Robyg S.A. · GPW:ROB

Robyg — Q1 2023 Earnings Presentation

60 slides from Robyg's earnings presentation, June 2023

  1. Slide 1: Financial Results 1Q 2023

    Slide 1: Financial Results 1Q 2023

    FINANCIAL RESULTS 1Q 2023 Warsaw, June 2023 1

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Estimated financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary 1Q 2023

    Slide 3: Part 01 Summary 1Q 2023

    ROBYG PART 01 Summary 1Q 2023

  4. Slide 4: Summary 1Q 2023: revenues, cash, operating cash flow

    Slide 4: Summary 1Q 2023: revenues, cash, operating cash flow

    01. Summary 1Q 2023 Summary Revenues: Strong cash position*: Operating cash flow: PLN 222 million PLN 298 million PLN 67 million 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary 1Q 2023: units presold and on offer

    Slide 5: Summary 1Q 2023: units presold and on offer

    01. Summary 1Q 2023 Summary Developer agreements signed: Units presold: 894 736 (net after cancellations) (net after cancellations) Number of units under Units on offer: 3 491 construction: 4 566 (out of which 5% finished goods) 5

  6. Slide 6: Financial activities

    Slide 6: Financial activities

    01. Summary 1Q 2023 ROBYG Group – financial activities Total new financing: PLN 75 million CREDIT FACILITIES • revolwing loan with the limit of PLN 75 million BONDS • redemption of bonds (PA series) PLN 237 million 6

  7. Slide 7: Part 02 Presale & revenue perspective

    Slide 7: Part 02 Presale & revenue perspective

    PART 02 Presale & revenue perspective 7

  8. Slide 8: Presale structure (quarterly)

    Slide 8: Presale structure (quarterly)

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1 2023: 894 units (14% Q1’23/Q1’17-22*), PLN 468 million (48% Q1’23/Q1’17-22*) Net number of presold units (quarterly) 1196 1110 1032 938 894 755 638 650 606 445 381 162 Q2 2020 Q3 2020 Q4 2020 Q1 2021 Q2 2021 Q3 2021 Q

  9. Slide 9: Presale structure (annually)

    Slide 9: Presale structure (annually)

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1 2023: 894 units (14% Q1’23/Q1’17-22*), PLN 468 million (48% Q1’23/Q1’17-22*) Net number of presold units (annually) 4276 4308 57% 17% 3471 98% -50% -50% -27% 27% 2957 2% 2738 10% 2520 2569 -16% 2333 22% 2118 2156 2114

  10. Slide 10: Presale structure by city

    Slide 10: Presale structure by city

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1 2023: 894 units (14% Q1’23/Q1’17-22*), PLN 468 million (48% Q1’23/Q1’17-22*) Gdansk & Gdynia 35% 310 units Poznan <1% 7 units Wroclaw 6% 55 units Warsaw 59% 522 units 10 * The average number/value of contracted units

  11. Slide 11: Units on offer

    Slide 11: Units on offer

    02. Presales & revenue’s perspective ROBYG Group – units on offer FINISHED GOODS ON OFFER: 5% 5187 4925 33 4386 27 298 3491 190* 2306 5154 4898 30 4088 3301 2276 1Q 2022 2Q 2022 3Q 2022 4Q 2022 1Q 2023 Units under construction** Units completed * The offer is decreased by 3 commercial units which ar

  12. Slide 12: Revenue recognition

    Slide 12: Revenue recognition

    02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 31 March 2023) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not recognized: 3 494 2308 Completed: 193 Under construction: 1 630 1555 Which construction

  13. Slide 13: Units to be completed in 2023-2024

    Slide 13: Units to be completed in 2023-2024

    02. Presales & revenue’s perspective Number of units to be completed in 2023-2024 and also (contracted) until 31 March 2023 ( Note: Estimation of the completed investments may change. Total & Presold 2022 2023 2024 2023+2024 Total Presold Total Presold Total Presold Total Presold units units units u

  14. Slide 14: Units to be completed in 2023

    Slide 14: Units to be completed in 2023

    02. Presales & revenue’s perspective Number of units to be completed in 2023 Gdansk Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2023 completed in 2023 completed in 2023 Nowa Letnica 390 Mój Ursus 720 Jagodno

  15. Slide 15: Units to be completed in 2024

    Slide 15: Units to be completed in 2024

    02. Presales & revenue’s perspective Number of units to be completed in 2024 Gdansk Warsaw Wroclaw Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2024 completed in 2024 completed in 2024 Porto 248 Mój Ursus 677 Osiedle nad Widawą - WPB

