Wa Kaolin Limited · ASX:WAK

Wa Kaolin — Investor Presentation (November 2022)

18 slides from Wa Kaolin's investor presentation, November 2022

  1. Slide 1: Investor Presentation: Equity Raising

    Investor Presentation Equity Raising: Production Ramp Up and Advancing Stage 2 at the world class Wickepin Kaolin operation Production Delivering ultra of bright, High Purity high purity Kaolin Kaolin From into One aofglobal the market World’sforLargest decades to come Primary Resources

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer  This presentation has been prepared by WA Kaolin Ltd (WAK). This document contains background  To the fullest extent permitted by law, WAK and its related bodies corporate, its directors, officers, information about WAK current at the date of this presentation. The

  3. Slide 3: Compelling Investment Proposition

    Compelling Investment Proposition Long-life supply of superior quality Kaolin, with a global competitive advantage through proximity to the dominant Asian end user market WAK is now an Emerging Globally Significant Kaolin Producer  One of the largest ultra bright high purity Kaolin deposits in the

  4. Slide 4: WAK Ramping Up to 400,000tpa and beyond

    WAK Ramping Up to 400,000tpa and beyond 2022 Stage 1 2024 Stage 2 Pilot Operations Future Scale Up Ramp Up Ramp Up K99 Proof of Concept Plant K99 Commercial Scale K99 Capacity Expansion Further K99 Expansion Kwinana, WA Wickepin, WA Wickepin, WA Wickepin, WA  Pilot Plant Production  25t/hour  50t

  5. Slide 5: 2022 Milestones

    2022 Milestones Wickepin Plant Operational  Stage 1 operations underway: First production in September 2022  Operational start up completed to budget despite challenging environment (COVID-19, supply chain, labour shortages)  Accelerated early investment into portions of Stage 2 production ramp u

  6. Slide 6: Corporate Snapshot

    Corporate Snapshot Corporate Structure Shares on Issue 332,991,470 Market Capitalisation $56.6m @ 17.0c per share Unlisted Options1 167,232,813 Performance Rights 27,500,000 1 Weighted average option exercise price is $0.27 and expiring between Nov-23 to Nov-25 Cash at bank 30/09/2022 $2.9m Substant

  7. Slide 7: Equity Raise Details

    Equity Raise Details WA Kaolin is raising A$7.5 million (before costs) Offer Structure and Size Single tranche share placement of fully paid ordinary shares (“New Shares”) to sophisticated, professional and other institutional investors to raise approximately A$5.0 million (before costs) (“Placement

  8. Slide 8: Use of Proceeds

    Use of Proceeds Item A$ million Source of funds Placement (including Converting Loan) 6.0 SPP 1.5 Total 7.5 Stage 2 Works 20kg Bagging Filling and Palletising 1.5 Covered Ore Store Roof 0.5 Mine development and Traffic Management 0.5 Working Capital and R&D (inc. Costs of the Offer) 5.0 Total 7.5 8

  9. Slide 9: Indicative Timetable

    Indicative Timetable Event Date Trading halt Friday, 25 November 2022 Record date for the SPP 4pm (WST) Monday, 28 November 2022 ASX announcement Placement & SPP, Appendix 3B lodged with ASX Pre-open Tuesday, 29 November 2022 Trading halt lifted – trading resumed on the ASX 7am (WST) Tuesday, 29 Nov

  10. Slide 10: Wickepin Kaolin Operation: Overview

    Wickepin Kaolin Operation: Overview World Class Deposit  Discovered by Rio Tinto in 1980’s (acquired by WA Kaolin in 1999)  Ore Reserve: 30.5mt1 of ultra bright, high purity kaolinised granite  Mineral Resource: 644.5 mt2 of ultra bright, high purity kaolinised granite (includes ore reserve)  Th

  11. Slide 11: Kaolin Market Growing Strongly

    Kaolin Market Growing Strongly Market Size & Growth  2021: Over US$4.2 billion in global kaolin market sales  Continued strong global Kaolin market growth, forecast 3.7% compound growth 2022-2030  Asia dominates end user demand (41% market 2021), primarily in China, India, Malaysia and South Kore

  12. Slide 12: Conclusion

    Conclusion  WA Kaolin has successfully delivered construction of Stage 1 on budget with first production commencing on time at the end of September  Full Stage 1 production rate of 200,000 tpa expected by the end of FY 23  Product Pricing premium achieved over initial projections  Wickepin quali

  13. Slide 13: Andrew Sorensen CEO

    Andrew Sorensen CEO asorensen@wakaolin.com.au +61 8 9439 6300 wakaolin.com.au Investor Relations Victoria Humphries victoria@nwrcommunications.com.au 13

  14. Slide 14: Reserves and Resources

    Reserves and Resources Table 1. Ore Reserves by JORC Classification Reserves & Resources Yield (%) It is one of the largest known remaining kaolin resources in the JORC ISO In situ Kaolin Tonnes (Mt) (<45 µm in classification brightness (%) (Mt) world, and contains: size)  Probable Ore Reserve of 3

  15. Slide 15: Tenement Map

    Tenement Map N l ~~ } sd s x WICKEPIN x a L370 000mN |: 6350000mN— Road Rail a Kaolin Pipeline _- Water Pipeline -~ 220kV Power Transmission MINE & KAOLIN \ PLANT SITE wa Kaolin

  16. Slide 16: Risks

    Risks Risks associated with WAK including, but not limited to: A key factor for WAK is the price of kaolin. Kaolin prices fluctuate due to a variety of factors including supply and demand fundamentals, international economic and political trends, expectations of inflation, currency exchange rate flu

  17. Slide 17: Risks continued

    Risks continued Risks associated with WAK including, but not limited to: WAK is currently negotiating offtake agreements for its intended expanded production. WAK has customers in place for current production and LOI’s for a certain quantity of the intended expanded production. However, there is a r

  18. Slide 18: Risks continued

    Risks continued General Risks The agreements entered into by WAK with its current customers / distributors outside Australia are in USD. Demand and supply of capital and currencies, forward trading activities, relative interest rates and exchange rates and relative economic conditions can impact for

WA Kaolin — Investor Presentation (November 2022) on 6ix