Fortune Electric Co., Ltd. · TWSE:1519

Fortune Electric — Investor Presentation (December 2020)

28 slides from Fortune Electric's investor presentation, Dec 7, 2020

  1. Slide 1: Fortune Electric Co., Ltd.

    Fortune Electric Co., Ltd. TWSE Code:1519 2020/12/07

  2. Slide 2: Safe Harbor Notice

    Safe Harbor Notice  This Presentation contains certain forward-looking statements that are based on current expectation and are subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements.  Except as r

  3. Slide 3: 1-1 Company Overview

    1-1 Company Overview Type of Heavy Electric Type of TWSE Listed Business Establishment Aug 26th, 1969 Lising Date April 16th, 1997 Chairman Pedro Hsu President/CEO Ted Hsu/Ithen Hsu Taiwan 900 Capital TWD 2.61 Billion Employees Global 1,100 Equipment: Transformers, Switchgear, PV BOX, Panel, Transfo

  4. Slide 4: 1-2 Company Profile (1)

    1-2 Company Profile(1) Zhongli Plant Guanyin Plant #2 Guanyin Plant #3 Taichung Plant FORTUNE ELECTRIC 4

  5. Slide 5: 1-2 Company Profile (2) – Wuhan Plant

    1-2 Company Profile (2) – Wuhan Plant 110kV Power 230kV Power Transformer exported Transformer to Myanmar Power Company FORTUNE ELECTRIC FR3 Transformer 5

  6. Slide 6: 2-1 Product Description

    2-1 Product Description In August 2019, completed and exported a record-breaking 530kV 775MVA power PV BOX DC Switch gear for Taipei MRT transformer to an US utility. System (DC 750V 6,000A) 23kV Switchgear 24kV GIS Exported Australian PV BOX FORTUNE ELECTRIC 6

  7. Slide 7: 2-2 The Most Completed Product Line

    2-2 The Most Completed Product Line 1 Step-up 345kV~500kV power transformers 1 2 Substation type 161kV power transformers 2 3 Substation type 69kV power transformers 3 4 Distribution pole/pad 4 transformers 5 Transformers for 5 industrial applications 6 System pre-planning, replacement & specificati

  8. Slide 8: 2-3 FE's Green Power Products in Smart Grid

    2-3 FE’s Green Power Products in Smart Grid FORTUNE ELECTRIC 8

  9. Slide 9: 2-4 Export Market Leader (1/2)

    2-4 Export Market Leader(1/2) 530kV 775MVA (Highest voltage and capacity in the country) Arrived in the U.S. at January 2020 400kV/115kV 200MVA Transformer to America(ambient temperature -50℃) PV BOX for solar power (amorphous transformer) to Japan 345kV/118kV 448MVA Low Noise Transformer to America

  10. Slide 10: 2-4 Export Market Leader (2/2)

    2-4 Export Market Leader(2/2) Overcome the epidemic in 2020, continue to deliver and complete installation to the U.S., Australia, Japan, Southeast Asia and other places. FORTUNE ELECTRIC 10

  11. Slide 11: 2-5 Performance of Offshore Wind (1/3)

    2-5 Performance of Offshore Wind(1/3) (Awarded by the employer for early completion) In 2018, the second phase of Formosa I’s 161kV substation and onshore system were awarded to Fortune. In June 2019, 161kV substation and onshore system were completed and integrated into the grid. In November 2019,

  12. Slide 12: 2-5 Performance of Offshore Wind (2/3)

    2-5 Performance of Offshore Wind(2/3) In July 2019, Completion of Hitachi TPC Phase 1 22kV 5.8MW Transformer inside the Wind Turbine Module In 2020, Completion of 230kV 360MVA Offshore Wind power transformer FORTUNE ELECTRIC 12

  13. Slide 13: 2-5 Performance of Offshore Wind (3/3)

    2-5 Performance of Offshore Wind(3/3) 2019/10 2020~ Delivery of the In 2020, Continued delivery of In 2020, the implementation of the First 33kV Wind 33kV Wind Turbine Modules, tower/fan/tower assembly project so far Turbine Module approx. 21 sets. FORTUNE ELECTRIC 13

  14. Slide 14: 2-6 Performance of Ground-Mounted Solar

    2-6 Performance of Ground- Mounted Solar In 2019, Received order for Taiwan’s Largest solar project 150MWp in Tainan Yantian. In April 2020, completed 40MW on-grid commissioning for TPC’s Yentian Solar Power Plant. In June, completed the floating type solar for 5.6MWp and integrated into grid. In De

  15. Slide 15: 3-1 Four Pillars Two Highlights

    3-1 Ensure the Existing Markets, Grasp the Opportunities of Green Energy. Four Pillars Two Highlights Green TPC Energy Markets Exporting Markets Markets FORTUNE ELECTRIC 15

  16. Slide 16: 3-2 Percentage of Products for 2019

    3-2 Percentage of Products for 2019 Others: including transformer installation / maintenance works, sale of materials / spare parts, et FORTUNE ELECTRIC 16

  17. Slide 17: 3-3 Percentage of Products for 2020/1~10

    3-3 Percentage of Products for 2020/1~10 Others: including transformer installation / maintenance works, sale of materials / spare parts, et FORTUNE ELECTRIC 17

  18. Slide 18: 3-4 Percentage of Domestic and Exporting

    3-4 Percentage of Domestic and Exporting FORTUNE ELECTRIC 18

  19. Slide 19: 3-5 Revenue Grew Steadily

    3-5 Revenue Grew Steadily FORTUNE ELECTRIC 19

  20. Slide 20: 3-6 Consolidated Financial Simple Highlights

    3-6 Consolidated Financial Simple Highlights FORTUNE ELECTRIC 20

  21. Slide 21: 4-1 Technology Continues to Improve

    4-1 Technology Continues to Improve FORTUNE ELECTRIC 21

  22. Slide 22: 4-2 R&D Innovation Performance is Affirmed

    4-2 R&D Innovation Performance is Affirmed FORTUNE ELECTRIC 22

  23. Slide 23: 5-1 Transformed to FE Digital System, Smart Factory Constructed

    5-1 Transformed to FE Digital System, Smart Factory Constructed FORTUNE ELECTRIC 23

  24. Slide 24: 5-2 Transformed to FE Digital System, Smart Factory Constructed

    5-2 Transformed to FE Digital System, Smart Factory Constructed FORTUNE ELECTRIC 24

  25. Slide 25: 6-1 Electric vehicle industry total solution capabilities 2020

    6-1 Electric vehicle industry total solution capabilities 2020 FORTUNE ELECTRIC 25

  26. Slide 26: 6-2 Deployment domestic charging operation network 2020

    6-2 Deployment domestic charging operation network 2020 FORTUNE ELECTRIC 26

  27. Slide 27: 6-3 Electrical/Power Control/MRT Power System Construction

    6-3 Electrical/Power Control/ MRT Power System Construction FORTUNE ELECTRIC 27

  28. Slide 28: Thank You for Your Attention.

    Thank You for Your Attention. FORTUNE ELECTRIC 28

Fortune Electric — Investor Presentation (December 2020) on 6ix