  1. Slide 1: Built for Growth: Investor Presentation

    BUILT FOR GROWTH Investor Presentation July 2025 | TSX: TI 1

  2. Slide 2: Forward Looking Information

    INVESTOR PRESENTATION FORWARD LOOKING INFORMATION This presentation contains "forward-looking information" within the meaning of Canadian securities laws. In some cases, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "targets", "expects", "is

  3. Slide 3: Track Record of Value Creation

    INVESTOR PRESENTATION 2025 Augusta Group Companies(2) Track Record of Value Creation C$190M Market Cap Past Augusta Group Company Returns TSX: TI C$144M Market Cap TSX: G 12,960% 3,300% 1,000% 6,100% OTCQB: AUGG Return Return Return Return SOLD for $1.6B SOLD for $667M $1.6B Market Cap(1) SOLD for $

  4. Slide 4: A Best-in-class Leadership Team

    INVESTOR PRESENTATION A Best-in-class PROVEN SUCCESS Leadership Team Mine development, operational excellence & Richard Warke EXECUTIVE CHAIRMAN Governor George Pataki DIRECTOR innovation Consistent record of creating shareholder value at Augusta Served three terms as the 53rd Governor of the State

  5. Slide 5: Capital Structure

    INVESTOR PRESENTATION SHAREHOLDER DISTRIBUTION (5)(6) Capital Structure Richard Warke High insider ownership 40% Unique positioning: junior with steady-state cash Board & flow, significant exploration upside and critical 54% Management metals strategic positioning Strong support from US EXIM as firs

  6. Slide 6: Investment Highlights

    INVESTOR PRESENTATION Investment Highlights acres of mineral rights controlled throughout the district U.S production base in upstate Significant graphite discovery at New York Empire State Mine’s (ESM)’s Existing infrastructure includes property 5,000 tpd mill, skilled The Kilbourne Graphite Projec

  7. Slide 7: Zinc: 2025 Guidance and FY2024 Production and Cost

    INVESTOR PRESENTATION 2025 ZINC GUIDANCE AND FY 24 - PRODUCTION AND COST 2025 GUIDANCE FY 2024 Zinc Achieved top end of production guidance with 59.5 mlbs payable zinc produced in 2024 Payable Production Zinc 64-69 m lbs 59.5 m lbs 2024 AISC achieved was 10% less than lower end of cost guidance, des

  8. Slide 8: Zinc: ESM #4 Mine, N2D and Turnpike

    INVESTOR PRESENTATION Zinc ESM #4 Mine, N2D and Turnpike Near term resource expansion and opportunities to increase production #4 Mine – mineralized zones plunge to northeast; potential to extend zones up and down-plunge - Underground exploration drilling following up on intercepted mineralization b

  9. Slide 9: Regional Surface Exploration - Planning

    INVESTOR PRESENTATION Regional Surface Exploration - Planning Drilling - Targeting undertested historic Zn mineralization, productive geologic units, and untested Zn anomalies in soil and rock Prioritization of targets within proximity to existing ESM infrastructure Q1 Drilling targeted Pleasant Val

  10. Slide 10: Zinc: Consistent Resource Replacement and Expansion

    INVESTOR PRESENTATION Zinc Consistent Resource Replacement and Expansion Underground Drilling at ESM Drill core from N2D Continued Growth by Increased Mine Life the Drill Bit UNDERGROUND AS OF JULY 16, 2024 Titan expects to expand its mineral Contained zinc in 2024 MRE Tons (000’s US Contained Pound

  11. Slide 11: Kilbourne Graphite Maiden Resource

    INVESTOR PRESENTATION Kilbourne Graphite Maiden Resource Strengthening the domestic critical minerals supply chain Open ~8,000 ft Open-pit constrained 43-101 inferred resource of 22 million tons at an average grade of 2.91% Cg (based on a cut-off grade of 1.50%) 653 kt of contained graphite within i

  12. Slide 12: Price Sensitivities

    INVESTOR PRESENTATION Price Sensitivities PRICING SENSITIVITIES – KILBOURNE MINERAL RESOURCE $USD per Ton Concentrate RF Graphite [%] Mill Feed [k Ton] Contained Graphite [k Ton] Waste [k Ton] Overburden [k Ton] Assumed selling price of $1090/t of concentrate providing 22mt of mill 872.00 0.80 3.30

  13. Slide 13: Metallurgy

    INVESTOR PRESENTATION Phase III-SGS (1) Metallurgy Assays (%) Composite C(t) C(g) Master 3.48 3.14 Process Optimization completed at SGS Lakefield for Master North Shallow 3.38 3.21 Composites and Variability Composites South Shallow 3.51 3.28 Master & Variability Composite Head Grades North Deep 2.