  16. Slide 16: Part 03 Estimated financial result

    Slide 16: Part 03 Estimated financial result

    PART 03 Estimated financial result 16

  17. Slide 17: Estimated financial results

    Slide 17: Estimated financial results

    03. Estimated financial results Estimated financial results (PLNk) Q1 2023 Q1 2022 Change Revenues 221 586 127 917 73,2% Cost of sales (163 330) (95 982) 70,2% Gross profit on sales 58 256 31 935 82,4% Selling and marketing expenses (7 500) (6 198) 21,0% Administrative expenses (11 812) (11 468) 3,0

  18. Slide 18: Estimated financial condition

    Slide 18: Estimated financial condition

    03. Estimated financial results Estimated financial condition (PLNk) Q1 2023 Q1 2022 Change Q1-4 2022 Total assets, including: 3 327 347 3 387 167 (1,8%) 3 522 878 Non-current assets, including: 599 412 749 564 (20,0%) 664 070 Investment properties and investment 461 042 585 627 (21,3%) 517 050 prop

  19. Slide 19: Estimated statement of cash flow

    Slide 19: Estimated statement of cash flow

    03. Estimated financial results Estimated statement of cash flow (PLNk) Q1 2023 Q1 2022 Net cash flows from operating activities, including: 67 121 216 073 Expenditures for the purchase of new plots - (2 800) Net cash flows from investing activities, including: 1 107 183 785 Net cash flows from fina

  20. Slide 20: Debt financing

    Slide 20: Debt financing

    03. Estimated financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at March 31st, 2023 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years 3-4 years 4-5 years Over 5 years Total BANK CREDIT 300.00 0.00 0.00 0.00 0.00 0.00 300.00 FACILITIES BONDS 60.00 100.0

  21. Slide 21: Leverage and collections

    Slide 21: Leverage and collections

    03. Estimated financial results Leverage and collections as at March 31st, 2023 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = 0.38 granted – intercompany loans – cash and cash equivalents – amounts kept on individual e

  22. Slide 22: Part 04 Plans of ROBYG Group

    Slide 22: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 22

  23. Slide 23: Strategy

    Slide 23: Strategy

    04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

  24. Slide 24: Strategic goals

    Slide 24: Strategic goals

    04. Plans of ROBYG Group Strategic goals Number of presold of residential units in 2023 app. 2.500 units Increase of sales in the years ahead Accumulating financial resources to strengthening liquidity Maintaining the margins Realisation of the ROBYG’s ESG strategy 24

  25. Slide 25: Land bank

    Slide 25: Land bank

    04. Plans of ROBYG Group Total land bank 13 825 units + 3 491 units on offer = 17 316 units Gdansk/Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Śródmieście/Gdynia 610 21% Włochy 2 080 32% Other* 1 150 100% Pi

  26. Slide 26: Commercial potential

    Slide 26: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 55 000 sqm of usable area Commercial potential = 55 000 sqm of usable area WROCLAW* POZNAN 35 000 20 000 TOTAL: 55 000 sqm 26 * Preliminary land purchase agreements.

  27. Slide 27: Part 05 ESG

    Slide 27: Part 05 ESG

    PART 05 ESG Creating people and planet friendly spaces 27

  28. Slide 28: ESG: mission, values, directions

    Slide 28: ESG: mission, values, directions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and care for that are integrated with the surrou

  29. Slide 29: ESG – Environmental dimension

    Slide 29: ESG – Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals ROBYG for Planet means that we lead a sustainable development proce

  30. Slide 30: ROBYG Green Standard

    Slide 30: ROBYG Green Standard

    05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG GREEN STANDARD 30

  31. Slide 31: ESG – Social dimension

    Slide 31: ESG – Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction For us, construction is part of a new community shaping Strategic Goals process, which combines such el

  32. Slide 32: Human Balance

    Slide 32: Human Balance

    05. ESG – Social dimension ROBYG FOR PEOPLE HUMAN BALANCE 32

  33. Slide 33: ESG – Governance dimension

    Slide 33: ESG – Governance dimension

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website www.esg.robyg.pl We act responsibly by choosing to partner with local businesses, ▪ ROBYG ESG Strategy caring for

  34. Slide 34: ESG

    Slide 34: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  35. Slide 35: Part 06 Appendices

    Slide 35: Part 06 Appendices

    PART 06 Appendices 35

  36. Slide 36: Senior Management Team

    Slide 36: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 15 Y

  37. Slide 37: Ownership structure

    Slide 37: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 37

  38. Slide 38: TAG Immobilien AG consolidated financials

    Slide 38: TAG Immobilien AG consolidated financials

    06. Appendices TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) 2022 2021 2020 2019 2018 Assets 8 214,6 7 088,6 6 478,0 5 647,0 5 033,3 Equity 3 307,7 3 129,5 2 681,5 2 394,2 2 048,3 EBITDA (adjusted) 233,5 226,1 222,3 214,7 206,4 Consolidated net profit 117,3 585,6 402,6 456,4

