Igo Limited · ASX:IGO

Igo — Independence Group NL — Shareholder Meeting (November 2008)

9 slides from Igo's shareholder meeting presentation, Nov 19, 2008

  1. Slide 1: Forward Looking Statements

    FORWARD LOOKING STATEMENTS INDEPENDENCE GROUP NL Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future financial or operating performance of the Company and its projects, constitute forward-looking statements. All stat

  2. Slide 2: Long Nickel Mine (IGO 100%)

    LONG NICKEL MINE (IGO 100%) INDEPENDENCE GROUP NL HISTORY: ♦ Starting Reserve For personal use only = 26,800Ni t LONG NICKEL MINE ♦ Production to Jun08 = 46,516Ni t IGO’S CURRENT CASH PRODUCING ASSET ♦ June 2008 Resource = 75,800Ni t Purchase price = A$15M IGO Profit to date = $233.8M ♦ June 2008 Re

  3. Slide 3: Long North, McLeay and Long South intercepts; TEM equipment

    LONG NORTH - SIGNIFICANT NICKEL LONG MINE RESOURCES & RESERVES INTERCEPTS OUTSIDE RESERVES LONGITUDINAL PROJECTION For personal use only McLEAY SHOOT 3 – SIGNIFICANT NICKEL LONG MINE RESOURCES & RESERVES INTERCEPTS OUTSIDE RESERVES LONGITUDINAL PROJECTION LONG SOUTH TEM CONDUCTORS & SIGNIFICANT INTE

  4. Slide 4: Mine Geophysics Long South; Tropicana JV - New Gold Province

    MINE GEOPHYSICS LONG SOUTH SEISMIC REFLECTION SEISMIC SURVEY Low resolution trial For personal use only seismic survey coverage Long South Target MCLEAY AND LONG SOUTH SEISMIC SECTION LONG FLY THROUGH TROPICANA JV - NEW GOLD PROVINCE IGO’S SECOND CASH GENERATOR TROPICANA JV TENEMENTS AngloGold Ashan

  5. Slide 5: Tropicana JV Significant Discoveries and Intercepts

    TROPICANA JV TROPICANA & HAVANA SIGNIFICANT DISCOVERIES TO DATE SIGNIFICANT INTERCEPTS For personal use only TROPICANA & HAVANA TROPICANA JV - NEW INTERCEPTS PROPOSED OPEN CUTS OUTSIDE DEC 07 RESOURCE MODEL TROPICANA JV - HAVANA ZONE TROPICANA JV - HAVANA ZONE G X M GOLD CONTOURS SIGNIFICANT DRILL H

  6. Slide 6: Tropicana Pre-Feasibility Status; Regional Exploration Strategy

    TROPICANA PRE-FEASIBILITY STATUS TROPICANA JV – 45KM GOLD CORRIDOR Open-cut Resource: 62.8M t @ 2.0g/t Au (4.05M oz Au) at Dec 07 Open-cut Size: Target – 10 years @ +300,000oz/y For personal use only Drilling: 25m x 25m Reserves in-fill drilling and testing high-grade down plunge potential in progre

  7. Slide 7: Exploration Geophysics; Lake Lefroy and Wiluna Joint Ventures

    EXPLORATION GEOPHYSICS LAKE LEFROY JOINT VENTURES For personal use only High powered TEM transmitter truck developed in conjunction with Curtin University Squid TEM sensor Photo courtesy of Anglo American LAKE LEFROY JOINT VENTURE NORTH-EASTERN GOLDFIELDS TEM ANOMALIES OVER MAGNETICS NICKEL PROJECTS

  8. Slide 8: Duketon JV, Holleton Project and Gold Exploration Projects

    DUKETON JV – BULGE NICKEL PROSPECT DUKETON JV – BULGE PROSPECT (IGO earning 70%) NICKEL GEOCHEM ANOMALIES For personal use only JV Partner: South Boulder HOLLETON PROJECT (IGO 90-100%) IGO GOLD EXPLORATION PROJECTS REGIONAL GEOLOGY HOLLETON PROJECT (IGO 100%) MT ISDELL (IGO diluting to 49%) GIBB ROC

  9. Slide 9: Independence Corporate Goals; Resource & Reserve

    MT ISDELL – LAG GEOCHEM IMAGES KARLAWINDA (IGO – 100%) For personal use only RESOURCE & RESERVE INDEPENDENCE CORPORATE GOALS COMPETENT PERSON STATEMENT To improve shareholder returns by becoming a highly profitable, multi commodity Australian Note: The information in this report that relates to Expl

Independence Group NL — Shareholder Meeting (November 2008) on 6ix