Impact Silver Corp. · TSXV:IPT
Impact Silver — Investor Presentation (February 2007)
23 slides from Impact Silver's investor presentation, February 2007
Slide 1: Impact Silver Corp.
IMPACT SILVER CORP.
Slide 2: Cautionary Disclaimer
CAUTIONARY DISCLAIMER Certain statements in the following presentation regarding IMPACT Silver Corp.’s business operations may constitute “forward looking statements”. Such statements are not historical facts, but are predictions about the future, which inherently involve risks and uncertainties, an
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS • PRODUCTION: Operating Mines at Royal Mines of Zacualpan Option on a producing Mill in Zacatecas • EXPLORATION: Huge potential in under-explored 125 km2 silver district at Zacualpan . Newly Acquired 200km2 Silver and VMS MMR District • GROWTH: Growing position in the prolific
Slide 4: Zacualpan Location
ZACUALPAN LOCATION • The Zacualpan Project is located in the Mexican Epithermal Vein Belt • The Project is in the same area as other well known mines and development projects
Slide 5: The Zacualpan District
THE ZACUALPAN DISTRICT • Abundant vein structures • The district has a 480+ year mining history • Numerous recent and historic mines in the camp of which 2 are currently producing
Slide 6: Production - Zacualpan
PRODUCTION - ZACUALPAN • First Mining District in the America’s to receive Royal Proclamation from the Spanish Crown in 1531 • First Record of Production 1527 • Between 1975-2004 the District produced 26M silver equivalent ounces • IMPACT’s Option to purchase was acquired when silver was under $5oz
Slide 7: Production - Zacualpan Mill & Infrastructure
PRODUCTION - ZACUALPAN MILL & INFRASTRUCTURE Facilities Two Operating mines and 500 tonne/day processing plant Production Produces Silver-Lead and Zinc Concentrates Capacity At historic grades plant has the capacity to produce 2.0+ million ounces Ag per year Good Modern power grid, tailings facility
Slide 8: Operations
OPERATIONS • First Full Day of Production – January 18, 2006 • Production from Guadalupe and Salvadora Mines Q1 2006 Q2 2006 Q3 2006 Q1-Q3 Total Total Tons Produced 12,959 16,900 18,412 48,271 Daily Tons Produced 180 184 200 190 Silver Production (oz) 92,950 96,459 117,370 306,779 Lead (t) 69.55 95.
Slide 9: Production - Zacualpan Processing Plant
PRODUCTION - ZACUALPAN PROCESSING PLANT Processing Capacity: 500 tpd
Slide 10: Production - Guadalupe Mine
PRODUCTION - GUADALUPE MINE • Located only 100m from the processing plant • Mining on the 195m Level exploiting the Lipton, Intermediate and Liptonia Veins • Large Veins: Modern production largely on 2-5m wide, 50-150m long ore shoots containing medium grade mineralization • Opening up additional wo
Slide 11: Production - Guadalupe Mine
PRODUCTION - GUADALUPE MINE Historic Production of 10 Million Ounces Silver
Slide 12: Production – Salvadora Mine
PRODUCTION – SALVADORA MINE • Commenced Operations in January 2007 on Level 0 • 500m SE of Processing Plant • Operations are focused on the Lipton and Salvadora Veins • Salvadora Vein: Splay off the Lipton Vein with 2 high grade silver shoots
Slide 13: Exploration – Huge Potential
EXPLORATION – HUGE POTENTIAL • Exploration conducted through the sampling and mapping of old workings and application of modern concepts of epithermal mineral systems • Old workings tend to be shallow usually stopping at the water table • Sampling and drilling of only five workings thus far has led
Slide 14: Exploration
EXPLORATION • Dominant Land Position In Zacualpan: 125 km2 of claims covering most of silver district • Recent Discovery of High Grade Chivo Silver Shoot, Highlights include: Drill Hole Est. TW (m) Ag (g/t) Ag (oz/t) Au (g/t) Zn (%) Pb (%) 7 1.1 841 24.5 0.63 0.43 0.32 8 2.4 422 12.3 0.25 1.54 0.69
Slide 15: Growth - Zacatecas Veta Grande Silver Project
GROWTH - ZACATECAS VETA GRANDE SILVER PROJECT • Completed purchase of fifteen mineral concessions • Option to purchase a 200tpd processing plant and surface rights currently operating at full capacity as a toll-mill • Project represents consolidation opportunities in highly fragmented district • Ini
Slide 16: Growth - Veta Grande Processing Plant
GROWTH - VETA GRANDE PROCESSING PLANT 200 TPD Processing Plant
Slide 17: Growth – Veta Grande
GROWTH – VETA GRANDE Cristian Mine
Slide 18: Growth - Zacatecas Venture
GROWTH - ZACATECAS VENTURE • Actively acquiring projects in Zacatecas, keeping some and Joint Venturing others • Acquired and subsequently optioned six projects, the “Zacatecas Venture” to Yale Resources. • Yale covers the acquisition and exploration costs while IMPACT retains a direct interest as w
Slide 19: Future Plans
FUTURE PLANS • Significant Drill Program at Zacualpan and Zacatecas • Ramp up production to 500 tpd • Plant and Infrastructure Upgrades • Extensive Grass-Roots Surface Exploration at Zacualpan, Zacatecas and MMR Projects • Exercise Option on Zacatecas Processing Plant • Growth Through Exploration an
Slide 20: Summary
SUMMARY • Operating Silver mine with cash flow and profits at Zacualpan • Advanced Silver Project with an option on operating infrastructure in Zacatecas • Huge exploration potential on several large unexplored silver districts – 125 km2 land claim package that includes multiple targets assaying ove
Slide 21: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM Fred Davidson, CA President & Director Held senior management positions with Erickson Gold Mines Ltd. and TOTAL Energold Corp. Took Mt. Skukum Gold Mine from Exploration to Production. Also President of Energold Drilling Corp (EGD: TSX-V), a contract driller. George Gorzy
Slide 22: Corporate Summary
CORPORATE SUMMARY • Recent Share Price: $1.65 • Market Cap: $67 Million • Shares Outstanding: 39.5 Million (46.5M FD) Q1 2006 Q2 2006 Q3 2006 Q1-Q3 2006 Revenue $1,142,916 $1,965,192 $1,872,595 $4,980,703 Operating Profit $341,287 $428,508 $546,959 $1,315,724 Net Income $188,276 $428,508 $214,899 $8
Slide 23: Impact Silver Corp.
IMPACT SILVER CORP.
Impact Silver — Investor Presentation (February 2007) on 6ix