7 Overheads 3.8 T t l Operating Total O ti C Costs t 58 5 58.5 16 May 2012 Slide 17

  18. Slide 18: Project Extended mine life case

    Southdown Project Extended mine life case For personal use only • Mining eastern extent of the orebody, orebody in addition to western side • Total resource of 1.2 billion tonnes @ 34.1% DTR. • Potential life > 30 years • NPV ~$1.8 billion, IRR ~20% • Will use existing infrastructure associated - on

  19. Slide 19: Magnetite Project Target Time Line

    Southdown Magnetite g Project j Target g Time Line For personal use only 2011 2012 2013 2014 2015 Pre- feasibility Definitive Feasibility Financing Construction Production 16 May 2012 Slide 19

  20. Slide 20: Key Contacts

    Keyy Contacts For personal use only Primary contacts: Russell Clark Managing Director & Chief Executive Officer +61 8 9327 7901 managingdirector@grangeresources.com.au Media: Tarryn Truscott “LastSay.” Communications +61 8 6102 7295 or +61 (0) 438 906 643 t tarryn@lastsay.net.au @l t t 16 May 2012 S

  21. Slide 21: Competent Person Statement

    Competent p Person Statement For personal use only Southdown Project j  The information in this report which relates to the Mineral Resources of the Southdown Project is based on information compiled by Mr Michael Everitt who is a full-time employee of Grange Resources Limited and a Member of the A