Alkane Resources Ltd · ASX:ALK
Alkane Resources — Investor Presentation (January 2012)
34 slides from Alkane Resources's investor presentation, Jan 24, 2012
Slide 1: Cover letter to ASX: updated corporate presentation
RESOURCES L TD ABN 35 000 689 216 For personal use only 24 January 2012 Manager Announcements Company Announcements Office ASX Limited 20 Bridge Street Sydney NSW 2000 Dear Sir, PRESENTATION Attached is a copy of the Company’s updated corporate presentation. A copy of this presentation will also be
Slide 2: Corporate Presentation January 2012
For personal use only January 2012
Slide 3: Equity & Ownership
Equity & Ownership For personal use only Equity Ownership Shares – 269,028,158 Options – nil Share price – A$1.00 Market Capitalisation – A$269M Cash – A$9M (31 Dec 2011) Debt – nil Share turnover – A$55M per month (average 2011) 12 Month Low/High – A$0.89/$2.73 Codes – ALK (ASX) A
Slide 4: Location and Business Strategy
Location and Business Strategy For personal use only Location Multi commodity explorer and miner – focussed in the Central West of New South Wales, Australia Region with substantial existing infrastructure. Dubbo Zirconia Project – world class resource of zirconium, hafnium, niobium, tantalum, y
Slide 5: Board & Management
Board & Management For personal use only Board Senior Management John Stuart Ferguson Dunlop (Chairman). BE(Min), Terry Ransted (Chief Geologist). Geologist with 29 years MEngSc(Min). Mining engineer with 40 years surface and experience in many facets of exploration and regional underground mini
Slide 6: Operations Team
Operations Team For personal use only BOARD Managing Director Ian Chalmers Company Secretary Commercial Manager Chief Geologist General Manager NSW Environmental Consultants Lindsay Colless CFO Tony Wright Terry Ransted Mike Sutherland R W Corkery Pty Ltd Karen Brown Commercial & Legal Technical Man
Slide 7: Assets
Assets For personal use only Alkane Resources Emerging Producers Advanced Resources Exploration Discoveries Exploration Moorilda 100% Dubbo Zirconia 49% 100% Bodangora 100% Project McPhillamys Calula Glen Hollow Newmont 100% Tomingley Gold 100% 100% Wellington 100% Peak Hill Diamond Creek Project Ga
Slide 8: Project Locations
Project Locations For personal use only Emerging Producers Dubbo – 400km NW of Sydney Tomingley – 50km SW of Dubbo McPhillamys – 35km SE of Orange Exploration Bodangora – 40km SE of Dubbo Wellington – 50km SE of Dubbo Cudal – 40km W of Orange McPhillamys 7
Slide 9: Dubbo Zirconia Project
Dubbo Zirconia Project For personal use only Outcrop of Toongi deposit 8
Slide 10: Infrastructure
Infrastructure For personal use only Infrastructure Population – 80,000 Dubbo regional Rail – railway hub Road – major highways intersection/hub Water – numerous sources Electricity – NSW State power grid Gas – NSW State gas grid Industrial – substantial light industry Agriculture –
Slide 11: Resources & Reserves
Resources & Reserves For personal use only Resources & Reserves Resources & Reserves – open at depth Life – +20 years but can support longer life and higher production rates Major world resource ‐ zirconium, hafnium, niobium, tantalum, yttrium & rare earth elements Resources Depth (m) Tonnes (
Slide 12: Product Output & Revenues
Product Output & Revenues For personal use only 1.0Mtpa Throughput 39% of revenue – Zirconium 22% of revenue – Niobium 21% of revenue – LREE 18% of revenue – YHREE Anticipated Production & Revenues (1.0Mtpa) Products Price/kg predicted Price/kg used Production / Sales Revenues Revenue % Zirc
Slide 13: DFS Financials
DFS Financials For personal use only Definitive Feasibility Study DUBBO ZIRCONIA PROJECT Financial Summary (A$) Base case – 0.4Mtpa (superseded) Project Capacity 0.4Mtpa 1.0Mtpa Current case – 1.0Mtpa (base case) Capex – Plant1 $278M $543M CAPEX – $893M ($751M pre‐contingency) EBITDA – $308M
Slide 14: Process Plant
Process Plant For personal use only Processing Demonstration Pilot Plant – established 2008 ANSTO – Aust. Nuclear Science & Tech. Org. Process – unique & advanced Optimization – ongoing Sulphuric acid leach whole of ore Solvent extraction, separation & refining Chemical precipitation
Slide 15: Radionuclides
Radionuclides For personal use only Uranium & Thorium ANSTO – assists with management of radionuclides, such as uranium & thorium Radioactive elements – low levels contained within the deposit (100ppm U & 450ppm Th) Innovative process – no concentrate produced (uranium/thorium not concentrated
Slide 16: Marketing
