Activex Limited · ASX:AIV

Activex — Shareholder Meeting (November 2021)

23 slides from Activex's shareholder meeting presentation, November 2021

  1. Slide 1: Focused gold, lithium and copper explorer

    ASX:AIV Focused gold, lithium and copper explorer. November 2021

  2. Slide 2: Disclaimer

    Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance of ActivEX Limited and its projects, are forward-looking statements. Such forward looking statements: ■ Are necessarily based upon a number of assumptions and estim

  3. Slide 3: How we compare to other QLD explorers

    How we compare to other QLD explorers[1] 25 EPMs covering 1,617.2 km2 Ranking Company No. of EPMs MCAP 1 Rio Tinto Exploration Pty Ltd. 69 36.0B (AUD) 2 Mount Isa Mines Ltd. (Glencore) 39 65.8B (USD) 4 Anglo American Exploration (Australia) 35 51.5B (USD) 6 ActivEX Limited 25 20.37M (AUD) 13 Evoluti

  4. Slide 4: Company snapshot

    Company snapshot Other Board and Capital structure [30 OCT 2021] shareholders Executives 40.10% 19.62% ASX Code AIV Share price $0.08 ACTIVEX Shares 203,702,577 SHAREHOLDER Options None COMPOSITION Market Capitalisation $26.57m Cash $2.03m Union Sino Great Scheme Undrawn financing facility $1.4m Glo

  5. Slide 5: Board of Directors

    Board of Directors MIN YANG Non-Executive Chairman - Appointed August 2013 Ms. Yang is an entrepreneur with over 30 years of experience in international business. In particular, Ms Yang’s expertise lies in the identification, acceleration and realisation of investments across a range of industries i

  6. Slide 6: Our Queensland Projects

    Our Queensland Projects Focus in world-class Queensland gold and copper provinces with lithium potential in Georgetown. ■ Extensive portfolio [total of 1,617.2 km2] ■ Active gold mining operations in region ■ Toll treatment options ■ Excellent infrastructure Project name Resource Ownership 1. Gilber

  7. Slide 7: Gilberton Gold Project

    Gilberton Gold Project The Kidston, Charters Towers, Mt Leyshon Region – Premier gold mines of Queensland. The world-class Kidston breccia hosted gold silver deposit occurs in similar geological terrain approximately 50km to the north-east. Gold mine Total production Kidston 3.6 Moz Au Mt Hogan Circ

  8. Slide 8: Gilberton Gold Project

    Gilberton Gold Project ■ The project comprises a total of 156 sub-blocks and encompassess an area of 508 km2. ■ Recent gold production in the from 1993 to 1995 by Eltin Minerals included: ○ Josephine Mine (open cut) 65Kt @ 4.1g/t (8K oz) and Mt Hogan Mine (open cut and underground) 405Kt @ 5.5g/t (7

  9. Slide 9: Gilberton Gold Project - Nuggets found by the prospector

    Gilberton Gold Project - Nuggets found by the prospector Gold nuggets found by local prospectors within the Gilberton Project. www.activex.com.au 08

  10. Slide 10: Gilberton Gold Project

    Gilberton Gold Project Drill hole Interval samples Grade Interval Mt Hogan Prospect AMHRC004 ■ 4m ■ @3.8g/t Au ■ From 19m, 4m composite ■ 3m ■ @3.86g/t Au and 9.78 g/t Ag ■ From 101m AMHRC005 ○ Including 1m ○ @9.78g/t Au and 13.3 g/t Ag ○ From 101m ■ 1m ■ @4.23g/t Au ■ From 109m AMHRC0010 ■ 2m ■ @4.