  14. Slide 14: Natural Flake Graphite Processing Facility

    INVESTOR PRESENTATION Natural Flake Graphite Processing Facility (the “Facility") Facility construction launched in May 2025 with commissioning in H2 2025. Permitting complete. Key objectives Product Qualification Path to full scale commercialization Operating Parameters 60,000 tons per annum throug

  15. Slide 15: Kilbourne Product Mix & Sectors

    INVESTOR PRESENTATION Kilbourne Product Mix & Sectors Key end products PRODUCT MIX (%) ASTM Mesh Grades Lubricants, Friction, Refractories, Drilling Fluids 15% Micronized Flake Graphite Products STD Purity 95.0% LOI MIN Carbon brush, Lubricants, Friction, Engine Seals, Plastics, Ceramics, MIL-SPEC 6

  16. Slide 16: Graphite Development Plan and Indicative Timeline

    INVESTOR PRESENTATION Graphite Development Plan and Indicative Timeline Year 0 Year 1 Year 2 & 3 (Scale Up)(1) 43-101 mineral resource estimate Infill drilling of mineral resource to FEED/Detailed engineering Technical declaration (Q4 2024) measured & indicated status Equipment orders Metallurgy Pha

  17. Slide 17: Graphite - Demand by Type and Region

    INVESTOR PRESENTATION Graphite - Demand by Type and Region NATURAL FLAKE GRAPHITE DEMAND BY GEOGRAPHY (MILLION MT) GRAPHITE MARKET DEMAND FORECAST BY APPLICATION Titan Start of Customer Deliveries and Facility Production No domestic commercial producers of China is expected to control 82% of The US

  18. Slide 18: Near Term Catalysts

    INVESTOR PRESENTATION Near Term Catalysts Zinc • District consolidation • Exploration and Exploration and production updates • Exploration updates production updates Q2 2025 H2 2025 Graphite • Final engineering/PDC • Targeted start of • PEA on Kilbourne >> Targeting 40,000t processing Equipment sele

  19. Slide 19: Appendix

    Appendix

  20. Slide 20: Kilbourne Production Process Flow Sheet

    INVESTOR PRESENTATION Screening Flake Natural Flake Crushing Flotation / Graphite ASTM Packaging -2,000 T Bulk Extraction Graphite (Processing) Drying Mesh Grades (-100, Bags; 50 lb. Paper Bags (Mining) (Concentrate) -150, +200-200) LOI MIN Micronization Conventional Hydrofluoric D90-45 Micron Feeds

  21. Slide 21: History of Exploration Success

    INVESTOR PRESENTATION History of Long production history with numerous discoveries exploration Pierrepont (1979) 120,000 Hyatt (1917) #4 (1965) #2 (1927) #3 (1946) success Titan Opens ESM Edwards (1903) NE Fowler (#4) Taylor (Hyatt) New Fold (#4) West Branch (Hyatt) Mahler (#4) Mud Pond / Davis (#4)

  22. Slide 22: Our Approach to Sustainability

    INVESTOR PRESENTATION Our Approach to Committed to localization and building partnerships that deliver long-term mutual benefits Sustainability 1 2 3 Employees uphold integrity, trust, and Community Environmental Integrity commitment to community as well as Involvement and Social and Trust Stewardsh

  23. Slide 23: Scientific and Technical Information

    INVESTOR PRESENTATION SCIENTIFIC AND TECHNICAL INFORMATION The scientific and technical information contained in this presentation relating to the Empire State Mines Zinc operations was based upon the technical report titled "Empire State Mines 2024 NI 43-101 Technical Report Update Gouverneur, New

  24. Slide 24: Contact: Vancouver and New York offices

    TSX: TI | BUILT FOR GROWTH VANCOUVER NEW YORK Suite 555 - 999 Canada Place 408 Sylvia Lake Rd Vancouver, BC Canada, Gouverneur, New York V6C 3E1 NY 13642 info@titanminingcorp.com info@titanminingcorp.com 604-687-1717 315-287-2500 VISIT US AT TITANMININGCORP.COM

Titan Mining — Investor Presentation (July 2025) on 6ix