Marketing For personal use only Off‐take Zirconium (39% of revenue) – 100% under MOU Niobium (22% of revenue) – 100% under MOU LREE (21% of revenue) – advanced negotiations YHREE (18% of revenue) – advanced negotiations Throughput – there are four MOU’s which virtually guarantee production
Slide 17: Environmental Impact
Environmental Impact For personal use only Environmental Impact Statement – key areas of focus Existing land use (agriculture) Air quality Noise and vibration Surface and ground water Soil stability Flora and fauna Biodiversity Visibility Rail freight movements Road traffic Abo
Slide 18: Zirconium
For personal use only 17 Zirconium
Slide 19: Niobium
For personal use only 18 Niobium
Slide 20: Rare Earth Elements
Rare Earth Elements For personal use only 19
Slide 21: DZP Timetable
DZP Timetable For personal use only ‐> 2009 2010 2011 2012 2013 2014 DZP Resource definition 2001 ‐ 2002 Flow sheet development 2002 Laboratory Zr – Nb 1999 – 2002 Continued product Pilot plant Zr – Nb 2002 development Mine Plan & Scheduling 2002 Plant Design & Engineering 2002 Laborator
Slide 22: Tomingley Gold Project
Tomingley Gold Project For personal use only TGP Processing plant 21
Slide 23: Tomingley Gold Project Highlights
Tomingley Gold Project For personal use only Project Highlights CAPEX – A$95M ($48M plant; $23M infrastructure; $23M owners costs) Throughput – 1.0Mtpa Head Grade – 1.88g/t Recoveries – 93% Gold Production – 50,000ozpa Cash Costs – A$942/oz Life – 7.5years (targeting +10 years) Resou
Slide 24: Tomingley Gold Financials
Tomingley Gold Financials For personal use only Financial Highlights EBITDA – $30Mpa (average) NPV – A$79M @ A$1,700/oz (circa 40% hedged) Debt & Hedging – mandate with Credit Suisse to provide up to A$45M debt facility + gold hedging Hedging – flat forwards for 3.5 years Financial Summary G
Slide 25: McPhillamys Gold Project (49%)
McPhillamys Gold Project (49%) For personal use only Core drilling at McPhillamys 24
Slide 26: McPhillamys Gold Project Highlights
McPhillamys Gold Project For personal use only Project Highlights Joint venture – Newmont has 51% but may go to 75% Resource (+0.3g/t cut) – 92Mt @ 1.0g/t gold (3.0Moz) Resource (0.5g/t cut) – 61Mt @ 1.3g/t gold (2.6Moz) Copper credits (<0.1%) Mining method – open cut or block cave Recov
Slide 27: Exploration
Exploration For personal use only Core drilling at Bodangora 26
Slide 28: Exploration Discoveries 2010-2011
Exploration For personal use only Discoveries in 2010‐2011 Bodangora (100%) – NSW. Glen Hollow gold‐copper: – 46m @ 0.9g/t gold & 0.25% copper – 18m @ 1.7g/t gold & 0.45% copper Wellington (100%) – NSW. Galwadgere copper‐gold: – 2Mt @ 1.0% copper & 0.3g/t gold (with upside) – 14m @ 0.9% copper &
Slide 29: Project Timetable
Project Timetable For personal use only TIMETABLE 2010 2011 2012 2013 2014 2015 TOMINGLEY GOLD Definitive Feasibility Study (DFS) Environmental Assessment / DC Project Financing @ $A90M Construction Production DUBBO ZIRCONIA Definitive Feasibility Study (DFS) Environmental Assessment / DC Project Fi
Slide 30: Outlook
Outlook For personal use only Conclusion Dubbo Zirconia Project (DZP): – Global Strategic Significance – a long term, significant project in the zirconium and heavy rare earth industries, which can generate substantial cash flows – Production costs – spread across the four metal outputs which will
Slide 31: Disclaimer
Disclaimer For personal use only Disclaimer This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth o
Slide 32: Resource & Reserves: Tomingley + Peak Hill
Resource & Reserves: Tomingley + Peak Hill For personal use only Tomingley (TGP) – Mineral Resources DEPOSIT MEASURED INDICATED INFERRED TOTAL Top Cut Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade Gold 2.5x2.5x5.0m model (t) (g/t) (t) (g/t) (t) (g/t) (t) (g/t) (koz) Wyoming One 2,227,000 2
Slide 33: Resource & Reserves: Dubbo + Galwadgere
Resource & Reserves: Dubbo + Galwadgere For personal use only Dubbo Zirconia Project – Mineral Resources Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO U3O8 Deposit (Mt) (%) (%) (%) (%) (%) (%) (%) Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 0.014 Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 0.014 T
Slide 34: McPhillamys Resource Statement
McPhillamys Resource Statement For personal use only Moorilda – McPhillamys – Mineral Resources DEPOSIT INDICATED INFERRED TOTAL McPhillamys Tonnage Grade Grade Tonnage Grade Grade Tonnage Grade Grade k Ounces tonnes 0.3g/t Au cut-off (t) (g/t) % Cu (t) (g/t) % Cu (t) (g/t) % Cu gold copper Inner Or
Alkane Resources — Investor Presentation (January 2012) on 6ix