Elia Group SA/NV · EURONEXT:ELI

Elia Group SA/NV — Technical Presentation (April 2018)

39 slides from Elia Group SA/NV's technical presentation, Apr 20, 2018

  1. Slide 1: EU Netcode Emergency & Restoration

    EU Netcode Emergency & Restoration Users group WGSO 20/04/2018 Peter Van Meirhaeghe (Elia NCC –Emergency plan)

  2. Slide 2: Agenda

    Agenda 1. Feedback previous WGSO meeting 2. Introduction application field NC ER 3. Significant grid users 4. From reddingscode to System Defense Plan 5. From heropbouwcode to Restoration Plan 6. Presentation of Benchmark study of EU TSOs for sourcing restoration services 7. Communication during Eme

  3. Slide 3: Feedback previous WGSO meeting

    Feedback previous WGSO meeting NC Emergency and Restoration 3

  4. Slide 4: Approval of MoM Users Group WGSO 12/12/2017

    Approval of MoM Users Group WGSO 12/12/2017 Comment: Comments relative to the Introduction to NC Emergency and Restoration presentation • Febeliec: demand facilities providing DR and distribution connected: are these SGU? Elia: according to the NC, no • Febeliec: what about units or even CDS (up to

  5. Slide 5: Introduction application field NC ER

    Introduction application field NC ER NC Emergency and Restoration 5

  6. Slide 6: Application field of the NC ER: different operational system states

    Application field of the NC ER: different operational system states • Normal activation of reserves. Criteria system states in Normal • Strategische reserve System Operation • Normal topological control actions Guidelines (SOGL) art 18 • Remedial actions to bring the system back to normal Alert • Ex

  7. Slide 7: General overview EU NC Emergency & Restoration

    General overview EU NC Emergency & Restoration 1. General Provisions Subject matter and scope, Definitions, Regulatory aspects and approval, Recovery of costs, Consultation and coordination, Confidentiality obligations, Agreement with TSOs not bound by this Network Code Art. 1 - 10 2. System Defence

  8. Slide 8: Deliverables: Elia shall submit to the NRA/other for approval by 18.12.18

    Deliverables: Elia shall submit to the NRA/other for approval by 18.12.18 NRA/Other a) T&C to act as defense service providers if on a contractual basis; NRA/Other b) T&C to act as restoration service providers if on a contractual basis; NRA/Other c) List of SGUs … and the list of the measures to be

  9. Slide 9: Macro Planning

    Consultation report and preparation of docs Macro Planning 13/11/2018 - 18/12/2018 Public consultation 01/10/2018 - 12/11/2018 Users group WGSO Users group WGSO Documents to 26/06/2018 18/09/2018 NRA/Other Users group WGSO 18/12/2018 20/04/2018 Data to RSC 2018 Apr May Jun Jul Aug Sep Oct Nov Dec 20

  10. Slide 10: NC E&R – Significant Grid User definition

    NC E&R – Significant Grid User definition NC Emergency and Restoration 10

  11. Slide 11: NC E&R - Significant Grid User Scope

    NC E&R - Significant Grid User Scope Regulation shall apply to following SGUs (art 2): Existing + new PGM type C & D Significant Grid Users Existing+new PGM type B identified for SDP or RP (NC E&R) Existing+new transmission connected demand facilities Existing+new transmission connected CDS Provider

  12. Slide 12: Proposal for SGU identified in System Defense Plan (art 11.4c)

    Proposal for SGU identified in System Defense Plan (art 11.4c) • PGM of type D • PGM of type C (e.g. CHPs 45 MW) • existing and new Transmission connected CDS • existing and new transmission-connected demand facilities; • providers of redispatching of power generating modules or demand facilities by

  13. Slide 13: High priority SGU in System Defense Plan

    High priority SGU in System Defense Plan High priority SGUs A part of the Significant Grid Users, as defined in the NC E&R, for which the specific conditions apply for disconnection and re- energization. No additional HP SGUs compared to those defined in Federal Grid Code 1. TSOs and DSOs technical

