Toreador Resources Corp

Toreador Resources — Investor Presentation (March 2011)

15 slides from Toreador Resources's investor presentation, Mar 25, 2011

  1. Slide 1: Forward-looking Statements

    2 This presentation includes "Forward-looking Statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical facts included in this presentation, including

  2. Slide 2: Toreador Overview

    3 Assets Paris Basin, France (100% Crude Oil) About 1.9 million gross acres(1) of which about 0.9 million gross acres pending competitive award Conventional: Production, Reserves, Exploration Unconventional: Exploration. Investment Agreement(2) with Hess signed on May 10, 2010 for Paris Basin. Total

  3. Slide 3: A Leading Position in Paris Basin

    4 A Leading Position in Paris Basin Acreage position Toreador/Hess (including pending signature and pending competitive award)

  4. Slide 4: Conventional Exploration Wells and Production

    5 Conventional Exploration Wells and Production Number of Wells Drilled (Paris Basin) Production Paris Basin Activity over the Last 50 Years 10,000 20,000 30,000 40,000 50,000 60,000 70,000 1961 1964 1967 1970 1973 1976 1979 1982 1985 1988 1991 1994 1997 2000 2003 2006 2009 bbls per day Other France

  5. Slide 5: Paris Basin – Stable & Attractive

    6 Paris Basin – Stable & Attractive 53.1% Operating Netback – Production costs – Surface costs – Oil Transportation – Production Taxes – Local G&A 2010 Operating Netback (based on oil price of US$76.67/bbl) A mature oil producing basin with a favourable fiscal regime Source: Toreador 10-K, Twelve mo

  6. Slide 6: Paris Basin Geography & Infrastructure

    7 Paris Basin Geography & Infrastructure Sparsely populated, rural environment, access to good infrastructure Grandpuits processes Paris Basin crude Chateau Thierry Grandpuits has a crude oil processing capacity of 100,000 bbls per day Paris Seine Crude Oil Gas Refined products Crude Oil Crude Oil 5

  7. Slide 7: European Shale Landscape: Key Basins & Players

    8 European Shale Landscape: Key Basins & Players Significant interest from large independents & Majors across Europe

  8. Slide 8: Paris Basin Tight Rock Oil Highlights

    9 Paris Basin Tight Rock Oil Highlights A new, significant resource play in Europe focused on oil, close to market in an attractive and stable fiscal environment Numerous similarities between the North American Bakken Shale and the French Liassic Source Rock Two vertical fracks by another operator (

  9. Slide 9: Paris Basin Tight Rock Oil: Similar lithology to the Bakken

    10 Meters Feet Similar lithology to the Bakken Same scale Paris Basin Williston Basin (Bakken) Paris Basin Tight Rock Oil

  10. Slide 10: Paris Basin Tight Rock Oil Size of the Prize

    11 Paris Basin Tight Rock Oil Size of the Prize Schistes Carton Sinemurian / Hettangian Shale Banc de Roc Amaltheus Shale 30 billion bbls 10 billion bbls 60 billion bbls Total oil generated in the Paris Basin(1) Amount generated on permit from layer , or . X % Amount generated which has not migrated

  11. Slide 11: Paris Basin Tight Rock Oil Metrics

    12 Paris Basin Tight Rock Oil Metrics Paris Basin Tight Rock (Company estimates) Bakken Cost of a well (in US$ million) 5 – 7(1) 10 6 Days per well 30 – 40 50 25 Initial production (bbls per day) 400(2) 800+ Reserves per well (thousands bbls) 500(2) 400 – 1,000 Well spacing (acres) 640(2) 1,280 320

  12. Slide 12: Pilot Wells Study: Paris Basin Project Plan

    13 6 Pilot Wells Study T-208 Planned this year, timing influenced by the CGIET-CGEDD study Hess/Toreador 2011 budget = US$56 million Source: Toreador press release 9 November 2010, 14 February 2011 Well Permitting (first four locations) Well Design Environmental Impact Assesment Drilling rig tender

  13. Slide 13: Vertical Pilot Well Design

    14 Vertical Pilot Well Design Aquifer protection The KCA Deutag T208 rig was contracted in November 2010 Voluntarily delayed start of program following meeting with the government on 10 Feb 2011 First four wells are permitted and are vertical wells (of which there are over 2,000 in the Paris Basin)

  14. Slide 14: Possible Development Well Design

    15 Possible Development Well Design Horizontal Well Water well (private) Water well (municipal) More than one million hydraulic stimulations have been performed worldwide since 1948 A few mm in diameter Vertical depth of approximately 2600m Double steel casing (diameter of about 20cm) Triple casing

  15. Slide 15: Key Points

    16 Key Points Geology and our in-depth analysis supports our view that the Paris Basin has significant shale oil potential The Hess joint venture brings extensive US drilling & completion technology to the Paris Basin for the first time and de-risked the play The next 12 months will be critical for

Toreador Resources — Investor Presentation (March 2011) on 6ix