Playfair Mining Ltd. · TSXV:PLY

Playfair Mining — Investor Presentation (June 2026)

16 slides from Playfair Mining's investor presentation, June 2026

  1. Slide 1: Country Harbour – Golden Circle Project

    Country Harbour Golden Circle Project Nova Scotia, Canada TSX.V PLY Frankfurt - P1J1 OTC - PLYFF It’s What They Left Behind That Matters June 2026

  2. Slide 2: Golden Circle Project

    2 Golden Circle Project The Golden Circle Project comprises eight former producing gold properties in a 120 km by 30 km area of central Nova Scotia. TSX.V PLY Frankfurt - P1J1 OTC - PLYFF It’s What They Left Behind That Matters June 2026

  3. Slide 3: Country Harbour

    Country Harbour Golden Circle Project 3 Nova Scotia, Canada Country Harbour is an easily accessible, historic gold producer. It is adjacent to Playfair’s Forest Hill property and is located about 12km from NexGold’s advanced Goldboro project. Gold was discovered in the Country Harbour area in 1861 b

  4. Slide 4: Country Harbour

    Country Harbour Golden Circle Project 4 Nova Scotia, Canada The main Country Harbour Gold District is about 1,500m long and 250m wide along the Johnson Brook valley. The steeply dipping bedding contains productive gold zones which strike roughly NNW-SSE and plunge to the SSE at around 25 to 35 degre

  5. Slide 5: Country Harbour

    Country Harbour Golden Circle Project 5 Nova Scotia, Canada The gold-bearing rocks in the Meguma sediments in this area have undergone a major dislocation caused by the Country Harbour Fault which has a left lateral displacement of almost 3 km. The result is that, unusually for Nova Scotia, the gold

  6. Slide 6: Country Harbour

    Country Harbour Golden Circle Project 6 Nova Scotia, Canada From 1936 to 1938, Maritime Minerals carried out serious exploration including bulk sampling at the Prince and Stuart workings together with a crosscutting adit “The Blair Adit” which was opened for 480 feet (146 m). Very encouraging result

  7. Slide 7: Country Harbour

    Country Harbour Golden Circle Project 7 Nova Scotia, Canada Underground bulk sampling on the lowest level (75 feet or 23 metres) of the Prince workings in 1938 resulted in 837 tons which were processed in the Stuart Mill. Five Mill Samples were taken over a continuous drift length of 150 feet (45.72

  8. Slide 8: Country Harbour

    Country Harbour Golden Circle Project 8 Nova Scotia, Canada At the Stuart Mine, levels were developed at 42 feet (12.8 metres) and 80 feet (24.4 metres). In 1938, a 47-ton Mill Sample was taken on the 42-foot level was reported to grade 0.34 opt (11.66 gpt) gold within a 40 foot (12.2 metre) thick b

  9. Slide 9: Country Harbour

    Country Harbour Golden Circle Project 9 Nova Scotia, Canada Country Harbour, like many other Canadian gold mines, closed in 1941 primarily because the federal government reclassified gold mining as a “non-essential industry”. Labour, machinery and materials were redirected to “war-critical” base met

  10. Slide 10: Diamond Drilling

    Country Harbour Golden Circle Project 10 Diamond Drilling Nova Scotia, Canada Only 12 drillholes are recorded on the property: • 3 holes were drilled by Maritime in 1938 along the Blair Adit. No assays are available however, later chip sampling of the Blair Adit showed 0.06 opt (2.17 gpt) gold over

  11. Slide 11: B Horizon Soil Anomalies

    Country Harbour Golden Circle Project 11 Nova Scotia, Canada Paragon (1981), Seabright (1988) and Hudgetec (2006) all carried out “B” horizon soil “B” Horizon Soil Anomalies sampling. The results were compiled by Hudgetec (2006) As Au Sb W and are shown here. The red colours represent the top 5% of

  12. Slide 12: Country Harbour

    Country Harbour Golden Circle Project 12 Nova Scotia, Canada In 1988, in addition to the soil sampling Seabright carried out gradient IP surveys and trenching. The gradient IP showed a strong high chargeability anomaly for the full 800m N-S extent of the survey. This anomaly is, in part, coincident

  13. Slide 13: Country Harbour

    Country Harbour Golden Circle Project 13 Nova Scotia, Canada The IP high chargeability response at Nexgold’s advanced Goldboro deposit is quite similar to that over the Country Harbour gold occurrences. IP High Chargeability Goldboro Country Harbour (From Signal NR) (From Anaconda Compilation) TSX.V

  14. Slide 14: Country Harbour

    Country Harbour Golden Circle Project 14 Nova Scotia, Canada Playfair plans a two-pronged $600,000 exploration program at Country Harbour comprising: • A thirteen-line-kilometer extension of the existing gradient IP and “B” horizon soil surveys. • A seventeen-hole program totaling 1,475 metres. Most

  15. Slide 15: Planned Drillholes

    Country Harbour Golden Circle Project 15 Nova Scotia, Canada Planned Drillholes A seventeen-hole program totaling 1,475 metres is planned. The holes are designed to test targets already defined by previous work. • Three holes will test the down plunge extension of mineralization previously sampled i

  16. Slide 16: Management, Share Structure, Major Shareholders

    16 Management: Share Structure: Donald G. Moore – CEO & Director Tel: 604-377-9220 Shares Outstanding 85,503,395 dmoore@wascomgt.com Stock Options 8,500,000 D. Neil Briggs – Director Tel: 604-562-2578 Warrants 42,617,427 nbriggs@wascomgt.com Greg Davison – Director Major Shareholders: Tel: 250-521-0

Playfair Mining — Investor Presentation (June 2026) on 6ix