  14. Slide 14: System Defense Plan

    System Defense Plan Reddingscode Systeembeschermingsplan Code de sauvegarde Plan de défense du réseau

  15. Slide 15: 3 automatic control schemes in the System Defense Plan

    3 automatic control schemes in the System Defense Plan Art 15 • Generators increase injection (LFSM-U) Low • Storage systems stop/reduce offtake and switch to injection frequencies • Automatic low frequency demand disonnection(*) • Mandatory actions Art 16 • Legal basis: connection High • Generators

  16. Slide 16: Art 16: over frequency control scheme

    Art 16: over frequency control scheme Proposed reduction ratio for Continental Europe 50,2 Hz 5% with tolerance range between 2% and 12% • For units participating to FCR: does the p/f controller continue reducing power injection for frequencies above 50,2 Hz? If yes, what droop factor is used? • For

  17. Slide 17: 5 manual procedures in the System Defense Plan

    5 manual procedures in the System Defense Plan Art 18 • TSO adapts LFC modus • SGU identified Frequency • Active power set-point to SGU and DSP or disconnection • DSP deviations >200mHz • Switch storage systems to injection or disconnect those offtaking • Storage • Coordination actions with other TS

  18. Slide 18: General principles in case of incident

    General principles in case of incident 1. We count on spontaneous market reactions to solve imbalances in addition to the activation of reserves by Elia (in Probid). 2. During a sudden incident for which a fast reaction should be ensured, the timing is not long enough to wait for reactions based on

  19. Slide 19: Generic commands

     Generic signals, Scada to Scada, that trigger a Generic commands (set of) predetermined action(s) for every • Name “Alarm Elia” changed in “Emergency Elia” stakeholders • Sent only in the Emergency State AND when actions from the System Defense Plan are required • “Be prepared” signal to stakehold

  20. Slide 20: Defense Service Providers

    Defense Service Providers NC Emergency and Restoration 20

  21. Slide 21: Defense Service Provider (DSP)

    Defense Service Provider (DSP) • DSP = legal entity with legal or contractual obligation to provide a service contributing to one or several measures of the System Defense Plan (SDP) • In Belgium, transmission or distribution connected entities who want to offer demand side management or provide fle

  22. Slide 22: Restoration Plan

    Restoration Plan Heropbouwcode Systeemherstelplan Code de reconstruction Plan de reconstruction du réseau

  23. Slide 23: 3 sections in the Restoration Plan

    In particular, the restoration plan shall include: 3 sections in the Restoration Plan (a) a list of the measures to be implemented by the TSO and DSOs on its installations; Re- • Top Down (from neighbour TSO) (b) a list of the SGUs and a list of the measures to be energization • Bottom up, using bla

  24. Slide 24: Lists to be included in the restoration plan

    Lists to be included in the restoration plan • Proposal for SGUs identified in restoration plan (art 23.4c) • PGM of type D, PGM of type C (e.g. CHPs 45 MW) • High Priority SGU for Restoration plan • Auxiliaries of nuclear power plants • Important Fluxys sites • Substations Essential for restoration

  25. Slide 25: Restoration Service Provider (RSP)

    Restoration Service Provider (RSP) RSP = legal entity with legal or contractual obligation to provide a service contributing to one or several measures of the Restoration Plan (RP) Terms and conditions for Restoration Services • Volume needed in the restoration plan • Technical requirements • Sourci

  26. Slide 26: Timing T&C Restoration Service Provider

    Timing T&C Restoration Service Provider 2018 2019 2020 2021 Black Start AS Incentive + T&C T&C RSP v1.0 RSP v1.0 submission to NRA 18/12 + 6M: 18/06 ? NRA decision T&C = ‘entry into force’ of T&C RSP v1.0 AS ‘Restoration services’ T&C RSP v2.0 Use feedback T&C RSP 2.0 T&C RSP v2.0 submission to NRA

