Filo Mining Corp

Filo Mining — Investor Presentation (February 2021)

31 slides from Filo Mining's investor presentation, February 2021

  1. Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America

    ADVANCING THE FILO DEL SOL COPPER-GOLD-SILVER PROJECT IN SOUTH AMERICA Corporate Presentation - February 2021 A Lundin Group Company www.filo-mining.com TSXV: FIL | Nasdaq First North Growth Market: FIL | OTCQX: FLMMF

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward- Estimates of Mineral Reserves and Mineral Resources looking statements” within the meaning of applicable securities legislation (collectively, “forward-

  3. Slide 3: Filo Mining Corp. Company Profile

    FILO MINING CORP. COMPANY PROFILE SHARE OWNERSHIP Lundin Family Trusts South American Project – Filo de Sol (100% interest) Board & Management Current Indicated Resource of: Advanced Top Shareholders Exploration » 4.4 Million oz Gold Other » 147 Million oz Silver Company » 3.1 Billion lbs Copper CAP

  4. Slide 4: Filo del Sol Project

    FILO DEL SOL PROJECT Filo del Sol hosts a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry copper-gold system. Located in San Juan, Argentina & Chile » Pro-mining jurisdictions » Mining Integration and Complementation Treaty for cross-border projects » 12 km a

  5. Slide 5: Investment Highlights

    INVESTMENT HIGHLIGHTS UNPARALLELED GROWTH POTENTIAL Lukas Lundin commented, Existing Cu-Au-Ag resource, backstopped by a robust oxide “…the potential size and scale project. of the Filo del Sol deposit is unparalleled to any project I have been involved with … Our drill results this season are Outst

  6. Slide 6: Why Copper?

    WHY COPPER? » Copper fundamentals are strong; recent price movement now well above $3.50/lb, declining global inventories • Lack of Investment: coming out of a cycle of depressed copper prices, limited new copper discoveries • Demand driving by Electrification, Infrastructure: copper is the “Green”

  7. Slide 7: Exploration

    EXPLORATION Filo Mining | Corporate Presentation

  8. Slide 8: 2019 / 2020 Field Program Summary

    2019 / 2020 FIELD PROGRAM SUMMARY HIGHLIGHT HOLES: FSDH032: total FSDH034: total FSDH038: intercept of intercept of highlight 1,009m @ 1,034m @ intercept of 73m 0.95% CuEq 0.68% CuEq @ 2.04% CuEq From To Length Hole-ID Cu % Au g/t Ag g/t CuEq %1 (m) (m) (m) FSDH032 132.0 1,141.0 1,009.0 0.57 0.39 11

  9. Slide 9: Comparison with Global Copper Intercepts

    COMPARISON WITH GLOBAL COPPER INTERCEPTS Best holes over the past 12 months with Copper as the primary commodity CuEq Grade x Date Hole Number Project Country Company From (metres) To (metres) Interval (metres) CuEq (%) Source Document Interval¹ (%-m) 2020-02-24 VHD037 Onto Indonesia PT Sumbawa Timu

  10. Slide 10: 2019 / 2020 Results

    2019 / 2020 RESULTS SIGNIFICANT INTERSECTIONS OUTSIDE OF THE RESOURCE PIT SHELL Intersections by hole OUTSIDE of resource pit shell Hole ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t CuEq % FSDH029 180.0 800.1 620.1 0.22 0.27 1.8 0.43 FSDH027 70.0 545.4 475.4 0.23 0.29 2.0 0.46 FSDH026 240.0 613.

  11. Slide 11: Development of an Exploration Target

    DEVELOPMENT OF AN “EXPLORATION TARGET” BASED ON PREDICTED VOLUMES AND AVERAGED GRADES FROM SAMPLING THE DEEP DRILLING The quantity and grade of this exploration target is conceptual in nature, and there has been insufficient exploration to define a mineral resource in this area. It is uncertain if f

  12. Slide 12: 2020 / 2021 Field Program

    2020 / 2021 FIELD PROGRAM Filo Mining | Corporate Presentation

  13. Slide 13: 2020 / 2021 Program

    2020 / 2021 PROGRAM Testing the ~2km gap to the north between FSDH032 and VRC093 to further define the sulphide resource. Targeting additional high-grade zones as defined by our recent geophysical interpretation (high-conductivity). Complete preliminary metallurgical testwork on the sulphide materia

  14. Slide 14: 2020 / 2021 Program Plans

    2020 / 2021 PROGRAM PLANS RESOURCE EXPANSION » Testing the gap to the north » Multiple indicators: surface alteration, surface geochemistry, geophysics, previous drilling. » Potential to go deep (~1,500m+) – holes are open at depth, just hitting top of traditional porphyry target. HIGH-GRADE TARGETS