  39. Slide 39: Investments under construction (1)

    Slide 39: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 40 No. of stages: 8 No. of stages: 14 Stages completed:

  40. Slide 40: Investments under construction (2)

    Slide 40: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Nowa Letnica Young City 2 Modern City City: Gdansk City: Warsaw City: Warsaw District: Letnica District: Bemowo District: Bemowo No. of stages: 15 No. of stages: 5 No. of stages: 9 Stages completed: 14 Stages completed: 1 Stages comp

  41. Slide 41: Investments under construction (3)

    Slide 41: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Jagodno Osiedle Życzliwa Praga Nadmotławie Estate City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Tarchomin District: Śródmieście No. of stages: 10 No. of stages: 7 No. of stages: 12 Stages completed: 4 Stages comp

  42. Slide 42: Investments under construction (4)

    Slide 42: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Moment Mój Ursus Lagom City: Gdansk City: Warsaw City: Gdansk District: Ujeścisko District: Ursus District: Ujeścisko No. of stages: 4 No. of stages: 8 No. of stages: 1 Stages completed: 1 Stages completed: 5 Stages under constructio

  43. Slide 43: Investments under construction (5)

    Slide 43: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Szumilas Royal Residence Porto City: Gdansk (Kowale) City: Warsaw City: Gdansk District: Wilanów District: Nowy Port No. of stages: 6 No. of stages: 7 No. of stages: 17 Stages completed: 1 Stages under construction*: 5 Stages complet

  44. Slide 44: Investments under construction (6)

    Slide 44: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Sea Salt Początek Piątkowo Sady Ursynów City: Gańsk City: Poznań City: Warsaw District: Zaspa District: Piątkowo District: Ursynów No. of stages: 1 No. of stages: 6 No. of stages: 5 Stages under construction*: 1 Stages under construc

  45. Slide 45: Investments under construction (7)

    Slide 45: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Wiśniowa Aleja VISTA Dożynkowa 43 City: Gdańsk City: Gdańsk City: Wrocław District: Ujeścisko District: Piecki-Migowo District: Krzyki No. of stages: 2 No. of stages: 1 No. of stages: 1 Stages under construction: 2 Stages under const

  46. Slide 46: Investments under construction (8)

    Slide 46: Investments under construction (8)

    06. Appendices Description of investments – under construction (8) Osiedle nad Widawą Rytm Mokotowa Praga Piano City: Wrocław City: Warszawa City: Warszawa District: Psie Pole District: Mokotów District: Praga Południe No. of stages: 1 No. of stages: 6 No. of stages: 1 Stages under construction: 1 S

  47. Slide 47: Investments under construction (9)

    Slide 47: Investments under construction (9)

    06. Appendices Description of investments – under construction (9) Jutrzenki 92 Wendy City: Warszawa City: Gdynia District: Włochy District: Śródmieście No. of stages: 1 No. of stages: 5 Stages under construction*: 1 Stages under construction*: 1 No. of units: 133 units No. of units: 780 units Total

  48. Slide 48: Investments completed (1)

    Slide 48: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  49. Slide 49: Investments completed (2)

    Slide 49: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  50. Slide 50: Investments completed (3)

    Slide 50: Investments completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  51. Slide 51: Investments completed (4)

    Slide 51: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  52. Slide 52: Investments completed (5)

    Slide 52: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  53. Slide 53: Investments completed (6)

    Slide 53: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  54. Slide 54: Investments completed (7)

    Slide 54: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  55. Slide 55: Investments completed (8)

    Slide 55: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  56. Slide 56: Investments completed (9)

    Slide 56: Investments completed (9)

    06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

  57. Slide 57: Investments completed (10)

    Slide 57: Investments completed (10)

    06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

  58. Slide 58: Investments completed (11)

    Slide 58: Investments completed (11)

    06. Appendices Description of investments – completed (11) Kameralna Olszówka Apartamenty przy metrze City: Wrocław City: Warsaw District: Krzyki District: Bemowo No. of stages: 1 No. of stages: 1 No. of units: 55 units No. of units: 88 units Total sellable area: ca. 3,2k sqm Total sellable area: ca

  59. Slide 59: Disclaimer

    Slide 59: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

  60. Slide 60: Summary 1Q 2023 – contact

    Slide 60: Summary 1Q 2023 – contact

    Summary 1Q 2023 Please contact us: Units presold: 894 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl (22) 419 11 00 Developer agreements signed: 736 (net after cancellations) Units on offer: 3 491 (out of which 5% are finished goods) Revenues: PLN 222 million Strong cash pos

Source: company website

More decks from Robyg S.A.

All 64 Robyg decks