Slide 1: Alarm Management
ABB Consulting Alarm Management © ABB Group March 24, 2015 | Slide 1
Slide 2: ABB Group
ABB Group Employees 2014 revenue Present in Formed in ~140,000 $39.8b +100 1988 countries merger of Swiss (BBC, 1891) and Swedish (ASEA, 1883) engineering companies Oil & Gas R&D Scientists & Engineers University Collaboration $6b $1.5b ~8,000 70 © ABB Group March 24, 2015 | Slide 2
Slide 3: ABB Consulting Key Facts
ABB Consulting Key Facts Aberdeen Billingham Warrington Hull © ABB Group March 24, 2015 | Slide 3
Slide 4: Key customers
Key customers © ABB Group March 24, 2015 | Slide 4
Slide 5: Product areas
Product areas Integrity Management & Asset Regeneration & Process Safety Process Engineering Operation Improvement Environmental Services Project Services Inspection and RBI Technical Training Technical Software © ABB Group March 24, 2015 | Slide 5
Slide 6: Process safety
Process safety Identification and quantifying potential safety problems together with advising on compliance with safety legislation Services provided: Fire, Explosion Alarm Consequence Fire Safety ATEX / DSEAR & Electrostatic Management Modelling Reviews Hazards Occupied Pressure HAZOP LOPA Hum
Slide 7: In this presentation
In this presentation The continuing timeline of incidents Increasing costs and public expectations How far have we come - really? Legislation guidance and standards - update Technology developments and the human in the loop Challenges and case study examples Existing systems New buil
Slide 8: Why do alarms need to be controlled?
Why do alarms need to be controlled? Alarming performance? A continuing timeline… 2005 2009 Helios Docklands Flight 522 Light Railway 1987 1998 2009 Herald Free 2005 Esso Longford Maersk Enterprise Texas City Ngujima-Yin 1984 1996 2005 Bhopal Channel Tunnel Buncefield Union Carbide Fire 1980 1990 20
Slide 9: What used to be press headlines – the costs
What used exas City to be press headlines – the costs Texas City 2005 © ABB Group March 24, 2015 | Slide 9
Slide 10: Is now 24/7 news feed Deepwater Horizon 2010
Is now 24/7 news feed Deepwater Horizon 2010 © ABB Group March 24, 2015 | Slide 10
Slide 11: Alarming performance?
Alarming performance? TEXACO MILFORD HAVEN 1994 MAERSK NGUJIMA-YIN APRIL 13TH 2009 Extract from HSE investigation report Control panel graphics did not provide necessary process overviews. Excessive number of alarms in emergency situation reduced effectiveness of operator response © ABB Group Ma
Slide 12: Alarming performance?
Alarming performance? TEXACO MILFORD HAVEN 1994 MAERSK NGUJIMA-YIN APRIL 13TH 2009 Extract from DMA report ...other important findings about equipment...included: Alarm overload in the control room (up to 3605 per day and typically in excess of 300/day) FPSO compressor damage Poor control room s
Slide 13: Maersk Ngujima-Yin April 13th 2009
Maersk Ngujima-Yin April 13th 2009 Operating in the Vincent Field off the cost of North West Australia, Nigaloo National Park Vessel originally build in 2000 and served as a VLCC until Sep 2007. Rebuilt in Singapore. In Jun-Jul 2008 the vessel was commissioned and commenced oil production 12.50
Slide 14: Legislation, guidance and standards....
Legislation, guidance and standards.... EEMUA 191 IEC 62682 ISA-18.2 Alarm systems - A guide to design, Management of alarm systems for the Management of alarm systems for the management and procurement design process industries. process industries. and management. UK HSE Health and Safety API 1167
Slide 15: EU - Seveso III
EU - Seveso III Directive 2012/18/EU of the European Parliament and of the Council of 4 July 2012 on the control of major accident hazards involving dangerous substances, amending and subsequently repealing Council Directive 96/82/EC Annex III (b) ...information on the safety management system and t
Slide 16: US DOT / PHMSA 49 CFR 195 & 192
US DOT / PHMSA 49 CFR 195 & 192 49 CFR 192.631 Hazardous Liquids 49 CFR 195.446 Natural and other Gas Control Room Management (CRM) Effective February 1st 2010 Implementation deadline (most provisions) August 1st 2011 Alarm management Implementation deadline August 1st 2012 Requirements Alarm manage
Slide 17: What has improved...
What has improved... Technology developments have facilitated HMI improvements Enhanced graphics (e.g. right click for Alarm Help) Task based displays for support in abnormal situations Use of audio and visual cues to indicate alarm priority Application of enhanced and advanced alarm metho
Slide 18: What have we neglected?
What have we neglected? In moving from this……………………………to this We have focused on the technology We are still convinced that the more alarms we have - the better protected is the plant We have lost sight of “the human in the loop” © ABB Group March 24, 2015 | Slide 19
Slide 19: Back to first principles....
