Nicola Mining Inc. · TSXV:NIM

Nicola Mining — Investor Presentation (December 2025)

23 slides from Nicola Mining's investor presentation, December 2025

  1. Slide 1: Nicola Mining Inc. Corporate Presentation December 2025

    BRITISH COLUMBIA BASED GOLD AND SILVER PRODUCER COPPER EXPLORER NICOLA MINING INC. CORPORATE PRESENTATION DECEMBER 2025 TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS Certain st at ement s a n d projections in this presentation are forward -look ing statements a n d forward-look ing information w i t h i n the m e a n i n g of ap p l i cab l e securities laws. F orwa rd-l o ok i ng i nformat ion is frequently c

  3. Slide 3: Key Catalysts for 2026 and On

    NICOLA MINING INC. KEY CATALYSTS FOR 2026 AND ON offers a unique investment Ramp up to full capacity at the Merritt Mill opportunity combining • Commenced milling of high-grade gold under Talisker partnership in process of ✓ cash generating mill facility ramping up and receiving ore from Blue Lagoon

  4. Slide 4: Project Portfolio

    PROJECT PORTFOLIO Unique Combination of Cash Flow and Discovery Potential NEW CRAIGMONT PROJECT (100%) • Historic Craigmont Copper Mine produced 900M lbs (34Mt MERRITT MILL & TAILINGS FACILITY (100%) @ 1.28% Cu) • Only facility permitted to process third party gold • Adjacent to Highland Valley Mine

  5. Slide 5: Merritt Mill Facility

    MERRITT MILL FACILITY The only facility permitted to process gold and silver from third party sources in British Columbia. TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 5

  6. Slide 6: Merritt Mill

    MERRITT MILL Highly Strategic Mill Facility with Tremendous Third-Party Demand • The only facility permitted to process gold and silver ores from third party sources in B.C. • Over 100 small-to-medium size gold/silver deposits within trucking distance with no third-party processing alternatives to t

  7. Slide 7: Large, Modern Mill & Tailings Facility

    MERRITT MILL Large, Modern Mill & Tailings Facility • 100%-owned by Nicola Built on 980 acres of freehold, industrial zoned land with ample room for future expansions. • 200 plus tonnes per day (tpd) of installed capacity • Includes conventional crushing, grinding and flotation circuits • On 900 acr

  8. Slide 8: Milling & Profit Share Agreements in Place

    MERRITT MILL Milling & Profit Share Agreements in Place for 100% of Existing Capacity ✓ Profit sharing structure • Long-term Mining and Milling Partnership Agreement in place • Purchase contract with firm specializing in ✓ Exposure to • Up to 75K tpy of mill feed from Dome Mountain mine global tradi

  9. Slide 9: New Craigmont Project

    NEW CRAIGMONT PROJECT Historical major copper mine (~900M lbs Cu) in prolific copper belt with high- grade skarn and porphyry copper discovery potential On November 19, 2015, Nicola Mining Inc. acquired all outstanding shares of the Craigmont Project and become its sole owner1 1 News Release dated N

  10. Slide 10: New Craigmont Project

    NEW CRAIGMONT PROJECT • 100% tenure ownership of +10,800 ha property located adjacent to Nicola’s Merritt mill facility • Easily accessible via 14 km of paved roads from Merritt and adjacent to major highways (BC Highway 8 and Coquihalla) • Connected to B.C. Hydro grid power • Located in the Quesnel

  11. Slide 11: New Craigmont Project: Skarn Grades

    NEW CRAIGMONT PROJECT Skarn Grades High-grade copper-skarn mineralization has been found near the historic Craigmont Mine and in the Embayment Zone DRILLING HIGHLIGHTS FROM SKARN MINERALIZATION 1 DDH-THU-002: 85.9m @ 1.11% Cu Sep 7, 2016, news release S-100: 116.7m @ 0.54% Cu (re-sampling)2 Jan 23,