  27. Slide 27: Presentation of Benchmark study of EU TSOs for sourcing restoration services

    Presentation of Benchmark study of EU TSOs for sourcing restoration services 1. European Benchmark: high-level overview of European sourcing of restoration services 2. Specific cases  Overview  Summary 3. Conclusions 4. Next steps NC Emergency and Restoration 27

  28. Slide 28: Benchmark – High level overview

    Benchmark – High level overview 13 European countries (7 cases analyzed in more detail): Belgium, Denmark, Estonia, France, Great Britain, Germany, Italy, the Netherlands, Norway, Poland, Republic of Ireland, Spain, Switzerland Restoration services Production type Sourcing methods Remuneration Black

  29. Slide 29: Specific cases - Overview

    Specific cases - Overview 7 European countries:  Belgium  Neighboring countries: France (mandatory unpaid + houseload), Great Britain (tender or bilateral), Germany (bilateral + regulated), the Netherlands (tender + houseload)  Denmark (HVDC + tender), Republic of Ireland (Tender + regulated pric

  30. Slide 30: Specific cases - Summary

    Specific cases - Summary GER – 50 Hertz FRA IRE BEL GB NED DEN control area Zones 7 1 [confidential] 5 6 3 2 4 (1 as system # Black start sites N/A 21 5 18 (6 x 3) 6 (3 x 2) 4 relevant reserve) Houseload + black Black start + Black start / Brown Restoration service start in support of Houseload mand

  31. Slide 31: Conclusions (1)

    Conclusions (1) No clear ‘trend’ with respect to: - Sourcing method: o Tenders, mandatory services, bilateral negotiations are all used to procure restoration services o Interesting: use a tender or bilateral negotiations depending on the situation (the need for a black start unit, the amount of com

  32. Slide 32: Conclusions (2)

    Conclusions (2) Clear ‘trend’ with respect to: - Number of restoration service providers: o Amount and geographic distribution of service providers seems comparable (or higher) than in Belgium. o Often more than one provider in the same zone  Benchmark indicates a risk averse strategy at TSO side w

  33. Slide 33: Conclusions (3)

    Conclusions (3) With respect to type of providers: - Production types: o Conventional thermal plants and pump-storage units o Several examples of HVDC (contracted or owned/ full service or back-up) o Some cases with smaller plants (hydro or gas turbines): cascade effect, used to start up larger unit

  34. Slide 34: Next steps

    Next steps  Finalize benchmark study  The benchmark report will be published end 2018 as part of the “Incentive CREG – Black Start study”  Use benchmark as input in the redesign of the restoration services 34

  35. Slide 35: Critical tools & facilities

    Critical tools & facilities

  36. Slide 36: Art 40 Information exchange when in Emergency, Blackout and Restoration states

    Art 40 Information exchange when in Emergency, Blackout and Restoration states • TSO will send “Emergency Elia” signal to SGUs and DSOs via Scada to Scada. Renaming of Emergency • This means that they should be standby for upcoming instructions from Elia. current “alarm Elia” • TSO will send “Blacko

  37. Slide 37: Communication systems Art 41

    Communication systems Art 41 Each TSO, DSO, SGU identified pursuant to Article 23(4) NC ER, and RSP shall have a voice communication system, or where foreseen a data communication system, implemented with sufficient equipment redundancy in case of failure of any individual communication system equip

  38. Slide 38: Market interactions

    Market interactions

  39. Slide 39: Market interactions

    Market interactions By 18 December 2018: - each TSO shall develop a proposal for rules concerning the suspension and restoration of market activities. Art 36(1) - each TSO shall develop a proposal for rules for imbalance settlement and settlement of balancing capacity and balancing energy which shal

Elia Group — Technical Presentation (April 2018) on 6ix