Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (August 2022)

32 slides from Pure Gold Mining's investor presentation, Aug 18, 2022

  1. Slide 1: The Heart of Red Lake

    The Heart of Red Lake. August 2022

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other jurisdi

  3. Slide 3: The PureGold Mine, The Next Chapter in Red Lake History

    The PureGold Mine, The Next Chapter in Red Lake History 3 3

  4. Slide 4: A Canadian Gold Mine with Tier-One Potential

    A CANADIAN GOLD MINE WITH TIER-ONE POTENTIAL PUREGOLD MINING INC. • 10-Million-Ounce Potential in Red Lake: Operating gold Strategic 47 km2 land package in the mine sitting on top of prospective exploration targets in Heart of Red Lake District world-class gold district • Robust, Data-Rich Technical

  5. Slide 5: 47km2 of Prime Gold Real Estate

    47KM2 OF PRIME GOLD REAL ESTATE THE PUREGOLD MINE 47 square kilometres 100% owned 20 current growth targets 7 key structures All based on significant alternation zones in preferred structural setting Drill testing at Gap and Derlak in 2021 confirmed mineralization at depth over significant widths 5

  6. Slide 6: A Mine on Top of Untapped Exploration Potential

    A MINE ON TOP OF UNTAPPED EXPLORATION POTENTIAL THE PUREGOLD MINE • The PureGold Mine has significant exploration potential with numerous targets supporting potential for more high-grade mineralization at depth, along strike and down-dip • Open extents of 8 Zone as well as other targets supports fut

  7. Slide 7: A Potential Game Changer: 8 Zone

    A POTENTIAL GAME CHANGER: 8 ZONE THE PUREGOLD MINE Goldcorp PureGold HGZ Discovery 8-Zone (1995)3 • Quartz veins in • Quartz veins in 8-Zone Geologic flexure along flexure along Setting mafic-ultramafic mafic-ultramafic contact contact Key Drill • 4.3m at 466 g/t Au • 9 holes averaging Intercepts •

  8. Slide 8: We've Barely Scratched the Surface

    WE’VE BARELY SCRATCHED THE SURFACE THE PUREGOLD MINE 1200 metre depth 8 Zone 2 1) A Technical Report prepared in accordance with NI 43-101 for the PureGold Mine will be filed on SEDAR (www.sedar.com) before September 24, 2022. Readers are encouraged to read the Technical Report in its entirety, incl

  9. Slide 9: We've Barely Scratched the Surface

    WE’VE BARELY SCRATCHED THE SURFACE THE PUREGOLD MINE 1200 metre depth 1995 8 Zone HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated are conceptual only and have been interpreted from very limited drilling data in

  10. Slide 10: Robust, Data-Rich Technical Foundation

    Robust, Data-Rich Technical Foundation 10

  11. Slide 11: Multi-Million Ounce, High Grade Deposit

    MULTI-MILLION OUNCE, HIGH GRADE DEPOSIT UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 1.65 million ounces Long Section of 2022 of gold at SRK Block Model 7.4 g/t within 6.9 million tonnes in the Indicated category 0.37 million ounces of gold at 6.3 g/t within 1.8 million tonnes in the Inferred categ

  12. Slide 12: A Strong Foundation for Future Growth

    A STRONG FOUNDATION FOR FUTURE GROWTH UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 ✓ Third-party review and ✓ 77 new sub-domain comprehensive update by SRK wireframes constructed to capture deeper ✓ Robust estimate that aligns understanding of mineralized closely with mining to date lenses Updated

  13. Slide 13: Transitioning to Austin & South Austin

    TRANSITIONING TO AUSTIN & SOUTH AUSTIN UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 Rotated Plan View of 2022 SRK Geological Domain Models McVeigh Austin & South Austin • 5% of Indicated ounces in • 89% of Indicated ounces in Madsen Deposit Madsen Deposit • Majority of mining to date • Accounts for

  14. Slide 14: Mineral Reserves & Resources

    MINERAL RESERVES & RESOURCES PUREGOLD MINING INC. Gold Grade Gold Troy Classification Deposit - Zone Tonnes (g/t) Ounces Indicated Resource – Ounces by Zone Indicated Resource – Grade by Zones Madsen – Austin 4,147,000 6.9 914,200 Russet McVeigh 20.0 Madsen – South 1% 1,696,000 8.7 474,600 5% Gold G

  15. Slide 15: Strong & Growing Production

    Strong & Growing Production 15

  16. Slide 16: On Track for Exceptional Third Quarter

    ON TRACK FOR EXCEPTIONAL THIRD QUARTER STRONG & GROWING PRODUCTION Recent Achievements & Upcoming Milestones: August 2022 ✓ Strong safety performance ✓ On track for record ore tonnage and gold • 128 consecutive safe days – new record production in Q3 • TRIFR down to 2.9 at end of June • Forecasting

  17. Slide 17: On Track for Exceptional Third Quarter

    ON TRACK FOR EXCEPTIONAL THIRD QUARTER STRONG & GROWING PRODUCTION Recent Achievements & Upcoming Milestones: August 2022 ✓ Significant cost improvements locked in; further ✓ Key hires made to bolster technical team and site opportunities remain leadership • Expecting ~$9.5-$10.5 million / month ope