Back to first principles.... What is alarm management for? From Wikipedia Alarm management is the application of human factors (or ergonomics as the field is referred to outside the U.S.) along with instrumentation engineering and systems thinking to manage the design of an alarm system to increase
Slide 20: Existing systems: The challenges
Existing systems The challenges Most owner / operators are now aware They may understand the problem But do not necessarily see the solutions Some are spending a great deal (time/ money) to achieve “compliance” Some efforts are stalling Often the solutions are more about ways of working than tec
Slide 21: Existing system project
Existing system project As described by one of our clients... Rashid Petroleum Company (Egypt) “This is what success looks like. WDDM alone had 6 trips in 2008 compared to 25 in 2007, and 17 in just the second half of 2006. This has a significant business value”. © ABB Group March 24, 2015 | Slide 2
Slide 22: Greenfield projects: The challenges
Greenfield projects The challenges Most owner / operators are now aware that they should address alarm management before handover to operations Many are doing alarm reviews to rationalise alarms Most have yet to integrate the alarm management lifecycle into their project lifecycle © ABB Group Marc
Slide 23: Greenfield projects: The challenges
Greenfield projects The challenges Most projects have an alarm philosophy Alarm Philosophy The challenge is the implementation What is the impact on those involved in the Identification project? EPC/ ICSS supplier package vendors Rationalisation How is the alarm philosophy to be Management com
Slide 24: Greenfield Project example
Greenfield Project example Series of alarm reviews held post Hazard studies and LOPA Alarm philosophy enhanced with alarm ‘rules’ agreed for current and future system design Over 35% of proposed alarms agreed as not ‘good’ alarms 78% of alarms proposed for ICSS removed All alarms prioritised
Slide 25: Success factors
Success factors What distinguishes the successes? - those who are getting it right Focus on operator (not on technology) Team / multi discipline approach Lifecycle framework Essential for holding the gains Local champion Ensures benefits identified and maintains momentum © ABB Group Marc
Slide 26: Alarm management: The ABB vision
Alarm management The ABB vision A lifecycle approach: Measure Review The main elements 1. Management responsibilities (who does what?) 2. Control of design and development 3. Testing 4. Measuring performance Improve 5. Training and competence 6. Review and continuous improvement The virtuous circle
Slide 27: Typical service components...
Typical service components... Gap analysis / scoping study ‘AM benchmark’ Training Public training events Client customised training Improvement and rationalisation projects Alarm logging and analysis Alarm system documentation / procedures Rationalisation reviews Continuous improv
Slide 28: Service offering example: Benchmark (alarm management health check)
Service offering example Benchmark (alarm management health check) © ABB Group March 24, 2015 | Slide 29
Slide 29: Service offering example - Benchmark ("AM Health Check")
Service offering example - Benchmark (“AM Health Check”) Operator + + Usefulness + Questionnaire Detailed analysis of alarm Operational system statistics. Document control system Spreadsheet ANSI/ISA-18.2-2009 Operationa Management of Alarm Systems l for the Process Industries + + + O
Slide 30: Service offering example: Improvement project
Service offering example Improvement project Benchmark Alarm Philosophy Alarm System Requirements Specification Procedural Remediation Logging and Measurement Nuisance Alarm Reduction Prioritization Technical Remediation Review © ABB Group March 24, 2015 | Slide 31
Slide 31: Recent developments....
Recent developments.... IEC 62682 Management of alarm systems for the process industries (published October 2014) Finally an international standard: Based on ISA 18.2 lifecycle concept Will give us all a common framework and common language Clearly identifies requirements as well as recommende
Slide 32: More future trends....
More future trends.... 49 CFR for CRM Seveso III 2005 2010 2015 ISA 18.2 API RP 1167 EEMUA 191 V3 IEC 62682 With all this activity in terms of legislation and standards, we should expect the focus on alarm management to continue © ABB Group March 24, 2015 | Slide 33
Slide 33: Conclusions
Conclusions The focus needs to move from technology improvements back to the strengths, constraints and needs of the mark I human operator. The advent of IEC 62682 is prompting a move to more specific requirements and expectations for good practice Regulatory Compliance Those who reap the range of b
Slide 34: My favorite quotes…
My favorite quotes… “Operator focus changed from servicing alarms to servicing the process and equipment” Simon Babb, ConocoPhillips “If you think safety is expensive, try an accident” Dr. Trevor Kletz © ABB Group March 24, 2015 | Slide 35
Slide 35: For further information contact
For further information contact Joan Evans Principal Consultant ABB Consulting Pavilion 9, Byland Way Belasis Business Park Billingham Cleveland TS23 4EB United Kingdom Tel: +44 (0)1642 372008 Mobile: +44 (0)7764 132786 Email: joan.evans@gb.abb.com www.abb.com/consulting © ABB Group March 24, 2015 |