  12. Slide 12: 2025 Exploration Program

    NEW CRAIGMONT PROJECT 2025 Exploration Program • MYAB Permit allows Nicola to conduct extensive Five target areas based on analysis of geophysical and geochemical data in 2025 by ALS Geoanalytics exploration on never-before-drilled targets • Five priority targets identified using AI-tools to analyze

  13. Slide 13: Treasure Mountain Silver Project

    TREASURE MOUNTAIN SILVER PROJECT 100% owned historic high-grade Ag-Pb-Zn mine with a valid mining permit and significant exploration upside. TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 13

  14. Slide 14: Treasure Mountain Project

    TREASURE MOUNTAIN PROJECT 100% tenure ownership of ~2,200 ha property located 90-minute (by truck) south of Nicola’s Merritt Mill. Excellent regional infrastructure (access through Coquihalla Highway and seasonal roads, ~28 km from grid power). Coquihalla Highway Portal 1 Portal 2 Portal 3 Jensen Po

  15. Slide 15: Treasure Mountain Project

    TREASURE MOUNTAIN PROJECT • In the 1930s, 4,000 tons of ore was mined producing ~40K oz Au, 380K lbs Pb and 88K lbs Zn • Huldra Silver discovered a silver-rich vein over a 250 m strike length in 1985 — Between 1987 and 1989, Huldra Silver conducted exploration through four underground levels compris

  16. Slide 16: Substantial Exploration Upside

    TREASURE MOUNTAIN PROJECT Substantial Exploration Upside • MB Zone is ~800 m northwest of the current mine workings on undrilled northern flank of the mountain • Encouraging results from 2019/20 sampling programs1 — Sample 2100151: 813 g/t Ag, 0.52 g/t Au, 19% Zn and 4.66% Cu — Sample 2100152: 105 g

  17. Slide 17: Dominion Creek Project (Au-Ag)

    DOMINION CREEK PROJECT (AU-AG) Hosts high-grade Au-Ag system. 10,000-tonne bulk sample program commenced in July 2025. TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 17

  18. Slide 18: Dominion Creek Project

    DOMINION CREEK PROJECT • 75% economic interest via 50% land interest and a 50% Mining and Milling Profit Share Agreement for first 10,000 tonnes — Joint venture partner is High Range Exploration Ltd. — Ore from the Dominion Creek Property will be extracted and processed at the Merritt Mill Site • 8

  19. Slide 19: Dominion Creek 2025 New Veins

    DOMINION CREEK PROJECT 2025 New Veins West Vein 6m by 3m High Grade Gold and Substantial Exploration Upside Sample # PPM Location Sample Area DC25-12 0.526 West Vein 2m by 3m DC25-13 0.104 West Vein 3m by 3m Mid West DC25-14 0.433 Mid West Vein 0.8m across exposed vein Vein 5m DC25-15 55.172 Pit Vei

  20. Slide 20: Capital Markets Summary

    CAPITAL MARKETS SUMMARY Share Price (Last 12 Months) Capital Structure $0.60 0.8 Tickers TSXV:NIM, OTCPK:HUSI.F, DB:HLIA Volume Price 0.7 Share Price (as of Nov. 4, 2025) C$0.89 $0.50 0.6 Volume (millions) Basic Shares Outstanding 207.29 M Share Price (C$) $0.40 Options & Warrants1 11,669,477 0.5 RS

  21. Slide 21: Management / Officers

    MANAGEMENT / OFFICERS Peter Espig | Chief Executive Officer / Director Mr. Espig assumed the role of President and CEO on November 7, 2013, and guided the Company through its restructuring, which included entering the company into CCAA and successfully seeing its exit on November 21, 2014. He is exp

  22. Slide 22: Directors

    Directors Frank Hogel | Chairman / Director Mr. Hogel is an Asset Manager actively involved in the financial evaluation of companies and convertible debenture restructuring. He is on the advisory board of Concept Capital Management and has served as President and Chief Executive Officer of Peter Bec

  23. Slide 23: Corporate & Investor Contact

    Corporate & Investor Contact Bill Cawker Email: info@nicolamining.com Phone: 604-649-0080 NICOLAMINING.COM TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 23