  18. Slide 18: Updated Pre-Feasibility on Track for Q4 2022 Release

    UPDATED PRE-FEASIBILITY ON TRACK FOR Q4 2022 RELEASE STRONG & GROWING PRODUCTION Project Timeline Study Team Phase 2: Phase 1A: Phase 1B: Phase 1C: NI 43-101 Initial Trade-off Life of Mine Technical Review Studies Plan Report • Gap analysis • Mining methods ToS • Resource estimates • Technical repor

  19. Slide 19: Unconstrained Growth Potential

    Unconstrained Growth Potential 19

  20. Slide 20: Unconstrained Growth Potential

    UNCONSTRAINED GROWTH POTENTIAL PUREGOLD MINING INC. • The PureGold Mine was designed and financed in 2018/2019 and constructed in 2020 as a starter mine to fuel and fund future organic growth • The PureGold Mine has in place several key building blocks which underpin the mine’s future growth potenti

  21. Slide 21: PureGold Mine Tailings Facilities

    PUREGOLD MINE TAILINGS FACILITIES 21

  22. Slide 22: Tailings Facility Expansion

    TAILINGS FACILITY EXPANSION UNCONSTRAINED GROWTH POTENTIAL TAILINGS MANAGEMENT FACILITY • Near-term tailings capacity can be Derlak Lake Potential Long- increased through lifts to existing Term dams Tailings Facility • Longer term, significant tailings capacity could be added by incorporation of Der

  23. Slide 23: Existing Shaft Key to Mining Efficiently at Depth

    EXISTING SHAFT KEY TO MINING EFFICIENTLY AT DEPTH UNCONSTRAINED GROWTH POTENTIAL EXISTING 1,275 METRE SHAFT • The existing 1,275 metre deep shaft, headframe and hoisting system last operated in a production capacity in 1999 and last operated in an exploration support capacity in 2013 • Timbered shaf

  24. Slide 24: Mine Expansion

    MINE EXPANSION UNCONSTRAINED GROWTH POTENTIAL • Current west ramp was driven at 4.5 x 4.5m FUTURE RAMP DEVELOPMENT EXISTING RAMP DEVELOPMENT • Current east ramp was driven at EXISTING SHAFT 5 x 5m • Long-term strategy is to connect east ramp to west decommissioning the upper portion of the west ramp

  25. Slide 25: Excess Water Treatment Capacity

    EXCESS WATER TREATMENT CAPACITY UNCONSTRAINED GROWTH POTENTIAL NEW WATER TREATMENT PLANT • Mechanical completion in early 2021; commissioned in June 2021 • Moving Bed Biofilm Reactor (MBBR): o OCN and SCN removal o Nitrification o Denitrification o Re-oxygenation • Heavy Metal Removal o Metal precip

  26. Slide 26: Landmark First Nations Agreements

    LANDMARK FIRST NATIONS AGREEMENTS Partnership agreement in place establishes a long-term, mutually beneficial partnership between PureGold and Lac Seul and Wabaskang Nations. Confirms the First Nations collaboration with PureGold in support of the operational permitting process for the Project and a

  27. Slide 27: Deep Value Opportunity

    Deep Value Opportunity

  28. Slide 28: Deep Value Opportunity – Relative Value

    DEEP VALUE OPPORTUNITY – RELATIVE VALUE PUREGOLD MINING INC. Enterprise Value (US$ millions) 1, 2 Junior Gold Producers (<300 kozpa) Canadian Gold Developers $1,800 $1,600 Enterprise Value (US$M) $1,478 $1,400 $1,151 $1,200 $1,018 $983 $1,000 Avg. = $927 M $800 $665 $660 $686 $600 $600 $533 $484 $35

  29. Slide 29: Our growth story has only just begun

    Our growth story has only Just Begun. 29

  30. Slide 30: Leadership Team Focused on Operational Excellence

    LEADERSHIP TEAM FOCUSED ON OPERATIONAL EXCELLENCE Mark O’Dea Terry Smith Interim President & CEO, Director Chief Operating Officer • Ph.D, P.Geo, Mining Entrepreneur • Mining Engineer • +30 years’ experience • +20 years’ experience • Co-Founder and CEO of Fronteer Gold, Founder & Exec. Chair of True

  31. Slide 31: Corporate Snapshot

    PUREGOLD MINING INC CORPORATE SNAPSHOT ANALYST COVERAGE CAPITAL STRUCTURE 1 Basic Shares Outstanding 728.9 million Warrants 11.0M at $1.36, March 28, 2023 expiry 1.7M at $1.36, April 25, 2023 expiry 240.7 million 185M at $0.18, November 25, 2022 expiry 43M at $0.18, November 27, 2022 expiry Options

  32. Slide 32: Thank you

    Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Adrian O’Brien 1900 – 1055 West Hastings Street Director IR & Communications Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 809 6890 aobrien@puregoldmining.ca

PureGold Mining — Investor Presentation (August 2022) on 6ix