Blencowe Resources Plc · LSE:BRES

Blencowe Resources — Investor Presentation (April 2022)

21 slides from Blencowe Resources's investor presentation, Apr 11, 2022

  1. Slide 1: Building a Portfolio of Sustainable 'Green' Battery Metals Projects

    LSE: BRES #BRES BUILDING A PORTFOLIO OF SUSTAINABLE ‘GREEN’ BATTERY METALS PROJECTS Highly Leveraged to Deliver Renewable Energy Source Materials into the Rapidly Growing Electric Vehicle market 1

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Blencowe Plc (“Blencowe”). This document contains background information about Blencowe current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct thei

  3. Slide 3: Blencowe - Company Overview

    BLENCOWE - COMPANY OVERVIEW BOARD OF DIRECTORS CORPORATE HIGHLIGHTS Ticker BRES.L Cameron Pearce Main Board London Stock Exchange/Standard Listing Chairman Market Cap @5p c. £9.0m Enterprise Value c. £7.2m Mike Ralston Warrants & Options 82.9m CEO Average Exercise Price = 7.5p Issued Share Capital 1

  4. Slide 4: Emerging Portfolio of Key Battery Metals Projects

    EMERGING PORTFOLIO OF KEY BATTERY METALS PROJECTS Two Highly Synergistic Projects within just ~150kms of each other in northern Uganda OROM-CROSS GRAPHITE:  Substantial graphite deposit (2-3 billion tonnes) Akelikongo  Advanced – 21 year mining license already awarded Nickel Project  Revised JORC

  5. Slide 5: Life Cycle Sustainability

    LIFE CYCLE SUSTAINABILITY Focus going well beyond the ESG norm to deliver Sustainable Green Graphite Products from Operations ENVIRONMENTAL:  Focus on renewable energy options to drive all operations: o 100% grid energy for processing plant will be generated from Isimba hydro-power station ~150kms

  6. Slide 6: Life Cycle Sustainability - Community Development and Participation

    LIFE CYCLE SUSTAINABILITY Community Development and Participation SOCIAL DEVELOPMENT:  Building an operation in close co-operation with local population and with their involvement  Social awareness programs  Community Development Agreement in place to return value to the local participants:  US$

  7. Slide 7: Value Proposition - Orom-Cross Graphite Project Overview

    VALUE PROPOSITION Orom-Cross Graphite Project Overview  Estimated 2.5Bn tonnes graphite within tenements  First 15 years’ Life of Mine drilled to JORC Standard; no further drilling required  97.3% TGC concentrate / low impurities / high recoveries  Good mix of jumbo & large (35%) / medium & smal

  8. Slide 8: Key Milestones Over Past 24 Months

    KEY MILESTONES OVER PAST 24 MONTHS BLENCOWE HAS ALREADY ADDED CONSIDERABLE VALUE TO OROM-CROSS GRAPHITE PROJECT  Acquired Orom-  Successful completion Cross Project and of metallurgical test raised £2m for work (SGS labs project Toronto) on end development product graphite as  Maiden JORC through

  9. Slide 9: Forward Strategy and Anticipated Timelines - Graphite

    FORWARD STRATEGY AND ANTICIPATED TIMELINES - GRAPHITE 2025 Commencement of mining and ramp up Development plant and infrastructure 2024 Decision to mine (full investment and plant) 2H 2023 Raise necessary funding Pilot plant commissioned, producing small quantum graphite on-site Mid-2023 2H 2022 Com

  10. Slide 10: Revised JORC Mineral Resource

    REVISED JORC MINERAL RESOURCE Updated: April 2022 - Less than 1% of Orom-Cross Project drilled to date Mineral Resources Metallurgy Area Mt % Total Carbon Upgraded Recoveries Deposit Concentrate (%) (% TGC) Northern Syncline Inferred 10.6 5.78 Northern Syncline 98.1% 80.9% Indicated 10.4 5.85 Lower

  11. Slide 11: Forecast Market Prices

    FORECAST MARKET PRICES Orom-Cross will produce 4x End-Products as High Grade Concentrates Preliminary Economic Assessment (2021) Current 2021 CIF 2021 CIF Estimated Concentrate (% % China China 2022 Prices Mesh Size 2025 CIF China TCG) End Product USD 94-95% USD 96-97% USD 96-97% TGC USD 96-97% TGC

  12. Slide 12: Advancing Orom-Cross from PEA (2021) to PFS (2022)

    ADVANCING OROM-CROSS FROM PEA (2021) TO PFS (2022) Changing Focus to Lower Risk Start-up with Ability to Expand Fast Thereafter Key Performance Indicators Preliminary Economic Assessment Pre-Feasibility Study LIFE OF MINE 13 years 15-20 years ANNUAL PRODUCTION 75,000tpa (average) 25,000tpa – 100,000

  13. Slide 13: Orom-Cross End Products

    OROM-CROSS END PRODUCTS Sales options Typical applications for different graphite flake sizes Orom-Cross to sell 65% End Product as Small/Medium flake concentrate and 35% as Jumbo/Large concentrate Jumbo/Large Medium Small (20 to 80 mesh) (80 to 150 mesh) (+150 mesh)  Gaskets and seals  Basic refr

  14. Slide 14: Macro Market Micro Market - Electric Vehicles

    ELECTRIC VEHICLES One of the fastest growing trends worldwide Dec 2021 Low Range Forecast High Range Forecast 15m 100m 6x Growth 400m 25x Growth Total EVs Today China Europe USA RoW Forecast EVs by 2030 7m 5m 2m 1m Currently 282 Megafactories under construction or operating worldwide Source – Benchm

  15. Slide 15: Flake Graphite - Long Term Supply Forecast, 2015-2040

    FLAKE GRAPHITE - LONG TERM SUPPLY FORECAST, 2015-2040 We expect that market to remain in structural deficit requiring ongoing investment in new capacity Widening shortfall in supply and fast-growing demand Synthetic Supply for Anode use will likely cause a massive imbalance ahead Operational Supply

  16. Slide 16: Value Proposition - Akelikongo Nickel Project Overview

    VALUE PROPOSITION Akelikongo Nickel Project Overview  US$15M spent to date by Sipa & Rio Tinto JV on regional nickel exploration, identifying several strong structures, geochemistry and anomalies  Plus 19,000m of drilling to date (regional)  Standout – basal ultramafic unit containing disseminate

  17. Slide 17: Cross Section of Shallow (0-60m) Mineralised Zone

    CROSS SECTION OF SHALLOW (0-60m) MINERALISED ZONE 17

  18. Slide 18: Deeper (300m) Mineralised Zone

    DEEPER (300m) MINERALISED ZONE 18

  19. Slide 19: Forward Strategy and Anticipated Timelines - Nickel

    FORWARD STRATEGY AND ANTICIPATED TIMELINES – NICKEL Execute drill program to extend nickel sulphide mineralised zone 2H-2022 Mid-2022 Plan drill program from targets Airborne EM (electromagnetic) program to identify drill targets 2Q 2022 Downhole EM program on existing Akelikongo mineralised zone 1Q

  20. Slide 20: Blencowe Resources Investment Case

    BLENCOWE RESOURCES Orom-Cross set to become a Top 10 Global, lowest- cost quartile graphite producer INVESTMENT CASE Outstanding economics for a multi-decade operation Sustainability Located in a safe mining jurisdiction Diversification Leverage High quality concentrate with low impurities Significa

  21. Slide 21: Contact

    1 King St +44(0)1624 681 250 London EC2V 8AU info@blencoweresourcesplc.com UK 21

Blencowe Resources — Investor Presentation (April 2022) on 6ix