  15. Slide 15: 2020 / 2021 Program Plans

    2020 / 2021 PROGRAM PLANS Slide 15 Filo Mining | Corporate Presentation

  16. Slide 16: Positive PFS (Jan 2019)

    POSITIVE PFS (JAN 2019) Filo Mining | Corporate Presentation

  17. Slide 17: Filo del Sol – PFS Results Summary

    FILO DEL SOL – PFS RESULTS SUMMARY Cu Copper After-Tax NPV (8%) $1.28b Avg. Annual Cu Production 67 kt Au Gold After-Tax IRR 23% Payback 3.4 Yrs Avg. Annual Au Production 159 koz Ag Silver C1 Cash Cost $1.23/lb CuEq Avg. Annual Ag Production 8,653 koz Slide 17 Filo Mining | Corporate Presentation

  18. Slide 18: Filo del Sol Project Economics

    FILO DEL SOL PROJECT ECONOMICS PFS SENSITIVITY TO METALS PRICES Metals Prices After-Tax NPV8% After-Tax IRR (Cu $/lb) / (Au $/oz) / (Ag $/oz) ($B) (%) PFS Case $3.00 / $1,300 / $20 $1.28 22.7% +10% Metals Prices $3.30 / $1,430 / $22 $1.67 26.4% +20% Metals Prices $3.60 / $1,560 / $24 $2.06 29.9% +30

  19. Slide 19: Pre-Feasibility Results

    PRE-FEASIBILITY RESULTS FILO DEL SOL – PFS RESULTS – January 2019 Pre-Tax NPV (8%) ($B) $1.86 ANNUAL METAL Pre-Tax IRR (%) 27% PFS METALS PRODUCTION PROFILES After-Tax NPV (8%) ($B) $1.28 PRICES Payable Copper After-Tax IRR (%) 23% ASSUMED 90 80 70 Undiscounted After-Tax Cash Flow ($B) $3.23 60 Tonn

  20. Slide 20: Pre-Feasibility Layout

    PRE-FEASIBILITY LAYOUT Slide 20 Filo Mining | Corporate Presentation

  21. Slide 21: Probable Mineral Reserves

    PROBABLE MINERAL RESERVES FILO DEL SOL MINERAL RESERVE STATEMENT (@ 0.01 $/T NVPT CUT-OFF) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total

  22. Slide 22: Environmental, Social and Governance (ESG)

    ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG) LAYING THE STRATEGIC GROUNDWORK FOR RESPONSIBLE MINERAL DEVELOPMENT » Lundin Group’s commitments, culture and track record set expectations for ESG » Filo’s Responsible Mineral Development Policy frames corporate approach » Alignment with International Stan

  23. Slide 23: Lundin Foundation: ESG Differentiator

    LUNDIN FOUNDATION: ESG DIFFERENTIATOR A Canadian corporate foundation whose purpose is to position Lundin Group companies as the resource developers of choice, resulting in stronger communities. SINCE OUR 2007 INCEPTION, WE HAVE DISBURSED MORE THAN $72.6M USD INTO INITIATIVES THAT ENABLE LOCAL EMPLO

  24. Slide 24: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING JAMIE BECK BOB CARMICHAEL JEFF YIP President & CEO Vice President Exploration Chief Financial Officer » More than 15 years of international » Also Vice President Exploration of » Also CFO of NGEx Minerals Ltd. project m

  25. Slide 25: Strong & Reputable Board

    STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS ADAM LUNDIN ALESSANDRO BITELLI ERIN JOHNSTON Chairman » Over 30 years of experience in the resource » Current Managing Director of the industry and in public accounting, both in North Lundin Foundation, a

  26. Slide 26: Contact Us

    Filo Mining | Corporate Presentation CONTACT US filo-mining.com Filo Mining Corp. Suite 2000 - 885 West Georgia Street Vancouver, BC, V6C 3E8 Canada FOR MORE INFORMATION CONTACT Amanda Strong Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson

  27. Slide 27: Appendix

    APPENDIX Filo Mining | Corporate Presentation

  28. Slide 28: Indicated and Inferred Resource

    INDICATED AND INFERRED RESOURCE Cu 3.1 Billion lbs Cu Copper INDICATED Cu INFERRED 1.0 Billion lbs Au 4.4 Million oz Au Gold INDICATED Au INFERRED 1.8 Million oz Ag 146.9 Million oz Ag Silver INDICATED Ag 34.8 Million oz INFERRED Refer to slide 23 for additional details regarding the reporting of th

  29. Slide 29: Mineral Resource

    MINERAL RESOURCE Slide 29 Filo Mining | Corporate Presentation

  30. Slide 30: Mineral Resource

    MINERAL RESOURCE Tonnes Cu Au Ag Lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 349.6 0.34 0.32 12.6 2,656 3,623 141,364 Oxide * See notes Inferred 103.9 0.26 0.32 8.7 585 1,083 29,067 Indicated 75.5 0.27 0.34 2.2 451 813 5,374

  31. Slide 31: Lundin Group: A History of Creating Value

    LUNDIN GROUP A HISTORY OF CREATING VALUE FOR SHAREHOLDERS IN ARGENTINA The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% Lundin

Filo Mining — Investor Presentation (February 2021) on 6ix