  11. Slide 11: Mt Hogan Drilling - NW SE Cross Section

    Mt Hogan Drilling - NW SE Cross Section ■ Mt Hogan was the largest gold producer within the Gilberton Gold Project. ■ Records of historic production date back to 1876-1877, when 106.9kg of bullion were produced. ■ Mining recommenced in 1885 until 1910, and 341.22kg of bullion were produced from 7,01

  12. Slide 12: Gilberton Gold Project - Mt Hogan Drilling

    Gilberton Gold Project - Mt Hogan Drilling www.activex.com.au 11

  13. Slide 13: Gilberton Gold Project - Mt Hogan Pit Sampling

    Gilberton Gold Project - Mt Hogan Pit Sampling Face sampling in the Mt Hogan Open Pit returned assays to 33.2g/Au and grades in the shallow dipping quartz vein of 7.55 and 8.81g/t u. www.activex.com.au 12

  14. Slide 14: Georgetown Gold Project

    Georgetown Gold Project Kidston / Charters Towers / Mt Leyshon Region – Premier gold mines of Queensland. ■ Located 80km north of the Gilberton Gold Project and 10-40km south of Georgetown. ■ Comprises 3 granted tenements and 1 applications. ■ 250K tpa gold processing plant located 5km south of Geor

  15. Slide 15: Georgetown Lithium Potential

    Georgetown Lithium Potential ■ The Company will shortly begin sampling pegmatites for the potential of lithium-caesium-tantalum (LCT) mineralisation. ■ Lepidolite (Lithium Mica) Pegmatites have been noted within the Buchannan Leucogranite to the NW of EPM 27812 ■ Queensland Government mapping shows

  16. Slide 16: Coalstoun Lakes Copper Project

    Coalstoun Lakes Copper Project ■ The Coalstoun Lakes Copper and Gold Project consists of tenement EPM 14079, which comprises 46 sub-blocks and encompass an area of 142 km2 ■ Focus is high grade zones and extensions of supergene secondary copper and to expand and upgrade the Mineral Resources (includ

  17. Slide 17: Barambah Gold Project

    Barambah Gold Project ■ The project tenure comprises EPM 14937 for a total of 9 sub-blocks and encompass an area of 28 km2. The Aranbanga Volcanic Group is host to numerous auriferous epithermal quartz vein systems and deeper CSAMT targets along the main Barambah trend which to date remain partially

  18. Slide 18: Cloncurry Copper Project

    Cloncurry Copper Project World Class mineral province – Cu, Pb/Zn, Au, U, REE and P resurgent province ■ The Project is situated in northeast Queensland, approximately 60km south of Cloncurry. ■ The Project consists a total of 135 sub-blocks and encompasses an area of 432km2. ■ Located in the copper

  19. Slide 19: Cloncurry Copper Project

    Cloncurry Copper Project Florence Bore North and South: ■ Total Inferred Mineral Resource of 1.61Mt @ 0.77% Cu and 0.15g/t Au (for 12,398t Cu and 7,607oz Au contained, 0.5% Cu cut-off – JORC (2012)). ■ Florence Bore North and South deposits have associated conductivity (SAM) anomalies ■ Several cond

  20. Slide 20: Joint Venture Tenements Projects

    Joint Venture Tenements Projects BALLYMORE RESOURCES – RAVENSWOOD GOLD & COPPER ■ Ballymore spends $500K to earn 51%* ■ Ballymore spends $2M to earn 80% ■ Tenement package can be purchased prior to milestones for $5M ■ AIV can elect to contribute at 49% and 20% shareholding ■ If ActivEX’ holding < 1

  21. Slide 21: Key takeaways

    Key takeaways Highly endowed gold and copper Significant land position of 1,617.2km2. provinces in Queensland. JORC 2012 compliant gold and copper All statutory requirements met. ✔ resources. Proximity to operating gold and copper Excellent relations with pastoralists and mines. traditional owners.

  22. Slide 22: Competent Person's Statement

    Competent Person’s Statement NOTES SPECIFIC - ASX ANNOUNCEMENTS The following announcements were lodged with the ASX (including supporting JORC Reporting Tables) and details for each of the sections noted in this Presentation and can be found in the announcements. Note that these announcements speci

  23. Slide 23: ASX:AIV

    ASX:AIV 2/3B Macquarie Street Sydney NSW 2000 admin@activex.com.au www.activex.com.au (02) 9251 9088

ActivEX — Shareholder Meeting (November 2021) on 6ix